Daniel Wang
Process & CI Asst. Manager at COSMAX NBT / BIO- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Credentials
-
Lean Six Sigma: Analyze, Improve, and Control Tools
LinkedInSep, 2021- Sep, 2024 -
Project Management Foundations
LinkedInSep, 2021- Sep, 2024 -
Six Sigma: Green Belt
LinkedInSep, 2021- Sep, 2024 -
Critical Thinking and Problem Solving
LinkedInAug, 2021- Sep, 2024 -
Lean Six Sigma Foundations
LinkedInAug, 2021- Sep, 2024 -
The Data Science of Healthcare, Medicine, and Public Health, with Barton Poulson
LinkedInAug, 2021- Sep, 2024
Experience
-
COSMAX NBT / BIO
-
South Korea
-
Food and Beverage Manufacturing
-
1 - 100 Employee
-
Process & CI Asst. Manager
-
Jan 2023 - Present
-
-
NPD Supervisor
-
Dec 2020 - Dec 2022
-
-
-
australian pharmaceutical manufacuturers
-
Australia
-
Pharmaceutical Manufacturing
-
1 - 100 Employee
-
Technical Scientist
-
Jan 2018 - Nov 2020
Product Management Drafting the formulation for new product Preparing the quotation for the customer. Including raw material, packaging, and labour cost. Conducting/monitoring lab and product pilot batch trial Generating Manufacturing Batch Record (MBR) and Packaging Batch Record (PBR) and Finished Product Specifications (FPS) Generating Operator Instructions (OI) and Standard Operating Procedure (SOP) and providing training to the team Cooperating in between Supply Chain, Quality and Production to ensure the new products meet the customer requirements and timeline. Continuous Improvement Initiative Waste Reduction Project - Review the formulations and seek the opportunities to achieve cost effective and also benefit the production. • Development and maintenance of Operation Excellence tools including Labour Allocation boards, Short Interval Control board (SIC Board), Shift Performance board and utilize OEE (Overall Equipment Effectiveness) data to identify the downtime/issues in the manufacturing process. • Experience with Deviations, Change Controls, CAPA (Corrective active and Preventative action) and Re-work documents. Applying root cause analysis tools (e.g., 5 whys, DMAIC, and Fish Bone) to derive resolution and place actions. Show less
-
-
Education
-
University of Sydney
Master's degree, Mechanical Engineering -
University of Sydney
Master of Engineering - MEng