Dany Aryanzah

Senior Officer Asset Management at PT Pelindo Solusi Logistik
  • Claim this Profile
Contact Information
Location
North Jakarta, Jakarta, Indonesia, ID

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Indonesia
    • Transportation, Logistics, Supply Chain and Storage
    • 1 - 100 Employee
    • Senior Officer Asset Management
      • Mar 2022 - Present

      The responsibilities consist of two : infrastructure planning and asset optimization. Infrastructure planning (the development of port-integrated industrial estate at Kijing, West Kalimantan and Kuala Tanjung, North Sumatera) : • Develop the financial model to re-assess project feasibility , which included revenue projections, cost estimations, cash flow analysis. • Conduct sensitivity analysis prior to the negotiation with partners. • Re-evaluate the masterplan (identifying the required infrastructure and services, such as pipe rack, estate roads, electricity, water supply, and logistic supporting facilities). Asset optimization (land, port infrastructure and port equipment): • Evaluate the assets performance and identified the highest and best use for each asset. • Analyze market conditions and explored opportunities to optimize the value and performance of the assets. • Develop online asset performance review dashboard to monitor the asset utilization and availability. • Supervise the development of database and marketplace for managed assets. • Re-organize 5 container depots in The Port of Banjarmasin, including re-arranged the flow of operation, planned the relocation of equipment, to optimize the efficiency and effectiveness. Show less

    • Architecture and Planning
    • Junior Civil Engineer
      • Aug 2020 - Mar 2022

      In the development of The Port of Kijing, West Kalimantan, as a National Strategic Project, my key responsibilities included : • Managed the construction and engineering works, ensured the adherence to design specifications and quality standards. • Facilitated land acquisition processes and coordinated the relocation of government's assets as well as addressed stakeholders' aspirations. • Coordinated land clearing activities for port supporting area and ensured the necessary land was prepared. Show less

    • Indonesia
    • Maritime Transportation
    • 500 - 600 Employee
    • Management Trainee
      • Aug 2019 - Aug 2020

      • Analyzed all the business process of the company and suggested the improvement. • Final project : a study to enhance the partnerships model between Port of Panjang and private terminals in terms of operation and commercial as well as making a real time dashboard of revenue and operational performance. • Analyzed all the business process of the company and suggested the improvement. • Final project : a study to enhance the partnerships model between Port of Panjang and private terminals in terms of operation and commercial as well as making a real time dashboard of revenue and operational performance.

    • Indonesia
    • Civil Engineering
    • 1 - 100 Employee
    • Project Engineer
      • Nov 2017 - Aug 2019

      Working under East Marine Pte Ltd, as a Project Engineer and subsequently the Head of Operations, I was involved in the marine construction works such as dredging, GRP pipe installation, and GRP pipe removal. In this role, my key responsibilities included: • Strategically planned daily site activities to optimize construction and dredging productivity. • Effectively managed manpower, equipment, schedule, and fuel costs. • Conducted thorough analysis and evaluation of construction methods to ensure efficiency and effectiveness. • Calculated revenue and assessed potential losses to maintain financial viability. • Proactively prepared for future potential projects by focusing on commercial and business development aspects. Show less

    • Oil and Gas
    • 700 & Above Employee
    • Pipeline Engineer Intern
      • Jun 2016 - Jul 2016

      Found the root cause of leakage on 3-phases subsea pipeline and determined the most suitable method for repairing. Found the root cause of leakage on 3-phases subsea pipeline and determined the most suitable method for repairing.

Education

  • Institut Teknologi Bandung (ITB)
    Bachelor's degree, Ocean Engineering
    2013 - 2017
  • Digital Skola
    Data Science
    2022 - 2022

Community

You need to have a working account to view this content. Click here to join now