Daniyal Abbasi

Project Engineer at Insulation Contractors Inc
  • Claim this Profile
Contact Information
Location
Washington DC-Baltimore Area
Languages
  • English Native or bilingual proficiency
  • Urdu Native or bilingual proficiency

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Lean Six Sigma Foundations
    Project Management Institute
    Aug, 2022
    - Sep, 2024
  • Six Sigma Principles
    University System of Georgia
    Mar, 2021
    - Sep, 2024
  • Supply Chain Operations
    Rutgers University
    Nov, 2020
    - Sep, 2024
  • Supply Chain Principles
    Georgia Institute of Technology
    Nov, 2020
    - Sep, 2024
  • Supply Chain Logistics
    Rutgers University
    Oct, 2020
    - Sep, 2024
  • Enterprise Blockchain Overview
    IEEE
    May, 2020
    - Sep, 2024

Experience

    • United States
    • Construction
    • 1 - 100 Employee
    • Project Engineer
      • Jan 2023 - Present

      • Utilize MIKE (Mechanical Insulation Key Estimator) software for precise materials and labor estimation for commercial and industrial insulation and heat tracing projects. • Efficiently manage multiple projects, including change orders, material ticket pricing, job site work and safety inspections, and financial tracking, resulting in improved project performance by 15% and cost control, ultimately resulting in increased profits. • Collaborate with material vendors, negotiate buyout agreements for new projects, and enhance cost-effectiveness. • Introduced weekly Job Tracking for large-scale commercial projects, increasing productivity by 30%. Show less

    • Trainee Production Engineer
      • Dec 2020 - Feb 2021

      • Played a pivotal role in scaling up Pakistan's largest and newly erected PET recycling plant, achieving full operational capacity 9.5TPH input capacity and 6.7TPH output capacity within two months. • Implemented Lean tools, including Kaizen, 5S, and Value Stream Mapping, to identify and eliminate waste, enhancing operational efficiency. • Conducted time and motion studies, maintained quality control, and supervised production operations, reducing plant shutdowns by 40%. • Assisted with other manufacturing support roles as needed. Show less

    • Internee
      • Feb 2020 - Feb 2020

      • Intern in the Powerhouse department, Mechanical department and Polymerization department. • Participated in process improvement initiatives, submitted end of day report to the superior. • Intern in the Powerhouse department, Mechanical department and Polymerization department. • Participated in process improvement initiatives, submitted end of day report to the superior.

    • Pakistan
    • Motor Vehicle Manufacturing
    • 300 - 400 Employee
    • Internee
      • Sep 2019 - Oct 2019

      • Intern in the Press Shop at the Body Manufacturing Plant for commercial vehicles. • Monitored material supply flow and identified and reduced the bottlenecks by 10% overall. • Identified defects and wasteful activities in daily operations, reduce the time for changeovers of the dies by 7% overall to maximize the stamping of the parts, prepared daily parts production reports. • Intern in the Press Shop at the Body Manufacturing Plant for commercial vehicles. • Monitored material supply flow and identified and reduced the bottlenecks by 10% overall. • Identified defects and wasteful activities in daily operations, reduce the time for changeovers of the dies by 7% overall to maximize the stamping of the parts, prepared daily parts production reports.

    • Pakistan
    • Motor Vehicle Manufacturing
    • 100 - 200 Employee
    • Internee
      • Feb 2019 - Feb 2019

      • Intern in the production department for shocks and struts being manufactured for Toyota. • Planned, scheduled, and monitored material movement in the production cycle to ensure continuous operations. • Performed time and motion study, identified the average percentage of defective parts in a day’s production, submitted an end of day report to the superior. • Intern in the production department for shocks and struts being manufactured for Toyota. • Planned, scheduled, and monitored material movement in the production cycle to ensure continuous operations. • Performed time and motion study, identified the average percentage of defective parts in a day’s production, submitted an end of day report to the superior.

Education

  • Lamar University
    Master of Engineering - MEng, Industrial Engineering
    2021 - 2022
  • NED University of Engineering and Technology
    Bachelor of Engineering - BE, Industrial Engineering
    2016 - 2020
  • Bahria College Karsaz
    Intermediate (High School), Pre-Engineering
    2014 - 2016

Community

You need to have a working account to view this content. Click here to join now