Craig Sargeant
Principal Consultant / Sales at mCloud Technologies Corp- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
mCloud Technologies Corp
-
Canada
-
Technology, Information and Internet
-
1 - 100 Employee
-
Principal Consultant / Sales
-
Oct 2020 - Present
-
-
-
kanepi (acquired by mCloud Technologies Corp)
-
Australia
-
IT Services and IT Consulting
-
1 - 100 Employee
-
Principal Consultant
-
Oct 2015 - Oct 2020
Principal Consultant for kanepi Services responsible for management and delivery of projects to clients within the delegated time / cost schedule.
-
-
Senior Consultant
-
Dec 2014 - Oct 2015
kanepi software is specifically aimed at operating assets and fits in the ‘space’ between operating assets and the enterprise.
-
-
-
Woodside Energy
-
Australia
-
Oil and Gas
-
700 & Above Employee
-
ICE Team Leader / Commissioning & Start-Up Team Lead / Handover & Aceptance
-
Apr 2012 - Dec 2014
Team Lead for Commissioning / Start up activities in the Production Readiness Group looking after Operational interests in the GWF-1 Subsea tie-back project. Also performed the lead duties for all Instrument / Electrical / Controls interfacing with engineering vendors. Moved into Team lead role for Handover activities co-ordinating the handover of all equipment with the relevant data required for Operations to utilise the equipment on their asset as the project neared completion / handover.
-
-
Commissioning Team Lead - Project Group
-
Jan 2007 - Apr 2012
Team Lead for onshore and offshore projects leading a team of engineers to carry out all aspects of commissioning, start up and handover of Production group projects for operating assets.
-
-
Commissioning Engineer
-
Mar 2006 - Dec 2006
Instrument / Electrical Commissioning engineer on Goodwyn A Low Pressure Train project. Responsible for looking after the Inst / Elec commissioning on various packages for the LPT project. Develop workpacks for commissioning, review Implementation workpacks from EPCM contractor and deliver work as per schedule and budget.
-
-
-
Apache Energy
-
United States
-
Oil and Gas
-
1 - 100 Employee
-
Control System Specialist
-
Dec 2004 - Jan 2006
Control system specialist for Apache Joint Venture in Western Desert looking after three gas plants and various satellite stations. Performed Honeywell TDC modifications for new and modified equipment. Oversaw control system software upgrade to update Honeywell systems. Increase National (Egyptian) workforce control system knowledge and provide guidance to National team on control / instrumentation problem solving. Control system specialist for Apache Joint Venture in Western Desert looking after three gas plants and various satellite stations. Performed Honeywell TDC modifications for new and modified equipment. Oversaw control system software upgrade to update Honeywell systems. Increase National (Egyptian) workforce control system knowledge and provide guidance to National team on control / instrumentation problem solving.
-
-
-
Woodside Energy
-
Australia
-
Oil and Gas
-
700 & Above Employee
-
Operations Technician
-
2000 - 2004
Operator at KGP. Spent time performing outside area operator duties and panelman on Services, Stabilisation, DOMGAS production and Ship Loading. Operator at KGP. Spent time performing outside area operator duties and panelman on Services, Stabilisation, DOMGAS production and Ship Loading.
-
-
-
Wandoo
-
Wandoo Offshore
-
Maintenance / Operations Technician
-
Jan 1997 - Sep 2000
Performed commissioning activities to complete the commissioning and start up of the Wandoo B Offshore Production facility. Performed Operations and Instrument / Electrical duties for the Wandoo Alliance. This included area operations, control room operations, Inst / Elect maintenance and breakdown repairs, as well as project work (assisted design for new well drilling program). Was HSE representative for two years on the facility, as well as being involved in Emergency Response teams Performed commissioning activities to complete the commissioning and start up of the Wandoo B Offshore Production facility. Performed Operations and Instrument / Electrical duties for the Wandoo Alliance. This included area operations, control room operations, Inst / Elect maintenance and breakdown repairs, as well as project work (assisted design for new well drilling program). Was HSE representative for two years on the facility, as well as being involved in Emergency Response teams
-
-
-
United Construction
-
Karratha, Western Autstralia
-
Lead Instrument Technician
-
Jan 1995 - Feb 1996
Lead Instrument Technician for the Construction and Commissioning of the LPG facility at Woodside Energy's Karratha gas plant. Managed a team of seven (7) Instrument Technicians to complete the installation and commissioning of the new LPG facilities (including the LPG Plant, the LPG Loadout Jetty, and the LPG Storage Tanks (Propane and Butane) at the Woodside North West Shelf gas plant. Included tying in the new plant to the existing live Fractionation facilities and infrastructure and ensuring safe and timely start up of the facility upon completion. Show less
-
-
-
AOC
-
Goodwyn A Platform
-
Instrument Technician
-
Jun 1994 - Dec 1994
Construction / Commissioning activities on the Goodwyn A Offshore facility. Performed installation and commissioning of the various systems throughout the platform. Construction / Commissioning activities on the Goodwyn A Offshore facility. Performed installation and commissioning of the various systems throughout the platform.
-
-
-
Woodside Energy
-
Australia
-
Oil and Gas
-
700 & Above Employee
-
Instrument / Electrical Technician
-
Feb 1993 - Apr 1994
Maintenance technician for the Operations team looking after the newly commissioned LNG Train 3. Completed post-commissioning work to finalise minor punchlist activities left from construction / commissioning activities. Completed breakdown repairs on equip,net as required. Performed general PM work on equipment installed. Maintenance technician for the Operations team looking after the newly commissioned LNG Train 3. Completed post-commissioning work to finalise minor punchlist activities left from construction / commissioning activities. Completed breakdown repairs on equip,net as required. Performed general PM work on equipment installed.
-
-
Education
-
Karratha Senior High School