CUONG NGUYEN DUC
Shift Leader of Wind power plant at Công ty CP Tập đoàn Thái Bình Dương - PACIFIC CORPORATION- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Credentials
-
Shift Leader of Solar Power Plant Vietnam - EVN SRLDC A2
EVN NLDC South Region Load Dispatch Center, Vietnam A2Nov, 2019- Sep, 2024 -
Shift Leader of Wind power plant - EVN NLDC A0
EVN NLDC A0 - Nation Load Dispatch CenterApr, 2021- Sep, 2024 -
Shift Leader of 110KV Substation - EVN NRLDC A1
EVN NLDC North Region Load Dispatch Center A1Jan, 2019- Sep, 2024
Experience
-
Công ty CP Tập đoàn Thái Bình Dương - PACIFIC CORPORATION
-
Vietnam
-
Real Estate
-
1 - 100 Employee
-
Shift Leader of Wind power plant
-
Mar 2021 - Present
220kV Thai Hoa Wind Power Plant 90MW 220kV Thai Hoa Wind Power Plant 90MW
-
-
-
TTC Group
-
Czechia
-
Investment Management
-
1 - 100 Employee
-
Shift Leader of Solar power plant
-
Dec 2020 - Feb 2021
Shift Leader at 110kV TTC Duc Hue 1 Solar Power Plant 49MWp Shift Leader at 110kV TTC Duc Hue 1 Solar Power Plant 49MWp
-
-
-
Colas Rail - Asia
-
Construction
-
100 - 200 Employee
-
Electrical Operator - Hanoi Metro Line 3 - at Joint Venture Alstom - Colas - Thales
-
Jul 2020 - Dec 2020
Electrical Operator - Hanoi Metro Line 3 - at Joint Venture: Alstom - Colas Rail - Thales Electrical Operator - Hanoi Metro Line 3 - at Joint Venture: Alstom - Colas Rail - Thales
-
-
-
Sungrow Power Supply Co., Ltd.
-
China
-
Renewable Energy Semiconductor Manufacturing
-
700 & Above Employee
-
Shift Leader of Solar Power Plant
-
May 2019 - Jul 2020
Shift Leader of Solar Power Plant 30MWp in South Vietnam Shift Leader of Solar Power Plant 30MWp in South Vietnam
-
-
-
-
Shift Leader of 110kV Substation
-
Jan 2019 - May 2019
Shift Leader of 110kV Substation in Hai Phong province, Vietnam Shift Leader of 110kV Substation in Hai Phong province, Vietnam
-
-
-
-
Electrical Engineer
-
Feb 2019 - Mar 2019
-
-
-
GELEXIMCO GROUP
-
Vietnam
-
Real Estate
-
1 - 100 Employee
-
Control Room Operator of Thermal power plant
-
Mar 2017 - Nov 2018
Control Room Operator: Electrical System of Thang Long Thermal Power Plant 2x300MW & the 500kV Substation Control Room Operator: Electrical System of Thang Long Thermal Power Plant 2x300MW & the 500kV Substation
-
-
-
Wuhan Kaidi Electric Power Co., Ltd
-
China
-
Appliances, Electrical, and Electronics Manufacturing
-
1 - 100 Employee
-
Hydrogen Production Line 'sDistributed Control System Operator
-
Jan 2018 - Aug 2018
Hydrogen Production Line 's Distributed Control System Operator in Thermal Power Plant 2x300MW Hydrogen Production Line 's Distributed Control System Operator in Thermal Power Plant 2x300MW
-
-
-
-
Electrical Engineer
-
Apr 2017 - Jun 2017
-
-
Education
-
Electric Power University, Vietnam
Bachelor's degree, Electrical System Engineering -
EVN NLDC A1 - North Region Load Dispatch Center Vietnam
Certificate, Load Dispatch, Electrical System Operation -
EVN NLDC A2-South Region Load Dispatch Center, Vietnam
Certification, Power Plants -
EVN NLDC A0 - Nation Load Dispatch Center Vietnam
Shift Leader of Wind power plant, Shift Leader