Darkie Lee

Senior Geotechnical Engineer at Civil Engineering and Development Department (CEDD), Hong Kong SAR Government
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Hong Kong SAR, HK
Languages
  • English Professional working proficiency
  • Chinese Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Senior Geotechnical Engineer
      • 2011 - Present

      Automated Systems for Concrete Cube and Steel Rebar Testing in Public Works Laboratories Geotechnical control on public and private development works, including MTR South Island Line's 904 Lei Tung Station Cavern and tunnels, SOH Station, open-cast blasting works at Ap Lei Chau; 902 Nam Fung Tunnel; landslide attendance Regulatory control of the use, storage and delivery of explosives and surface and underground blasting works: CEDD Tseung Kwan O- Lam Tin Tunnel, Trunk Road T2 - Cha Kwo Ling Tunnel, HyD Central Kowloon Route, Lam Tei Quarry, EPI blasting at Queen Mary Hospital Redevelopment site, DSD Shatin Sewerage Treatment Caverns, WSD Diamond Hill Service Reservoirs Cavern, EPD WENTX Landfill Studies on potential new quarries (surface and underground) and concrete supply in Hong Kong Management of Lam Tei Quarry (revenue-earning contract), Government Explosives Depots, explosives delivery, QRA on explosives depots and delivery, regulatory control of fireworks at Disneyland Theme Park Show less

    • Hong Kong
    • Rail Transportation
    • 700 & Above Employee
    • Tunnel and Cavern Engineer
      • 2009 - 2011

      Geotechnical Supervision on design and construction of running tunnels (SYP-HKU-KET), 2 rock caverns (HKU and SYP Stations, each 23m wide x 16m high), adits, deep shafts, mini-caverns, C&C and the underground magazine (with 8 explosive caverns and 1 detonator cavern) and TBM segmental lining in both hard rock and soft ground in a densely populated environment. Geotechnical Supervision on design and construction of running tunnels (SYP-HKU-KET), 2 rock caverns (HKU and SYP Stations, each 23m wide x 16m high), adits, deep shafts, mini-caverns, C&C and the underground magazine (with 8 explosive caverns and 1 detonator cavern) and TBM segmental lining in both hard rock and soft ground in a densely populated environment.

    • United Kingdom
    • Engineering Services
    • 700 & Above Employee
    • Tunnel Engineer
      • 1998 - 2009

      Tunnel Design: WSD Tai Po to Butterfly Valley Tunnels, KCRC West Rail Kwai Tsing Tunnels, Kowloon Southern Link; HyD Central Kowloon Route, MTR West Island Line, South Africa Gautrain, etc. Independent Checking: KCRC Lok Ma Chau Spur Line; MTR Penny’s Bay Line; KCRC Kowloon Southern Link; DSD Tsuen Wan Drainage Tunnel, etc. Design Supervision: CLP Castle Peak Cable Tunnel Tunnel Design: WSD Tai Po to Butterfly Valley Tunnels, KCRC West Rail Kwai Tsing Tunnels, Kowloon Southern Link; HyD Central Kowloon Route, MTR West Island Line, South Africa Gautrain, etc. Independent Checking: KCRC Lok Ma Chau Spur Line; MTR Penny’s Bay Line; KCRC Kowloon Southern Link; DSD Tsuen Wan Drainage Tunnel, etc. Design Supervision: CLP Castle Peak Cable Tunnel

    • Hong Kong
    • Construction
    • 400 - 500 Employee
    • Site Engineer Trainee
      • 1997 - 1997

Education

  • 香港科技大學
    Civil and Structural engineering

Community

You need to have a working account to view this content. Click here to join now