Darrell Miller

Contractor at FortisAlberta
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
CA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Canada
    • Utilities
    • 700 & Above Employee
    • Contractor
      • Sep 2012 - Present

      Operational support for the SAP PM module including Compatible Units implementation. Carrying out initial design work for deployment of external services for IS contractors. Operational support for the SAP PM module including Compatible Units implementation. Carrying out initial design work for deployment of external services for IS contractors.

  • PwC Consulting
    • Calgary, Canada Area
    • Manager
      • May 2012 - Jul 2012

      As a member of the Pembina Pipeline – Provident Energy Integration Project team, revised the original Pembina Pipeline MM blue print documents to add the new Provident Energy business units. Developed initial technical design documents for interfacing Pembina’s SAP system to the existing Provident Energy Maximo Plant Maintenance system. As a member of the Pembina Pipeline – Provident Energy Integration Project team, revised the original Pembina Pipeline MM blue print documents to add the new Provident Energy business units. Developed initial technical design documents for interfacing Pembina’s SAP system to the existing Provident Energy Maximo Plant Maintenance system.

    • Canada
    • Oil and Gas
    • 700 & Above Employee
    • SAP Supply Chain Business Process Specialist
      • 2009 - Feb 2012

      Advised and managed the system design and configuration necessary to merge the Petro-Canada MM Module into Suncor's ERP system and processes, as a member of the ERP Consolidation Project Team. • Documented and implemented MM specific configuration including the enterprise structure, Purchasing, and Materials Requirements Planning. Also responsible for cross module configuration including units of measure and country/region data. • Designed and implemented functional specifications and acted as technical lead for the contracted technical resources working in the ECC MM module and provided technical direction to the SRM sub-team. • Streamlined and corrected existing problems in the Suncor system that increased efficiency and service delivery. • Managed the Materials Management and workflow support for the legacy Petro-Canada SAP systems.

  • Petro-Canada
    • Calgary, Alberta
    • SAP Business Process Specialist
      • 1998 - 2009

      As a member of the SAP SCM team managed the day to day operational support and new developments to meet the majority of the company’s SCM and inventory management needs. During this period, Petro-Canada was recognized as a SAP Centre of Excellence. • Coordinated Materials Management technical activities for 3 major SAP upgrades from 3.1H to 4.6B, from 4.6B to 4.7 and finally from 4.7 to 6.0. • Implemented technical and configuration changes, process changes, the development of training materials and the delivery of end-user training to meet ongoing business requirements. • Collaborated with other members of the SAP Supply Chain Management team to implement projects including:  Requisition approval workflow,  Canada Border Services Customs self assessment  MacKay River SAP implementation  Fort Hills initial SAP implementation  International and Offshore business MM implementation  External services management for plant maintenance  Vendor provincial sales tax registration numbers  RFQ, contract and consignment price downloads and uploads  Warehouse bar coding and mobile data entry (RF)

    • Canada
    • Oil and Gas
    • 700 & Above Employee
    • SAP Business Process Specialist Time Keeping
      • 1996 - 1997

      Primary functional and technical resource for the Amber Time Keeping bolt-on solution• Implemented solution for the Edmonton, Montreal and Burrard plants.• Optimized the support to the business needs through configuring time keeping rules and developing additional reporting.• Maintained support for all Time Keeping work relating to the SAP upgrade from 2.2E to 3.1H for all plants during this period.

    • SAP Technical Specialist
      • 1995 - 1996

      Member of the technical team supporting the Materials Management and Plant Maintenance module implementation for Petro-Canada’s Downstream and Lubricants business units. • Mapped, cleansed and loaded master data including equipment records, bills of material, functional locations and material masters.• Developed customized reports for Materials Management and Plant Maintenance business units.

    • Canada
    • Oil and Gas
    • 700 & Above Employee
    • Coordinator, PerformanceDownstream Western Region
      • 1992 - 1994

      Coordinated all Financial performance reporting for Western Region Downstream, interfacing with all regional groups to identify and correct operational and capital impacts. Responsible for ERCB reporting. Coordinated all Financial performance reporting for Western Region Downstream, interfacing with all regional groups to identify and correct operational and capital impacts. Responsible for ERCB reporting.

    • Canada
    • Oil and Gas
    • 700 & Above Employee
    • Senior Process Engineer
      • 1986 - 1991

      As a senior process engineer, I was a member of the cross-functional refinery team comprised of Maintenance, Operations, Engineering and Planning, that was entrusted with the optimization, reliability and safety of daily refinery operations and gained operating experience on most of the refinery processes. During unit turnarounds, I also supervised and coordinated the activities of outside contractors and refinery operations staff relating to catalyst change outs. Responsible for initiating and evaluating the technical feasibility of capital projects for my unit areas. This included developing project economics and justification.

    • Computer Projects Engineer
      • 1984 - 1986

      Part of a two member refinery team entrusted with developing, implementing and training staff on the Refinery Volumetric Accounting system. Received a letter of commendation from the President of Gulf Canada Products for work on this project.

    • Supervisor of Financial Analysis and Special Projects
      • 1982 - 1984

      Member of a five member company-wide Financial Control Productivity team entrusted with evaluating and implementing the automation of accounting functions common to all refineries. Designed and implemented new systems, trained staff at all locations. Received a letter of commendation from the Vice-President of Gulf Canada Products for work on this project. Member of the Refinery Management Information System team, that developed functional specifications and data flows for an integrated accounting and volumetric system. Study cost $500K.Managed a staff of three responsible for refinery volumetric and operational functions.

    • Process Engineer
      • 1981 - 1982

      Process engineer in charge of utilities area of refinery.

Education

  • University of Alberta
    Master of Business Administration (MBA)
  • University of Alberta
    Bachelor of Science (B.Sc.), Chemical Engineering

Community

You need to have a working account to view this content. Click here to join now