Experience
-
Global Topografia
-
Brazil
-
Civil Engineering
-
1 - 100 Employee
-
Tunnel shift engineer
-
Aug 2021 - Present
Surveying works at some projects of Geotunel group - High Speed Basque Y, Section: Bergara Junction, JV Angiozar (Basque country, Spain) - Tube of Porto: Yellow line. JV Ferrovial / Aca (Porto, Portugal) Surveying works at some projects of Geotunel group - High Speed Basque Y, Section: Bergara Junction, JV Angiozar (Basque country, Spain) - Tube of Porto: Yellow line. JV Ferrovial / Aca (Porto, Portugal)
-
-
-
CVB JV (Costain, Vinci, Bachy) - Tideway Thames Tunnel, East section. London
-
London, Reino Unido
-
SCL Shift engineer
-
Nov 2019 - Mar 2020
SCL launch adit at Greenwich site for the Greenwich connection tunnel. Type of material: Chalk SOS briefing, permits, supervise activities, face logs, ensure ITP and safety compliance, reporting SCL launch adit at Greenwich site for the Greenwich connection tunnel. Type of material: Chalk SOS briefing, permits, supervise activities, face logs, ensure ITP and safety compliance, reporting
-
-
-
FCC Construcción
-
Spain
-
Construction
-
700 & Above Employee
-
Surveyor - Setting out
-
May 2019 - Sep 2019
High speed León - Asturias; Section: La Robla - Campomanes (Derivation of Pajares). Spain The project consisted of 42 km of installation of track for mixed traffict on slab or ballast, polyvalent concrete sleeper and triple track to allow different gauges, Iberian and standard. The main element of this project was the 25 km twin Pajares tunnel. Functions: Previous survey works on site prior to the begining of works: Setting out, set of angles, precisse levelling, topo surveys, referencing points. Contract ended due to reorganization of staff in the company. Show less
-
-
-
FLO (Ferrovial Agroman Laing O'Rourke JV)
-
Civil Engineering
-
1 - 100 Employee
-
SCL / TBM shift engineer
-
Jan 2018 - May 2019
Construction of two RC tunnel portals, baseslab, standwalls, SCL launch Adits through Josephg Gallagher Ltd, and 2km drive towards west by Ø9m TBM (Epb) of NFM. Type of material: Clay, shells bed and sands.Functions: Setting out and execution control of RC structures, ITP and safety compliance + tunelling activities
-
-
SCL / TBM shift engineer / Surveyor
-
Nov 2016 - Dec 2017
Construction of two SCL launch adits at Battersea through Joseph Gallagher Ltd and 3.2 km twin tunnels by Ø6m TBM (epb) of NFM from Battersea to Kennington. Type of material: London clay.SCL - Profile control, early age tests, reporting, ensure ITP and safety compliance, checksheets.TBM - Supervise activities, monitor parameters during excavations, election of type of ring and position reporting, hyperbaric interventions, PPS guidance system and survey activities
-
-
-
Murphy Geospatial
-
United Kingdom
-
Construction
-
200 - 300 Employee
-
Surveyor
-
Mar 2015 - Mar 2016
Building projects: Topo surveys, installation of controls, setting out and execution control.Other topo, utility and hydrographic surveys.3d scan of some buildings: Old war office, St Bartholomew´s hospital.
-
-
SCL shift engineer
-
Aug 2014 - Mar 2015
Project: Crossrail, New Bond Street Station.SCL works package to construct some platform tunnels, cross passages and escalators on its different stages: Excavation, primary, waterproofing, secondary, fireproofing.Functions: Profile control, early age tests, reporting, ensure ITP and safety compliance
-
-
-
FCC
-
Spain
-
Environmental Services
-
700 & Above Employee
-
Surveyor
-
Jul 2009 - Jun 2012
The project consisted of 14 km of tunnels, 12km by Ø10m double shield rock Herrenknecht TBM and 2 km by NATM and blast and drill.Type of material: Sandstones, planters, anhydrites, schists, quartzites.Functions: Setting out, geometric control and execution control of all differents activities carried out on site.INITIAL: Earthworks, Piling, Capping beams, RC elements, tunnel portals, shove frames, monitoring of unstable structures/landslidesTBM: VMT guidance system, set of angles, precisse leveling, move ups, update coordinates, wriggle surveys and convergence readings.NATM: Blasting/drilling, Excavations, steel arches, primary linning, drainage system, secondary lining, cross passages, cut and cover Show less
-
-
Surveyor
-
Dec 2007 - Jul 2009
Define Layaouts, prepare survey data, setting out and execution control.Update drawings and project related documentation including the modifications proposed during the project.Control of quantities of execited works. Earthworks volume calculations
-
-
-
Ferrovial Construction
-
United States
-
Construction
-
700 & Above Employee
-
Surveyor (Practical training period)
-
Mar 2007 - Jun 2007
The project consisted of 6km highway with important earthworks, rc structures and singular elements. The most significant, the 1100 m length Nalón viaduct, constructed by the incremental launching method. Functions: Take part as surveyor/setting out engineer in the remaining works before putting the project in service: Earthworks, road surfaces, road marks, signalling. At viaduct, monitoring during the pushing process of its central box and other complementary works, load tests of all viaducts. Show less
-
-
-
El Corte Inglés
-
Spain
-
Retail
-
700 & Above Employee
-
Employee
-
Dec 2004 - Dec 2006
Reinforcement during production peaks at Christmas and replacement of staff during summer holidays. Commodity reception, warehouse maintenance, replenishment at shop. Customer issues assistance. Reinforcement during production peaks at Christmas and replacement of staff during summer holidays. Commodity reception, warehouse maintenance, replenishment at shop. Customer issues assistance.
-
-
Education
-
IES Fernández Vallín, Gijón, Spain
CFGS SENIOR TECHNICIAN IN CIVIL ENGINEERING PROJECTS AND SURVEYING (RQF = HNC) -
ITC, Instituto tecnológico del canábrico. Spain
CONTROL OF PROJECTS AND CONSTRUCTION SITES