Danche Popova

Engineering Manager at Aveillant Ltd
  • Claim this Profile
Contact Information
Location
UK
Languages
  • English Native or bilingual proficiency
  • Bulgarian Native or bilingual proficiency
  • Russian Full professional proficiency

Topline Score

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

You need to have a working account to view this content. Click here to join now
Martin Morgan

It’s with pleasure I recommend Danche Having worked with Danche in a supply chain capacity since 2013 Danche is a hard working, focused. conscientious individual who goes the extra mile and has vast systems knowledge. A first port of call for systems guidance and assistance to all colleagues.

Gavin Goates

I had the pleasure of working with Danche as a supplier for over 16 years which allowed me to see at first hand the knowledge, drive and commitment that Danche applies on behalf of her internal stakeholders and in support of her peers. Danche is a professional and efficient Manufacturing Systems and logistics specialist who delivers measurable results. It has been a pleasure working with her and I look forward to maintaining a future alliance.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • United Kingdom
    • Aviation and Aerospace Component Manufacturing
    • 1 - 100 Employee
    • Engineering Manager
      • Oct 2016 - Present

      Aveillant was created in 2011 to further develop and take to market ground-breaking Holographic Radar technology developed by Cambridge Consultants. Aveillant was created in 2011 to further develop and take to market ground-breaking Holographic Radar technology developed by Cambridge Consultants.

    • United Kingdom
    • Printing Services
    • 1 - 100 Employee
    • Business Systems and Logistics Manager
      • 2010 - Aug 2016

      • Autonomous role reporting to the Operations Director, responsible for Capex and Project purchasing across a range of disciplines within the industry. • Lead introduction & implementation of 20+ IT/system projects on time and within budget.• Increased Production stock turns from 3.32 to 6.03 • Introduced Worldwide consignment stock operation providing 24 hours "follow the sun" spares support.• Increased Customer Support stock turns from 1.81 to 2.56. • Increased on-time spares delivery to Customers from 67% to 98%. • Specified, selected and deployed Document Management System resulting in a number of paperless processes Show less

    • Systems Manager
      • 2004 - 2010

      Through implementing and maintaining business software systems, ensure priorities are set to effectively support business needs, continuously review team, process and system effectiveness to ensure future business requirements are understood and resourced. Manage three activity areas comprising NPI/MRP team, Systems Development team and Logistics Department. Maintain accuracy and modifications to the ERP system as well as define, specify and implement additional “add-on” systems including Timesheet database, SOL, Production KPIs, Engineering Visit Reporting, Project reports, Invoice register, QlikView.Introduced:o Use of QlikView as management reporting tool o ForeastPRO as a forecasting tool, improving spares availability from 76% to 97%.o Ledgersoft software for raising and approving Capex and General Ledger type of Purchase Orders, introducing electronic approval signatures, replacing manual paper process. . Show less

    • Manufacturing Projects Manager
      • 2000 - 2004

      Leading and managing the implementation of ERP system, specifying and implementing Engineering, Purchasing and Stocking policies, modifying the ERP system parameters and different modules to accommodate changing Production demands as well as demanding New Product Introduction, responsible for implementing all Engineering Change Notes and BOMs. NPI group manager.Introduced: - Infor Fourth Shift ERP system. - ECN process and electronic tracking of providing visibility across the business. Show less

    • Consumer Services
    • Mechanical Design and Project Leader
      • 1999 - 2000

      Drive and introduction of new bespoke solenoid and wound coils products from enquiry to full production for automotive, medical and domestic appliances industries (major customers - Avon Automotive, Dyson Appliances, Huntleigh Healthcare, Mira Showers, Mars Electronics, TRW automotive) • Implementation of QS9000. • Successful re-structure of a production line using lean manufacturing techniques. • Introduced a process resulting in resolving customer complaints within 72h. Drive and introduction of new bespoke solenoid and wound coils products from enquiry to full production for automotive, medical and domestic appliances industries (major customers - Avon Automotive, Dyson Appliances, Huntleigh Healthcare, Mira Showers, Mars Electronics, TRW automotive) • Implementation of QS9000. • Successful re-structure of a production line using lean manufacturing techniques. • Introduced a process resulting in resolving customer complaints within 72h.

    • United States
    • Motor Vehicle Manufacturing
    • 200 - 300 Employee
    • Project Manager
      • 1998 - 1999

      Responsible for Volvo, Nedcar, Mitsubishi, Leyland Trucks, Saab automatic and manual transmission and handbrake cables (new products and existing production) • Achieved 100% delivery within defined Customer timeslots, up from 66%. • Balanced production timelines and eliminated bottleneck and pinch points, creating flow. • Introduction and implemented a new ERP system. • Designed and re-designed FMEA to meet customer expectations Responsible for Volvo, Nedcar, Mitsubishi, Leyland Trucks, Saab automatic and manual transmission and handbrake cables (new products and existing production) • Achieved 100% delivery within defined Customer timeslots, up from 66%. • Balanced production timelines and eliminated bottleneck and pinch points, creating flow. • Introduction and implemented a new ERP system. • Designed and re-designed FMEA to meet customer expectations

    • United States
    • Aviation and Aerospace Component Manufacturing
    • 1 - 100 Employee
    • Applications Engineer
      • 1996 - 1998

      United Flexible (part of Senior Flexonics Group) specialises in specially-designed and manufacture of high-performance flexible metal and corrugated hose for the transfer of fluids and gases in demanding environments• Lead ‘Quick Changeover’ team and won significant external project investment for its ongoing development and refinement.• Successful Introduction of MRP II system.• Introduced a number of Custom products from prototype to full production.

    • Design Engineer
      • 1995 - 1996

      • Design and full specification of new product components and assemblies• Design of bespoke flexible hose assemblies as per customer’s requirements and applications,• Drawings approval

    • United Kingdom
    • Education Administration Programs
    • 500 - 600 Employee
    • Lecturer
      • 1995 - 1998

      Lecturer in Mathematics, Graphical Communication and CAD Systems. Lecturer in Mathematics, Graphical Communication and CAD Systems.

    • Research Engineer
      • 1988 - 1991

      • Granted a Patent Certificate by the Bulgarian Copyright Institute for my Diploma Thesis “Automatic device for EDM machines” • Granted a Patent Certificate by the Bulgarian Copyright Institute for my Diploma Thesis “Automatic device for EDM machines”

Education

  • Technical University of Sofia
    MSc, Mechanical Engineering
    1982 - 1988
  • School of Mathematics Sofia
    Mathematics, Distinction
    1977 - 1982

Community

You need to have a working account to view this content. Click here to join now