Experience

    • Italy
    • Machinery Manufacturing
    • 100 - 200 Employee
    • Supervisore meccanico/Site manager
      • Jan 2021 - Present

      Follow the commissioning of the combustion system of the rotary hearth block reheating furnace and relevant handling system

    • Supervisore meccanico
      • Nov 2020 - Dec 2020

      Follow the installation of a new walking beam furnace

    • Supervisore meccanico
      • Sep 2020 - Nov 2020

      Prolongation of the walking beam furnace in order to increase the furnace’s capacity from the original 85 tons per hour to 130 tons per hour. Commissioning of the new handling and combustion system.

    • Italy
    • Machinery Manufacturing
    • 100 - 200 Employee
    • Supervisore meccanico
      • Mar 2020 - Mar 2020

      Installation and commissioning of the condor slag door on EAF

    • Site manager/Mechanical supervisor
      • Mar 2019 - Feb 2020

      Follow the installation of the WTP and the Heat Treatment Linefor pipes and the commissioning of the same; coordinate the activities to be done between erection company and client; coordinate the various activities tobe done by the SMS specialists team; prepare the erection andcommissioning schedules;prepare the check lists/ certificates of execution;draw the as built and solve the basic engineering problems and provide the faster solutions to customer

    • Supervisore meccanico
      • Sep 2018 - Mar 2019

      Follow the erection and commissioning of the Twin Ladle furnace and the Water Treatment Plant.

    • Site Manager/Mecanical supervisor
      • Aug 2018 - Sep 2018

      Opening the site; carry out the OPI; logistical management ;Make the mechanical supervision during the pre- assembly and installation of the ladle car with all the on-bard system. Perform the cold/hot test of the ladle car.

    • Site Manager
      • May 2018 - Aug 2018

      Site openining; carry out the OPI; logistical management; mechanical/piping ( water and hydraulic) and refractory supervision during the installation of the new walking beam reheating furnace; attend management and coordination meetings with the Customer and the erection company; preparation of the nonconformity reports, weekly reports; planning and scheduling of the activities on site.

    • Supervisore meccanico
      • Mar 2018 - May 2018

      Complete the commissioning of the water treatment plant; improving the existing sequences.

    • Supervisore meccanico/Deputy Site Manager
      • Apr 2017 - Mar 2018

      Installation of the Tempering /Austenitizing furnaces and quenching tank which are part of the heat treatment plant for tubes and as well installation of the water treatment plant. Commissioning of the WTP and the heat treatment line. Attend management and coordination meetings with the Customer; Preparation of the nonconformity reports, weekly reports; Planning and scheduling of the activities on site.

    • Supervisore meccanico
      • Jan 2017 - Mar 2017

      Coordination of the mechanical activities in a context of a turn key plant. Installation of the Tempering /Austenitizing furnaces and material handling machines which are part of the heat treatment plant for tubes

    • Supervisore meccanico
      • Apr 2016 - Dec 2016

      Erection of the Bar line and Pouring Reel Line.Commissioning of the wire, Bar Line and Pouring Reel line.

  • Nuova SI.E.CO
    • Ain Sukhna , Egypt
    • Supervisore meccanico
      • Nov 2014 - Oct 2015

      Installation and start- up of the raw material handling system and the wet scrubbers system which are part of the DRP ( Direct Reduction Plant) Installation and start- up of the raw material handling system and the wet scrubbers system which are part of the DRP ( Direct Reduction Plant)

    • Italy
    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • Supervisore meccanico
      • Sep 2014 - Oct 2014

      Maintenance of the new energy generating plant that recovers fume heat from the furnace ( ORC, Organic Rankine Cycle )

    • Supervisore meccanico
      • Aug 2014 - Sep 2014

      Commissioning of the UBC line (Aluminum shredder)

    • Italy
    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • Supervisore meccanico
      • Feb 2014 - May 2014

      Follow the installation of a new B.O.F ( Basic Oxygen Furnace ) converter

    • Supervisore meccanico
      • Aug 2013 - Jan 2014

      Follow the erection and commissioning of the continuous casting machine (CCM)

    • Italy
    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • Supervisore meccanico
      • Nov 2011 - Jun 2013

      Follow the erection of the continuous casting machine and make the commissioning of the rough material handling (RMH) Follow the erection of the continuous casting machine and make the commissioning of the rough material handling (RMH)