Dario Pavel Hernandez Saldaña

Quality New Projects Engineer Jr at Pacific Engineering Corporation
  • Claim this Profile
Contact Information
Location
MX

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • United States
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Quality New Projects Engineer Jr
      • Sep 2022 - Present

      Gestión y desarrollo de nuevos productos de stamping steel and aluminum with E-Coating. Administración y desarrollo de actividades de acuerdo a los requerimientos de calidad del cliente. Gestión y desarrollo de nuevos productos de stamping steel and aluminum with E-Coating. Administración y desarrollo de actividades de acuerdo a los requerimientos de calidad del cliente.

    • United States
    • Plastics Manufacturing
    • 100 - 200 Employee
    • Quality Planning
      • May 2022 - Sep 2022

      Gestión y desarrollo de nuevos proyectos de inyección y ensamble de componentes para requerimientos documentales internos y externos del cliente. Gestión y desarrollo de nuevos proyectos de inyección y ensamble de componentes para requerimientos documentales internos y externos del cliente.

    • Canada
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Quality Assurance Engineer
      • Jun 2021 - Apr 2022

      Follow-up to PPAP folder (BOS automotive, Dräxlmaier, S&A, Plastic Omnium, etc)Part of the development of DF, PMFEA, CP.Preparation of R@R.Definition of Master Samples & Boundary Samples with Costumers.Documentation follow-up for approval (e-mail & client portal).Development of DVP for testing (plastic parts).Development of inspection instructions.Management and development of specific customer requirements.Attention to customer requirements during the project phase and 3 months production.Process auditsRoot cause analysis for client issue based on 5W methodology.Implementation cooling fixture for new projects (Plastic pieces).Quality alerts for client issueDimensional Reports for new projects (Plastic parts).Scan to molds for release. (Dimensional report)Release of parts for molds according to drawing.Release Control Fixture.Release of the first piece (Using fixture, Caliper, Height Caliper, Lighthouse Edge, appearance, etc.).Coordinate R&R studies.Coordinate calibration of measurement equipment.Calibration of measuring equipment (Caliper, micrometer, go-notgo, etc)

    • Quality Control Intern
      • Mar 2021 - Jun 2021

      Soporte al departamento de calidad en las áreas de inyección y soplado de piezas plásticas.Así como apoyo al área de proyectos con documentación de ingeniería (DF, PFMEA, CP, R@R, PSW, Part History).

    • Germany
    • Manufacturing
    • 700 & Above Employee
    • Move Challenge
      • Feb 2020 - Apr 2020

      Competition between universities of Guanajuato, Mexico. Six sigma project reduction of scrap Competition between universities of Guanajuato, Mexico. Six sigma project reduction of scrap

Education

  • Instituto Politécnico Nacional
    Ingeniería Sistemas Automotrices, Manufacture
    2017 - 2021

Community

You need to have a working account to view this content. Click here to join now