Darin Owens
Heavy Civil department Survey supervisor at AUI Contractors- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Mike Lee
I tried to hire Darin but he was loyal to Rodman at the time. Darin came highly recommended from all the sources I spoke with but I could not get him away. It was T & R's loss.
Mike Kszyminski
I found Darin displayed a great deal of integrity and concern for growing the experience and professional development of his subordinates.
Mike Lee
I tried to hire Darin but he was loyal to Rodman at the time. Darin came highly recommended from all the sources I spoke with but I could not get him away. It was T & R's loss.
Mike Kszyminski
I found Darin displayed a great deal of integrity and concern for growing the experience and professional development of his subordinates.
Mike Lee
I tried to hire Darin but he was loyal to Rodman at the time. Darin came highly recommended from all the sources I spoke with but I could not get him away. It was T & R's loss.
Mike Kszyminski
I found Darin displayed a great deal of integrity and concern for growing the experience and professional development of his subordinates.
Mike Lee
I tried to hire Darin but he was loyal to Rodman at the time. Darin came highly recommended from all the sources I spoke with but I could not get him away. It was T & R's loss.
Mike Kszyminski
I found Darin displayed a great deal of integrity and concern for growing the experience and professional development of his subordinates.
Experience
-
AUI Partners
-
Construction
-
100 - 200 Employee
-
Heavy Civil department Survey supervisor
-
Nov 2013 - Present
-
-
-
OwensEnterprises consulting
-
Fort Worth
-
President/Owner
-
Dec 2011 - Present
Field calculations, (sewer, water, storm, paving)topo data reduction. Change of condition exhibits ACAD, and RFI's if needed. Field calculations, (sewer, water, storm, paving)topo data reduction. Change of condition exhibits ACAD, and RFI's if needed.
-
-
-
Ferrovial Agroman-BBC
-
HEB area Texas
-
Field engineering supervisor
-
Apr 2011 - Dec 2011
Wet, and dry utilities, sub-surface, and above ground appurtences, site clarification and reports, and training of subordinate personel. Wet, and dry utilities, sub-surface, and above ground appurtences, site clarification and reports, and training of subordinate personel.
-
-
-
-
QC Drafting dept.
-
2011 - 2011
Created exhibits based on legal descriptions/metes, and bounds obtained using Civil3D, and confirmed drawings from draftsmen before submittal. Created exhibits based on legal descriptions/metes, and bounds obtained using Civil3D, and confirmed drawings from draftsmen before submittal.
-
-
-
Archer Western Herzog JV
-
Dallas, Texas
-
Assistant Project Manager
-
May 2007 - Jan 2010
Managed 6, 2 man survey crews and was Responsible for all field calculations of sewer, water, storm drain, electrical, communication, and catenary system elements, station platforms, canopy columns, local drainage and irrigation to landscape areas at each station. RFI submittals, change of condition documents, and utility conflict exhibits for submittal to client. Established centerline column locations with 2 linear, and 2 lateral offsets with grades to top of footing, top of column. Profiled beams before placement, and monitored pours in order to verify elevation and ensured they were being erected plumb. Create working abstract maps with auto cad off of deed information located obtained from county courthouses, and establish ROW parcels for future fee take applications. Public relations with sub-contractors and homeowners regarding amicable means of completing assigned tasks as expeditiously as possible. Maintained ballasted track alignment at ingress to the 3 at grade station platforms, and egress out of said "at grade" station platforms, and headers to ensure proper clearances (1/16"/.005) were maintained at all times. And alignments of D/F (Direct fixated) track at all aerial platforms. Show less
-
-
-
-
Project Manager
-
Jan 2006 - May 2007
Performed all field calculations, responsible for production of 14 production crews and coordinated pipe crews arrivals to job locations, attended all preconstruction meetings and maintained excellent working relationship with sub-contractors. Initiated requests for information, and instigated/confirmed change orders, and cost reports stemming from design discrepancies, and/or associative civil attributes that required immediate attention. Performed all field calculations, responsible for production of 14 production crews and coordinated pipe crews arrivals to job locations, attended all preconstruction meetings and maintained excellent working relationship with sub-contractors. Initiated requests for information, and instigated/confirmed change orders, and cost reports stemming from design discrepancies, and/or associative civil attributes that required immediate attention.
-
-
-
-
Chief of field parties
-
2003 - 2004
Located rail, post derailment, recalculated location, and restablished horizontally, and vertically, the location for the alignment. Calculated locations for switches, diamonds, sidings, and frogs when it was ordered. Per whatever super elev, and speed of the track. Usually about a 1/4 inch(.025+/-) every ten feet. Located rail, post derailment, recalculated location, and restablished horizontally, and vertically, the location for the alignment. Calculated locations for switches, diamonds, sidings, and frogs when it was ordered. Per whatever super elev, and speed of the track. Usually about a 1/4 inch(.025+/-) every ten feet.
-
-
-
precision
-
Alb, NM
-
Party Chief
-
2002 - 2003
Layout of all civil attributes to numerous residential, and commercial tracts. Boundary traverses/locations and layout. Layout of all civil attributes to numerous residential, and commercial tracts. Boundary traverses/locations and layout.
-
-
-
-
Senior chief
-
2001 - 2002
All surface, and sub-surface civil attributes to numerous residential, and commercial tracts. All surface, and sub-surface civil attributes to numerous residential, and commercial tracts.
-
-
-
Site Concrete
-
Grand Prairie, Texas
-
Field engineering manager
-
2000 - 2001
Responsible for all field calculations for 3, 3 man crews. Training of subordinate personel, and supervision of daily activities, production costs, payroll, and quality control. Responsible for all field calculations for 3, 3 man crews. Training of subordinate personel, and supervision of daily activities, production costs, payroll, and quality control.
-
-
-
Wier and associates
-
Arlington, Texas
-
Field coordinator
-
1993 - 1999
Responsible for all field calculations for 3, 3 man crews. And created abstract maps for crews boundary recon. Reduced traverses and established replacement of property corners if needed. If not needed, did a best fit, or called plat and actual. Responsible for all field calculations for 3, 3 man crews. And created abstract maps for crews boundary recon. Reduced traverses and established replacement of property corners if needed. If not needed, did a best fit, or called plat and actual.
-
-
Education
-
The University of Texas at Arlington
Advanced survey mathmatics -
Texas agricultural and mechanical college
Advanced land surveying short course