Darren Lee

Site Engineer at Shanghai Tunnel Engineering Co., Ltd.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
SG

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • CMFAS HI - Health Insurance
    Singapore College of Insurance Ltd
  • CMFAS M5 - Rules And Regulation For Financial Advisory Services
    Singapore College of Insurance Ltd
  • CMFAS M8 - Collective Investment Schemes
    Singapore College of Insurance Ltd
  • CMFAS M8A - Collective Investment Scheme II
    Singapore College of Insurance Ltd
  • CMFAS M9 - Life Insurance And Investment-Linked Policies
    Singapore College of Insurance Ltd
  • CMFAS M9A - Life Insurance And Investment-Linked Policies II
    Singapore College of Insurance Ltd
  • M1B - Rules and Regulation for Dealing in Securities
    IBFSG - The Institute of Banking & Finance Singapore
  • M6 - Securities Product and Analysis
    IBFSG - The Institute of Banking & Finance Singapore
  • M6A - Securities and Future Product Knowledge
    IBFSG - The Institute of Banking & Finance Singapore

Experience

    • China
    • Civil Engineering
    • 300 - 400 Employee
    • Site Engineer
      • Oct 2020 - Present

      Construction of N109A - North-South Corridor (Tunnel) and Cross Island Line Teck Ghee Station CR12 • Review contractors’ Method of Statements (MS), Endorsed Drawings, Risk Assessment (RA) and Safe Work Procedures (SWP) prior to commencement of works • Prepare and submit Permit To Dig (PTD) and Request For Inspections to the relevant parties and authorities (LTA and QPS team) in a timely manner to ensure control and quality check by both Shanghai Tunnel persons and Qualified Persons • Oversee, supervise and ensure Sub-contractor’s works (Excavation, Rebar Fabrication, Formwork Details and Casting) completed in a safe and timely manner to meet proposed Master Programme Temporary Works 1. Drain Diversion: • Successfully commissioned to PUB temporary Stage 1 Drain Diversion works for 500m of drains on each bound (South Bound and North Bound) • Backfilled and abandoned existing live drain after commissioning of newly live drain • Completed a section of Permanent Drains along Ang Mo Kio Ave 6 for final reinstatement 2. Road Diversion: • Successfully completed 2 Major Road Diversions (swinging of Amk Ave 6 lanes Southwards and bifurcation of Marymount Road) inclusive of Utilities Diversion and Drain Diversion 3. NSC North and South Excavation and Strutting Works Permanent Works 1. BKSR Water Diversion: • Laying of 2.2m and 1.8m diameter steel pipes in both open cut (32m width profile) and sheet piling ERSS scenarios • Ensure sufficient space for crawler crane working platform and access • Ensure engagement fulfilled under PUB's specifications, welding, air pressure and holiday test checked throughly by CWI • Commenced JGP works for Jacking Shaft breakthrough with 2.2m and 1.8m cladded pipes 2. Sewer Works: • Successfully commissioned majority of Sewer Diversion for Seletar Catchment • Jet Grout Pile (JGP) works for ground improvement prior to starting Kim Chuan catchment sewer diversion works 3. 1.8m Secant Bored Pile (SBP) and Foundation Bored Pile Works

    • United Kingdom
    • Banking
    • 700 & Above Employee
    • Branch Sales Manager
      • Aug 2019 - Oct 2020

      Manage and provide Financial Advisory on a range of Products for both the General Mass Market and Priority Banking clients to meet their short and/or long-term financial goals. This includes both Investments and Insurance products. - Advise on clients’ portfolios' Investments (Collective Investment Schemes, Securities and FX) based on current market conditions and their risk tolerance level to enhance their wealth. - Provide solutions to clients with lower risk tolerance on Insurance (Wealth Accumulation, Protection and Retirement Planning) seeking moderate to higher returns to preserve and accumulate their wealth. Dedicated to foster and deepen clients’ relations by providing regular market updates on local and financial products. Uphold diligence and integrity during the sales process in accordance with the Bank's and Regulation's quality assurance standards, while constantly meeting and exceeding sales target set by the management. The Product range for clients are listed below; - Investments: Collective Investment Scheme (Unit Trusts), Securities (Notes, Bonds, Equities), Structured Deposits, FX and Dual Currency Investments - Life Insurance: Advise on and/or arrange life policies to ensure Client's long term goal and legacy planning has been achieved/met - Loans: Premium Financing and Leveraging Achievements: - Achieved 100% New Client Acquisition Target of Wealth Products Sales - Consistently meet sales target

    • Truck Transportation
    • 700 & Above Employee
    • Civil Engineer
      • Aug 2017 - Aug 2019

      Appointed as the Team Leader to manage, lead and guide 2 key teams (Civil Structure (CS) Team and the Machine (MCH) Team) within the SBST Permanent Way (P-way) department to constantly ensure smooth running and execution of Monthly, Quarterly and Yearly Preventive Maintenance (PM) plan and Corrective Maintenance Works. - Reviewed and revised department maintenance's documents, validated and reviewed contract specifications and contractor's Schedule of Rates (SOR) according to approved budget allocation. - Managed the co-ordination of both Contractors, Management and Ground Staff to execute time-sensitive works to allow the smooth running of train services for the public. - Worked closely with the Professional Engineer (PE) to check the condition of all LRT Viaduct Bearings installments for the Sengkang - Punggol LRT - Worked closely with the Professional Engineer (PE) to check and rectify existing leakages of Tunnels of the whole North - East Line (NEL) system Key Achievements: - Proposed and executed changes to the maintenance plan for the year 2018 with 2 additional Preventive Maintenance (PM) regimes to prevent similar occurrence of SMRT tunnel flooding (2018) - Managed department's internal and external audits with SBST, LTA and third-party auditors (Examples are: LTA System Audit (2018), LTA Tunnel Sump Pumps Audit (2019), ISO 9001) - In-charge of the proper survey of the Viaduct Bearings for the Sengkang - Punggol LRT before handing over to LTA's appointed contractors to carry out Viaduct Bearing replacement works - Ensured the proper maintenance the P-Way system that led to the entire MRT network achieving a Mean Kilometres Between Failure* (MKBF) *MKBF measures the distance traveled between breakdown of more than 5 mins.

Education

  • Nanyang Technological University
    Bachelor's degree, Environmental/Environmental Health Engineering
    2014 - 2017
  • Nanyang Technological University
    Bachelor of Engineering - BE, Civil Engineering
    2014 - 2017

Community

You need to have a working account to view this content. Click here to join now