Craig Smith

Principle Engineer at Integrity Engineering Solutions
  • Claim this Profile
Contact Information
Location
AU

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Australia
    • Oil, Gas, and Mining
    • 1 - 100 Employee
    • Principle Engineer
      • Feb 2023 - Present

      Providing technical, and risk based, support for operating companies for 'fitness for service' and other technical assessments for static equipment. Providing technical, and risk based, support for operating companies for 'fitness for service' and other technical assessments for static equipment.

    • Australia
    • Engineering Services
    • 200 - 300 Employee
    • Consulting Specialist
      • Nov 2022 - Feb 2023

      Enjoying a break while supporting Verbrec Asset Management/Integrity when needed.

    • Lead Asset integrity
      • May 2022 - Nov 2022

      Asset Integrity Team Lead for Verbrec (previously LogiCamms) providing Integrity Engineering Services and operational support for various industrial facilities and projects in Australia, New Zealand and PNG.- Integrity Team leadership and technical support- Client focal point- Operations support (Turnarounds, failures, improvements)- Integrity engineering services (FFS, RBI, IOW, Inspection plans)- Asset Management services (RAM Studies, Reliability and CMMS build)- Business development

    • E-Learning Providers
    • 1 - 100 Employee
    • Lead Asset Integrity Engineer - Coral FLNG
      • Mar 2019 - May 2022

      Coral FLNG is an exciting project in the LNG industry, and I am pleased have the opportunity to add my experience to the delivery and operation of such a world class development.As a member of the Operations Technical Services Team, I am responsible for the Asset Integrity of the Coral FLNG facility (Hull, Tanks and Topside static equipment). This role will follow the project delivery, operational readiness and continue in the operation phase.Key responsibilities:- Ensure the safe condition of the operating equipment.- Lead the Asset Integrity Team.- RBI Inspection Program.- Inspection contract management.- Execution of In-service and Turnaround Inspections.

    • Lead Integrity Engineer (FLNG)
      • Mar 2019 - May 2022

    • Oil and Gas
    • 1 - 100 Employee
    • Lead Mechanical Engineer
      • Dec 2015 - May 2022

      Operations Static Enginering - RBI - LNG Tanks - Valve Management/Reliability - Structures - Brownfield projects Operations Static Enginering - RBI - LNG Tanks - Valve Management/Reliability - Structures - Brownfield projects

    • Lead Mechanical Engineer
      • May 2015 - May 2022

      Project Delivery Lead Engineer for the QCLNG Project.Train 1 - Commissioning and handover from Bechtel (TCCC)Train 2 - Construction, commissioning and handover from Bechtel (TCCC)The QCLNG project is internationally recognized project with record breaking timeframes for delivery of LNG from first gas and also the most number of cargos following commissioning. The business plan of 73 cargos was exceeded by 10 cargos. No significant safety or reliability incidents occurred during commissioning or operation.The success of the project is contributed to the intimate collaboration between QGC/BG and Bechtel. I will always be proud to have been in the front line, delivering this demanding yet sussessful project.

    • Lead Mechanical Engineer
      • Jan 2014 - May 2022

      Risk Based InspectionReliabilityProduction ExcellencePeople Development/Mentoring

    • Australia
    • Farming
    • 100 - 200 Employee
    • Acting Reliability Manager
      • May 2013 - Dec 2013

      Managing the specialty engineer roles, reliability team, maintenance planning team, DCS and E/I maintenance teams for a integrated fertiliser facility (Hydrogen/NH3, Phosphoric Acid, Sulphuric Acid, Beneficiation and Granulation Plants).Part of the Site Executive Team, including Senior Site Executive Duties when rostered.

    • Senior Asset Risk & Reliability Engineer
      • Jul 2010 - Dec 2013

      Integrated Five Plant Fertiliser Complex- Accountable for maintaining and executing actions for the Multi-disciplinary Reliability Risk Register.- 2IC to Site Reliability Manager.- Accountable for all Site Pressure Equipment-Accountable for Sulphuric Acid Transport Fleet (including Budget)

    • 1 - 100 Employee
    • Turnaround Superintendent
      • Aug 2008 - Nov 2009

    • Asset Integrity Engineer
      • Jul 2005 - Jul 2008

      - RBI Program- Pressure Equipment Inspection- Site Risk Register- Welding Management

    • Integrity Engineer
      • Jun 2002 - Nov 2004

      Major shutdown inspection roles (WMC - Phosphate Hill/Mt Isa, Kwinana Nickel Refinery) Maintenance and inspection planning (QNI) Major shutdown inspection roles (WMC - Phosphate Hill/Mt Isa, Kwinana Nickel Refinery) Maintenance and inspection planning (QNI)

    • Russian Federation
    • Construction
    • 1 - 100 Employee
    • Design Engineer
      • Mar 1996 - Jun 2002

      Pressure equipment design and fabrication (1995-2000) Pressure equipment integrity and major shutdown execution (2000-2002) Pressure equipment design and fabrication (1995-2000) Pressure equipment integrity and major shutdown execution (2000-2002)

Education

  • James Cook University
    Bachelor's degree, Mechanical Engineering
    1992 - 1996
  • James Cook University
    Bachelor's degree, Mechanical Engineering
    1991 - 1995

Community

You need to have a working account to view this content. Click here to join now