Cyrille Protière

Civil ingineer at SETEC TPI
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Lyon Area, FR

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • France
    • Civil Engineering
    • 200 - 300 Employee
    • Civil ingineer
      • Aug 2008 - Present

      DET - AOR Elargissement A75 (APRR) PRO - DCE - de la reconstruction du Pont Neuf à Annemasse (74 - Annemasse Agglo) AVP - PRO - DCE de la suppression du PN27 à Brignoud (38 - CG38/SNCF) AMO RN88 : Contrôle extérieur des études d’ouvrages d’art (Région Auvergne Rhône-Alpes) PRO - DCE - DET du raccordement routier du 2nd tube du tunnel du Fréjus (73 - SFTRF) AVP - PRO - DCE de l'écopont de Viry (74 - ATMB) DDP du diffuseur de Quincieux (69 - APRR) AVP - PRO - DCE des ouvrages courants de l'aménagement de la RN1019 au niveau de l'A36 (APRR), AVP - PRO - DCE des ouvrages courants de la liaison A89/A6 (APRR), AMO sur la conception et construction d'une station de conversion sur la liaison France/Italie (RTE), DCE et suivi de chantier du Pont Raymond Barre à Lyon (69 - SYTRAL), EP - AVP de la rénovation du Slipway de Chalon-sur-Saône (71 - VNF), EPOA - APOA - PRO - DCE viaduc d'Arbouans (pont mixte) et requalification du viaduc existant sur l'A36 (APRR), Etudes de faisabilité et projet de référence sur la liaison France/Italie du réseau RTE le long de l'A43 (franchissement des viaducs, tunnels et OAC), PRO de la rénovation lourde du tunnel de la Croix Rousse à Lyon (69 - Grand Lyon), AVP - PRO des OAC pour l'élargissement à 2x3 voies de l'A36 (APRR), Show less

    • Civil Ingineer (Internship)
      • Apr 2008 - Jul 2008

      Study of concrete box bridges built before 1975 Study of concrete box bridges built before 1975

    • Rail Transportation
    • 700 & Above Employee
    • Civil ingineer (Internship)
      • Mar 2007 - Aug 2007

      Civil Engineer (Internship) Bowstring bridges Design (120 meter long) for the CFL « Chemin de Fer Luxembourgeois » Civil Engineer (Internship) Bowstring bridges Design (120 meter long) for the CFL « Chemin de Fer Luxembourgeois »

    • Canada
    • Higher Education
    • 700 & Above Employee
    • Research Internship
      • May 2006 - Jul 2006

      Alkali reaction, concrete traction creep, concrete shrinkage Alkali reaction, concrete traction creep, concrete shrinkage

    • Foreman Internship
      • Jun 2005 - Aug 2005

      Equipment room construction and noise wall placing on the Tramway LEA construction site Equipment room construction and noise wall placing on the Tramway LEA construction site

    • Price study Internship
      • Feb 2005 - Apr 2005

      Prince study on Tramway LEA of Lyon Prince study on Tramway LEA of Lyon

Education

  • Ecole nationale des Travaux publics de l'Etat
    2006 - 2008
  • Université Laval
    Civil Engineering
    2005 - 2006

Community

You need to have a working account to view this content. Click here to join now