Daan Tjeenk Willink

Project Controller at CARE Nederland
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Voorburg, South Holland, Netherlands, NL
Languages
  • Dutch Native or bilingual proficiency
  • English Native or bilingual proficiency
  • German Limited working proficiency
  • Spanish Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Netherlands
    • Non-profit Organizations
    • 1 - 100 Employee
    • Project Controller
      • Nov 2021 - Present

    • Netherlands
    • Shipbuilding
    • 200 - 300 Employee
    • Project Manager Engineering
      • Jul 2019 - Oct 2021

    • United States
    • Construction
    • 700 & Above Employee
    • Regional Manager EAME Advanced Work Packaging
      • Aug 2018 - Jun 2019

    • Advanced Work Packaging Manager
      • Feb 2018 - Aug 2018

    • Lead Planner
      • Sep 2017 - Jan 2018

      Lead Planner project proposal infrastructure

    • Project Controls Manager
      • May 2017 - Sep 2017

      Project Controls Manager at HES international Tank Terminal

    • United States
    • Construction
    • 700 & Above Employee
    • Project Controls Manager
      • Mar 2014 - Jan 2017

      EPC Package 2 for the Mina Abdulla Refinery, consisting of Hydrogen Plant (Reformer), Utilities & Offsites, Vacuum unit, Building (SS/MMs, CCR, Lab, Technical Building) Waste Water Treatment, boilers, demi water plant, Gas plant, ICSS system, flare(s) sulphur unit, amine unit, SWS unit, hydrocracker unit, tank farm, crude unit, KHT, and more.Responsible for the Engineering and Procurement Planning of the ICSS and EICS scope

    • Project Controls Planning Engineer
      • Apr 2013 - Feb 2014

      The conversion of an empty gas reservoir into a gas storage facility involves modification of an existing well site to accommodate 14 new wells in addition to the 6 existing wells. Fluor scope also involves construction of a new gas treatment plant with injection and treatment facilities. The injection facilities comprise six 10 MW centrifugal compressors; the treatment facilities comprise two dew point correction units (silica gel). The well site and gas plant are connected by two 30" pipelines. The project includes tie-ins to an existing peak gas installation and the national gas transmission grid. Fluor is providing EPCM services for the well site, gas treatment plant, and peak gas installation tie-ins.Responsible for Progress and Planning Control Show less

    • Project Controls
      • Jan 2012 - Apr 2013

      Project management services for SAMCo, SAPCo and SAAC are being provided for construction of a complex that includes a 145 kta acrylic acid plant, utilities and offsites, export/import port facilities, a 330 kta butanol/synthesis gas plant, and an 80 kta super absorber polymer plant. Responsible for Project Controls

    • Project Controls Cost Specialist
      • Jan 2011 - Dec 2011

      Project management consultant services for a 214,000 bbls/sd oil refinery to be located in PETKIM facilities. The refinery was to provide diesel and kerosene fuels for domestic consumption and LPG, light naphtha, and mixed xylenes to PETKIM. The refinery had a deep bottom-of-the-barrel conversion, with no fuel oil production.Responsible for the Internal Cost Control.

    • Netherlands
    • Transportation, Logistics, Supply Chain and Storage
    • 700 & Above Employee
    • Internship
      • Mar 2009 - Oct 2009

      Job Description: I did a research project about the Foreign Exchange Hedging Strategy at the department of Control International Mail. Job Description: I did a research project about the Foreign Exchange Hedging Strategy at the department of Control International Mail.

    • Uganda
    • Higher Education
    • 700 & Above Employee
    • Teacher
      • Jul 2008 - Aug 2008

      Job Description: I gave lectures to around 60 students and helped them writing a business plan for SMEs. I stayed for 2 month in East-Africa and visited Uganda, Kenya, Rwanda and Tanzania. Job Description: I gave lectures to around 60 students and helped them writing a business plan for SMEs. I stayed for 2 month in East-Africa and visited Uganda, Kenya, Rwanda and Tanzania.

    • Administrative Worker
      • May 2003 - Jul 2003

      Job Description: I worked in a company operating in the meat industry. My job was to (re)organize all the administration over the past two years and to collect money from the company Job Description: I worked in a company operating in the meat industry. My job was to (re)organize all the administration over the past two years and to collect money from the company

Education

  • Rijksuniversiteit Groningen
    Master's degree, International Business Management and International Financial Management
    2008 - 2010
  • Uppsala universitet
    Master's degree, International Business Management and International Financial Management
    2009 - 2010
  • Rijksuniversiteit Groningen
    Bachelor's Degree, Business Administration
    2003 - 2007

Community

You need to have a working account to view this content. Click here to join now