Daniel Parcel
Maintenance Technician at Springs Fabrication, LLC- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Springs Fabrication, LLC
-
United States
-
Oil and Gas
-
1 - 100 Employee
-
Maintenance Technician
-
Jul 2019 - Present
-
-
-
Qualtek MFG
-
Colorado Springs CO
-
Maintenance Tech I
-
Sep 2015 - Nov 2018
Preventive Maintenance, Machine Installation and Repair ,Welding and Fabrication. Preventive Maintenance, Machine Installation and Repair ,Welding and Fabrication.
-
-
-
Springs Fabrication, Inc. through Resource MFG. Staffing
-
Colorado Springs, Colorado Area
-
Production Machinist
-
May 2015 - Jul 2015
Operating manual lathe-mill andCNC lathe.July 06 2015 Springs Fab lays off all Temps. Operating manual lathe-mill andCNC lathe.July 06 2015 Springs Fab lays off all Temps.
-
-
-
-
Production Machinist
-
May 2015 - Jul 2015
Operating manual lathe, mill and CNC lathe. Springs Fab lays-off all Temps July 6 2015. Operating manual lathe, mill and CNC lathe. Springs Fab lays-off all Temps July 6 2015.
-
-
-
-
Sub-Assembly Tech
-
Jun 2014 - Oct 2014
Accesing, rebuilding sub-assemblies for Line Maintenance scheduled maintenance.GT Technologies, our largest Customer files bankruptcy, DiamondWire lays off 105 employees.
-
-
Saw Tech
-
Dec 2013 - Jun 2014
Interpreting Shop drawings, locating parts/assemblies, assembling and aligning Saws capable of cutting and wafering Silicon and Synthetic Sapphire.Working through Elwood Staffing until Mar. 2014, I was made full time employee by DiamondWireMaterials Mar. 30 2014.
-
-
-
WestRail, Inc through Elwood Staffing
-
4949 Geiger St.
-
Assembler,welder/fabricator 8 mos.-Machine operator 4 mos.
-
Sep 2012 - Oct 2013
Assembling, fabricating parts for and welding on Coil Covers for Rail cars. Jan. 2013 we "over exceeded expectations" producing 5 Coil covers in a 10 hour shift, we were told to meet shipping schedules 4 covers were required. Contract for 450 Coil covers completed April 2013- temporary assignment ends may 2013. As a Machine operator, I ran the band saw, laid-out-punched/drilled holes in rail car components.Cut Aluminum/steel with Plasma arc and operated Gantry crane and forklift. Contract completed Oct. 2013
-
-
-
Qualtek Manufacturing
-
3200 N. Nevada
-
Maintenance Tech II
-
Jan 2012 - Aug 2012
Performing Preventative maintenance work, upgrading equipment, mechanical repairs and using Multi-Meter for troubleshooting and making electrical repairs. Changing filters belts and fuses on HVAC equipment. Temporary assignment ended Aug. 2012. Performing Preventative maintenance work, upgrading equipment, mechanical repairs and using Multi-Meter for troubleshooting and making electrical repairs. Changing filters belts and fuses on HVAC equipment. Temporary assignment ended Aug. 2012.
-
-
-
International Truck and Engine Corporation
-
Executive Offices
-
1 - 100 Employee
-
Millwright
-
Jan 1998 - Sep 2007
Production support, troubleshooting equipment, machine repair/installation, welding/fabrication, pipefitting and Preventive Maintanance work. Production support, troubleshooting equipment, machine repair/installation, welding/fabrication, pipefitting and Preventive Maintanance work.
-
-
Education
-
Ivy Tech Community College
4 yr. Federally approved apprenticeship- received Certificate from Dept. of Labor upon completion., Industrial maintenance technician program -
Thomas Carr Howe H.S.