Daniel Morrell

Interim Team Leader Civil at JJ Ryan Consulting
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Brisbane Area, AU

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Brett M.

I had the pleasure of training Daniel in his early days whilst I was employed with Stoddarts and was impressed at his willingness and desire to learn new things and the speed at which he picked up the Vertex BD detailing software. As time went on Daniel worked along side me working on projects together for some major clients and projects. His ability to manage his time and successfully complete the tasks set him stood him in good stead for his future position as the Detailing manager. In my position as Area Manager for Vertex CAD/PDM systems I continue to have a working relationship with Daniel. His knowledge and understanding of the Vertex software and how it is applied to the design and manufacturing processes is one of his many strengths. I would have no hesitation in reengaging Daniels services should the need ever arise.

LinkedIn User

I believe Daniel is a natural leader. He is a team player who engages in collaboration and creative thinking when problem solving and is always customer focused. His hard skills are developed through experience and willingness to be taught. His soft skills are reliable, consistent and empathetic. His team engage through his leadership as he always supports them and values their opinion. That's all the evidence you need when looking for a leader.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Australia
    • Civil Engineering
    • 1 - 100 Employee
    • Interim Team Leader Civil
      • Nov 2022 - Present

    • Interim Team Leader Structures
      • Aug 2022 - Nov 2022

      Acting as the Interim Team Leader Structures - Leading the Infrastructure, Assets, Building and Drafting Teams

    • Detailing Manager
      • Jun 2019 - Aug 2022

      Some of my responsibilities are:• The last fourteen months of my tenure I managed, lead and developed, the Estimation, Engineering and Pre Production teams.•Leading and supporting the Detailing Team across mulitple locations to produce drawings and plans for manufacture and installation, while ensuring these meet the set quality, quantity and time targets.•Monitor each team members performance by using Framework reports to identify any issues and feedback to team\staff as required.•Ensure that the team respond to critical customer needs as required. •Lead, motivate and assist team member, while looking for continuous improvement of systems and processes.•Liasing with the key stackholders for ease of maufacture, installation and engineering• Ensuring weekly\monthly targets are met.• Design and Development or the Stoddart relocatable system.

    • Senior Detailer
      • May 2015 - Jul 2019

      Responsible for the development of detailed drawings for fabrication and installation of single storey, two storey, multi residential, relocatable and custom design homes. My responsibilities include:-Designing/Detailing of light gauge steel walls, floors and roof trusses for fabrication and installation.-Designing/Detailing of structural elements for simple to complex houses, such Box Beams, PFC's, UC's, UB's, Portal Frames etc. -Communication, meetings and liaison with clients and installers for progress on projects with multiple dwellings with varied deadlines for completion. This also includes being the main point of call to ensure that an issues are dealt with immediately and any changes to plans are rectified.Some projects I have been involved in: Halcyon - Bli Bli (QLD)Ingenia - Anna Bay (NSW)Condev - Cova Hope Island (QLD)Mars Building - Point Clare (NSW)DTL Construction - Villa Florentine (2018 QMBA House of the year) (QLD)

    • Design/Draftsman
      • Mar 2014 - May 2015

      Some of my responsibilities include:-Communication, meetings and liaison with clients, civil engineers, and contractors for progress on projects with varied deadlines set for completion of packages such as Design, Tender Overview, Preliminary’ to ‘As Built’ stages.- Daily, weekly planning and forecasting of work.- Point of call for external clients to ensure they are kept up to date with their project.- Developing standards writing, implementing and training. Some of my responsibilities include:-Communication, meetings and liaison with clients, civil engineers, and contractors for progress on projects with varied deadlines set for completion of packages such as Design, Tender Overview, Preliminary’ to ‘As Built’ stages.- Daily, weekly planning and forecasting of work.- Point of call for external clients to ensure they are kept up to date with their project.- Developing standards writing, implementing and training.

    • Senior Technician
      • Jan 2013 - Sep 2013

      Responsible for the development of detailed designs for ‘Preliminary’ to ‘As Built’ stages of the project. Rectory Road, Hawkwell - As the Lead Technician for this 175 plot development, I was responsible for the production of all, structural designs. Some of my responsibilities included:- Piling Layouts and Schedules - Foundation Layouts and Details - Reinforcement Layout- Bar Bending Schedules for 48 different dwelling types and retaining walls around the site Responsible for the development of detailed designs for ‘Preliminary’ to ‘As Built’ stages of the project. Rectory Road, Hawkwell - As the Lead Technician for this 175 plot development, I was responsible for the production of all, structural designs. Some of my responsibilities included:- Piling Layouts and Schedules - Foundation Layouts and Details - Reinforcement Layout- Bar Bending Schedules for 48 different dwelling types and retaining walls around the site

    • Netherlands
    • Civil Engineering
    • 700 & Above Employee
    • Senior Technician
      • Mar 2012 - Dec 2012

      Senior Technician working with in a team of 5 Technicians working on a wide range of Maritime projects (UK and International)Port of Duqm, Oman - As the Lead Technician for the works on the Tug Berth Finger pier, I was responsible for the production of over 100 designs for civil, structural and mechanical elements of the build in a very short period of time. Some of my other responsibilities included:- Communication, meetings and liaison with civil, mechanical and electrical engineers, for progress on the project with varied deadlines set for completion of packages such as general arrangements, sections, elevations etc.- Responsible for the production of both insitu and precast reinforced concrete designs.- Supervising design/drawing production and guaranteeing specific deadlines were met. - Daily, weekly planning and forecasting of works. Dead Sea Works, Israel – As the Lead Technician I was responsible for developing the concept packages that’s consisted of two schemes with various stages due to the reduction of water over the course of twenty years life cycle. Some of my other responsibilities included:- Creating specific concept designs from rough sketches for 100m link arms and combined access bridge. - Creating general arrangement designs with contour information and rotation of pontoon and bridge spans to meet a specific ground level.

    • Technician
      • Jul 2007 - Mar 2012

      My role saw me responsible for the development of ‘Preliminary’ to ‘As Built’ stages of the projects, the construction techniques used were steel frame construction, timber frame construction and reinforced concrete bar bending detailing and scheduling. My other responsibilities included survey projects undertaken by the company; I was in charge of the monitoring and interpretation of survey information taken on site which was then reviewed and developed into reports and actions.I worked on a various number of school projects for the company that involved the development of reinforced concrete foundations with bar bending schedules, first, second and roof structural requirements, connection details and drainage details.

Community

You need to have a working account to view this content. Click here to join now