Dariela Natera
Computer Aided Design Drafter at Integrity Structural Corp.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English and Spanish Native or bilingual proficiency
Topline Score
Bio
Experience
-
Integrity Structural Corp.
-
United States
-
Architecture and Planning
-
1 - 100 Employee
-
Computer Aided Design Drafter
-
Aug 2022 - Present
-
-
-
-
Valuadora
-
Jan 2009 - Jan 2011
Calculated the quantities and the cost of materials, equipment and labor to determine the viability of the project. Developed drawings in CAD for the newly acquired facilities, updating and maintaining the existing documentation of them. Calculated the quantities and the cost of materials, equipment and labor to determine the viability of the project. Developed drawings in CAD for the newly acquired facilities, updating and maintaining the existing documentation of them.
-
-
-
-
Administration of Civil Works
-
Dec 2005 - Dec 2008
Visited the project during construction to monitor progress and consult with contractors and engineers working in the field. Budget, Valuations, Tenders, Metric Calculations, AutoCAD. Developed drawings in CAD for the newly acquired facilities, updating and maintaining the existing documentation of them. Visited the project during construction to monitor progress and consult with contractors and engineers working in the field. Budget, Valuations, Tenders, Metric Calculations, AutoCAD. Developed drawings in CAD for the newly acquired facilities, updating and maintaining the existing documentation of them.
-
-
-
-
Administration of Civil Works
-
Aug 2004 - Nov 2005
Budget, Valuations, Tenders, Metric Calculations. Calculated the quantities and the cost of materials, equipment and labor to determine the viability of the project. Budget, Valuations, Tenders, Metric Calculations. Calculated the quantities and the cost of materials, equipment and labor to determine the viability of the project.
-
-
-
-
Valuadora
-
Feb 2004 - Aug 2005
Calculated the quantities and the cost of materials, equipment and labor to determine the viability of the project. Calculated the quantities and the cost of materials, equipment and labor to determine the viability of the project.
-
-
-
-
Operation of Lulo Win. (Costs)
-
Jan 2003 - Jan 2004
Calculated the quantities and the cost of materials, equipment and labor to determine the viability of the project. Calculated the quantities and the cost of materials, equipment and labor to determine the viability of the project.
-
-
-
-
Works Inspector
-
Jul 2002 - Jan 2003
Inspected the project works to monitor progress and compliance with design specifications, safety protocols and sanitary standards. Inspected the project works to monitor progress and compliance with design specifications, safety protocols and sanitary standards.
-
-
Education
-
Lone Star College
Current Student, CAD/CADD Drafting and/or Design Technology/Technician -
Instituto Universitario Politécnico Santiago Mariño
Engineer's degree, Engineering