Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • South Africa
    • Civil Engineering
    • 1 - 100 Employee
    • Operations Manager
      • Feb 2022 - Present

    • France
    • Construction
    • 100 - 200 Employee
    • Business Development Engineer
      • Dec 2017 - Feb 2022

    • Business Development Engineer
      • Jun 2016 - Nov 2017

    • Estimator
      • May 2013 - May 2016

    • Quality Manager
      • May 2012 - Apr 2013

      Divisional Quality Manager.Responsible for ISO 9001 compliance of Head Office and Site Quality Management System.Internal Auditing.Site Quality Inspections and report writing.Monthly Quality Reporting.

    • Sub-Agent (Assistant Site Manager)
      • Jan 2012 - Apr 2012

      Kusile Power Station:Piling to the ChimneysPiling to the Material Handling Silos

    • Site Engineer
      • Nov 2009 - Jan 2012

      Kusile Power Station:Geotechnical Investigations (Diamond drilled boreholes).Piling to the main civil works (Auger drilled cast in-situ piles).Temporary Lateral Support wall Unit 1 & 2 de-gritting sump (Percussion drilled and grouted Soil Nails & Gunnite wall).Installation of Tension Dowels in piles (Percussion drilled and grouted).Compression, tension and lateral Load test on non-working test piles.

    • Student Engineer
      • Jun 2009 - Jul 2009

      Gautrain:Installation of titan soil nails at the Kelvin Rail Link.Installation of permanent lateral support wall of soil nails and floated gunnite to the Nel Mapius bridges leading and exit walls. Gautrain:Installation of titan soil nails at the Kelvin Rail Link.Installation of permanent lateral support wall of soil nails and floated gunnite to the Nel Mapius bridges leading and exit walls.

    • Student Engineer
      • Jan 2009 - Mar 2009

      Gauteng Freeway Improvement Project.Temporary Lateral Support Wall of soil nails, mesh and gunnite to the Malibongwe and William Nicol on and off ramps.Permanent Lateral Support Wall of soil nails, mesh and floated gunnite to the Malibongwe bridge and abutments.Odex piles for the braamfonteinspruit bridge extension.

    • Student Engineer
      • Nov 2008 - Dec 2008

      Grouting between a sleeve and main outlet water pipe of the Piet Gouws Dam in Limpopo.On site supervision of daily activities and compilation of a project report.

    • Student Engineer
      • Nov 2007 - Feb 2008

      Site Supervision, Scheduling, Ordering, Production. Site Supervision, Scheduling, Ordering, Production.

    • Student Engineer
      • Nov 2006 - Dec 2006

      Refurbishment of 3 storey apartment building in Greenside Johannesburg. Refurbishment of 3 storey apartment building in Greenside Johannesburg.

Education

  • University of the Witwatersrand
    Bachelor of Science (B.Sc.), Construction Management
    2005 - 2009
  • Witbank Technical High School
    Maths, Science, English, Afrikaans, Technical Drawing, Technica Civil, Biology, Matric
    2000 - 2004

Community

You need to have a working account to view this content. Click here to join now