Darin Owens

Heavy Civil department Survey supervisor at AUI Contractors
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Fort Worth, Texas, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Mike Lee

I tried to hire Darin but he was loyal to Rodman at the time. Darin came highly recommended from all the sources I spoke with but I could not get him away. It was T & R's loss.

Mike Kszyminski

I found Darin displayed a great deal of integrity and concern for growing the experience and professional development of his subordinates.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Construction
    • 100 - 200 Employee
    • Heavy Civil department Survey supervisor
      • Nov 2013 - Present

    • President/Owner
      • Dec 2011 - Present

      Field calculations, (sewer, water, storm, paving)topo data reduction. Change of condition exhibits ACAD, and RFI's if needed. Field calculations, (sewer, water, storm, paving)topo data reduction. Change of condition exhibits ACAD, and RFI's if needed.

    • Field engineering supervisor
      • Apr 2011 - Dec 2011

      Wet, and dry utilities, sub-surface, and above ground appurtences, site clarification and reports, and training of subordinate personel. Wet, and dry utilities, sub-surface, and above ground appurtences, site clarification and reports, and training of subordinate personel.

    • QC Drafting dept.
      • 2011 - 2011

      Created exhibits based on legal descriptions/metes, and bounds obtained using Civil3D, and confirmed drawings from draftsmen before submittal. Created exhibits based on legal descriptions/metes, and bounds obtained using Civil3D, and confirmed drawings from draftsmen before submittal.

    • Assistant Project Manager
      • May 2007 - Jan 2010

      Managed 6, 2 man survey crews and was Responsible for all field calculations of sewer, water, storm drain, electrical, communication, and catenary system elements, station platforms, canopy columns, local drainage and irrigation to landscape areas at each station. RFI submittals, change of condition documents, and utility conflict exhibits for submittal to client. Established centerline column locations with 2 linear, and 2 lateral offsets with grades to top of footing, top of column. Profiled beams before placement, and monitored pours in order to verify elevation and ensured they were being erected plumb. Create working abstract maps with auto cad off of deed information located obtained from county courthouses, and establish ROW parcels for future fee take applications. Public relations with sub-contractors and homeowners regarding amicable means of completing assigned tasks as expeditiously as possible. Maintained ballasted track alignment at ingress to the 3 at grade station platforms, and egress out of said "at grade" station platforms, and headers to ensure proper clearances (1/16"/.005) were maintained at all times. And alignments of D/F (Direct fixated) track at all aerial platforms. Show less

    • Project Manager
      • Jan 2006 - May 2007

      Performed all field calculations, responsible for production of 14 production crews and coordinated pipe crews arrivals to job locations, attended all preconstruction meetings and maintained excellent working relationship with sub-contractors. Initiated requests for information, and instigated/confirmed change orders, and cost reports stemming from design discrepancies, and/or associative civil attributes that required immediate attention. Performed all field calculations, responsible for production of 14 production crews and coordinated pipe crews arrivals to job locations, attended all preconstruction meetings and maintained excellent working relationship with sub-contractors. Initiated requests for information, and instigated/confirmed change orders, and cost reports stemming from design discrepancies, and/or associative civil attributes that required immediate attention.

    • Chief of field parties
      • 2003 - 2004

      Located rail, post derailment, recalculated location, and restablished horizontally, and vertically, the location for the alignment. Calculated locations for switches, diamonds, sidings, and frogs when it was ordered. Per whatever super elev, and speed of the track. Usually about a 1/4 inch(.025+/-) every ten feet. Located rail, post derailment, recalculated location, and restablished horizontally, and vertically, the location for the alignment. Calculated locations for switches, diamonds, sidings, and frogs when it was ordered. Per whatever super elev, and speed of the track. Usually about a 1/4 inch(.025+/-) every ten feet.

  • precision
    • Alb, NM
    • Party Chief
      • 2002 - 2003

      Layout of all civil attributes to numerous residential, and commercial tracts. Boundary traverses/locations and layout. Layout of all civil attributes to numerous residential, and commercial tracts. Boundary traverses/locations and layout.

    • Senior chief
      • 2001 - 2002

      All surface, and sub-surface civil attributes to numerous residential, and commercial tracts. All surface, and sub-surface civil attributes to numerous residential, and commercial tracts.

  • Site Concrete
    • Grand Prairie, Texas
    • Field engineering manager
      • 2000 - 2001

      Responsible for all field calculations for 3, 3 man crews. Training of subordinate personel, and supervision of daily activities, production costs, payroll, and quality control. Responsible for all field calculations for 3, 3 man crews. Training of subordinate personel, and supervision of daily activities, production costs, payroll, and quality control.

  • Wier and associates
    • Arlington, Texas
    • Field coordinator
      • 1993 - 1999

      Responsible for all field calculations for 3, 3 man crews. And created abstract maps for crews boundary recon. Reduced traverses and established replacement of property corners if needed. If not needed, did a best fit, or called plat and actual. Responsible for all field calculations for 3, 3 man crews. And created abstract maps for crews boundary recon. Reduced traverses and established replacement of property corners if needed. If not needed, did a best fit, or called plat and actual.

Education

  • The University of Texas at Arlington
    Advanced survey mathmatics
    2001 - 2001
  • Texas agricultural and mechanical college
    Advanced land surveying short course
    2001 - 2001

Community

You need to have a working account to view this content. Click here to join now