Sarath Chandran S

Manager at BEAVER INFRA CONSULTANTS PRIVATE LIMITED
  • Claim this Profile
Contact Information
Location
New Delhi, Delhi, India, IN
Languages
  • English Professional working proficiency
  • Hindi Native or bilingual proficiency
  • Malayalam Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • India
    • Civil Engineering
    • 1 - 100 Employee
    • Manager
      • Apr 2023 - Present

    • Assistant Manager
      • Apr 2021 - Jun 2023

    • Tunnel Engineer
      • Jan 2017 - Aug 2021

      1. Detailed design of single line BG tunnels (4 Nos. approximate length 3960 m) including cut and cover between proposed stations Sukhovi and Molvom in connection with construction of new line between DMV and Kohima for NF RAILWAY.2. Detail design of single line BG tunnel No.1 to 4 (approx. Length 1000m) between Gauripur to Abhayapuri in connection with construction of new line between NMX-JPZ for NF RAILWAY.3. Detailed design of 10 no of Tunnels (from tunnel no. 06 to 15) in connection with the construction of new BG railway line project from Bairabi to Sairang in the state of Mizoram for NF RAILWAY.4. Detailed design of 10 no of Tunnels (from tunnel no. 16 to 23) with total length of 2.970km in connection of 2.97 Km in connection with the construction or new BG Railway line project from Bairabi to Sairang in the state of Mizoram for NF RAILWAY.5. Detailed design of 1No. of Tunnel & Cut and Cover by ADECO-RS method from Ch: Km 83/378.00 to Ch: Km 84/128.00 total length of 750 Mtr. (Approx.) in connection with the construction of New BG Railway line from Agartala to Sabroom for NF Railway. 6.Detailed design of Tunnel no.4 for proposed new BG line between Aklera to Nayagaon in the state of Rajasthan as part of Ramganj mandi-Bhopal new BG Rail line project for ABCI Infrastructure Pvt. Ltd.7. Pre-bid tender design for Construction of 2 lane bidirectional Silkyara bend - Barkot tunnel for MAX Infra (I) Ltd.8. Pre-bid tender design for Construction of Two Tunnel (Two tubes of 4 lane each) in km 1/040 to km 2/790 (1.75km) and km 3/440 to 12/360 (8.92km) for missing link under Capacity Augmentation for Mumbai-Pune Expressway For NAVAYUGA Engineering Company Ltd. Show less

    • Civil Engineer
      • Sep 2012 - Dec 2016

      Working as civil engineer in Beaver infra one of the leading Company in India. I have good experience in design engineer duties and Responsibilities. Knows the relevant Codes, Based on my knowledge and skill, I can handle auto levels, I can easily maintain the documents and Records for the project.- Design high rise building using Stadd pro software- Preparing Detailed project report- Making of B.O.Q and finalizing- Checking whole drawings issue for site- To solve the problems in drawings and construction - Reporting to SR.CIVIL Engineer or CONSTRUCTION MANAGER- Study scope of works - Study all the Drawings and Explain Supervisor - Co-ordination and discuses site manager at all the time - Maintain the discussion points- Inspection and Monitoring of various civil construction / inspection activities of Overhead line inspection & Substation jobs.- Witness testing and site construction activities, equipment and material inspection.- Co-ordinate with project coordinator/construction manager for specific material approvals.- Verification of results of corrective & Preventive action Show less

Community

You need to have a working account to view this content. Click here to join now