Craig Eccles (IOSH)

Tower Supervisor at CWind
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
York, England, United Kingdom, GB

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Renewable Energy Semiconductor Manufacturing
    • 1 - 100 Employee
    • Tower Supervisor
      • May 2021 - Present

      Leading a 5 man tower team on Dan Tysk OWF, replacing the array cables Leading a 5 man tower team on Dan Tysk OWF, replacing the array cables

    • United Kingdom
    • Renewable Energy Semiconductor Manufacturing
    • 1 - 100 Employee
    • Tower Supervisor
      • Aug 2020 - Mar 2021

      Leading a 5 man team on DKF OWF, installing subsea cable on TP’s and substations. Work includes prep of towers, MROV work, cable installation and Liaising with clients.

    • Tower Supervisor
      • Jun 2020 - Jul 2020

      Leading a 6 man team carrying out bespoke work on DKF OWF’s substation. Replacing MV topside inter connecter cables

    • United Kingdom
    • Renewable Energy Semiconductor Manufacturing
    • 1 - 100 Employee
    • Tower Supervisor
      • Mar 2020 - Mar 2020

      Leading a 4 man team for a cable replacement on Dan Tysk OWF Leading a 4 man team for a cable replacement on Dan Tysk OWF

    • Luxembourg
    • Construction
    • 700 & Above Employee
    • Tower Supervisor / ROV
      • Sep 2019 - Dec 2019

      Leading a 4 man tower team for cable installation on northwester2. Inc tower installation, substation pulls and export cables

    • Tower supervisor / mrov
      • Jun 2019 - Aug 2019

      Leading 4 man tower team on cable installation on Taiwan’s first OWF. Also completing secondary works on TP’s prior to top side been installed, including confined space work, removal of fixation and levelling jacks,

    • Norway
    • Oil and Gas
    • 700 & Above Employee
    • Rigging Supervisor
      • May 2019 - May 2019

      Rigging supervisor for mobilisation and preparation of export cable installation

    • Tower supervisor
      • Mar 2019 - Apr 2019

      Tower cable installation

    • United Kingdom
    • Utilities
    • 1 - 100 Employee
    • Rigging Supervisor
      • Jan 2019 - Feb 2019

      Cable replacement due to damage on existing cable from OSS to TP.

    • Rigging Supervisor
      • Nov 2018 - Dec 2018

      Installing DC export cables into termination room on the substation

    • Norway
    • Oil and Gas
    • 700 & Above Employee
    • Rigging supervisor
      • Oct 2018 - Nov 2018

      Leading a 5 man team, installing the export cable on EA1 substation

    • Tower supervisor
      • Jul 2018 - Oct 2018

      Leading a 4 man tower team pre rigging tp's and installing subsea cable

    • United Kingdom
    • Renewable Energy Semiconductor Manufacturing
    • 1 - 100 Employee
    • Tower superviser, cable installation
      • Oct 2017 - Jun 2018

      Tower supervisor, pre rig of tp's, installation of messenger lines and installation of 3 core submarine cable, Tower supervisor, pre rig of tp's, installation of messenger lines and installation of 3 core submarine cable,

    • Rov tech/rigger
      • Aug 2016 - May 2017

      Working as part of a tower team installing sub sea cables. Using Rov to monitor installation of tekmar within the TP. All works carried out to correct Rams and all health and safety adhered to including confined space work Working as part of a tower team installing sub sea cables. Using Rov to monitor installation of tekmar within the TP. All works carried out to correct Rams and all health and safety adhered to including confined space work

    • United Kingdom
    • Renewable Energy Semiconductor Manufacturing
    • 1 - 100 Employee
    • Supervisor
      • Oct 2015 - Sep 2016

      Supervisor of four man tower team, rigging and cable operations.

    • rov/rigger
      • May 2015 - May 2016

      GODE 2+1 wind farm. Installing sub sea array cables.Part of a four man team, rigging, messenger line installation and cable installation on tp's. Surveys on MIU and CPS done using MROV. Installation of hang offs.Supervised maintenance and services of MROV, rigging equipment inc generators, hpu's and hydraulic winches.

    • Netherlands
    • Staffing and Recruiting
    • 700 & Above Employee
    • opito rigger 3
      • Aug 2014 - May 2015

      Pulling AC and DC cables on Slywin alpha along side prysmian's cable vessel the Giulio Verne. Pulling cables into the CAT, with centraliser on the cable, then the jointing room using a sliding quadrant. Fitting permant horizontal and vertical hang offs. Worked on the Amrumbank west platform, pulling, stripping and cleating Export cable. Installing cable trays. Working to correct rams and adhering to health and safety. Pulling AC and DC cables on Slywin alpha along side prysmian's cable vessel the Giulio Verne. Pulling cables into the CAT, with centraliser on the cable, then the jointing room using a sliding quadrant. Fitting permant horizontal and vertical hang offs. Worked on the Amrumbank west platform, pulling, stripping and cleating Export cable. Installing cable trays. Working to correct rams and adhering to health and safety.

    • United Kingdom
    • Renewable Energy Semiconductor Manufacturing
    • 1 - 100 Employee
    • Rov operator/rigger
      • Jan 2014 - Jul 2014

      Working on the GYM wind farm installing cable. Using the video ray rov to monitor the cable pull and checking the tekmar is engaged correctly, also installing messenger lines. Using capsten winches and other rigging equipment to pull the cable. I also rig n de-rig towers and function test all the equipment.Carry out tool box talks, ensure we all work to correct method statements and risk assessments while working in a safe manner. Working on the GYM wind farm installing cable. Using the video ray rov to monitor the cable pull and checking the tekmar is engaged correctly, also installing messenger lines. Using capsten winches and other rigging equipment to pull the cable. I also rig n de-rig towers and function test all the equipment.Carry out tool box talks, ensure we all work to correct method statements and risk assessments while working in a safe manner.

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • ROV mechanical technician
      • Nov 2011 - Jan 2014

      Formally Perry Slinglys Systems. I was involved with the build and test of rov and tms systems. Mainly the work class rov, xlr and xlx. I was also part of the team that manufactured bespoke trenchers, namely the t1200 that went to canyon, also the t1500 that was also going to to canyon. This including a lot of problem solving, fault finding and laising with the customer. Formally Perry Slinglys Systems. I was involved with the build and test of rov and tms systems. Mainly the work class rov, xlr and xlx. I was also part of the team that manufactured bespoke trenchers, namely the t1200 that went to canyon, also the t1500 that was also going to to canyon. This including a lot of problem solving, fault finding and laising with the customer.

    • Mechanical Technician
      • Sep 2002 - Apr 2011

      I completed a 3 year apprenticeship here, worked on the production of the hawk training aircraft. I then worked on system installation before finally getting into the flight line hanger, working on the complete and live aircraft. Fiction test, engine ground runs and prep for flight. I completed a 3 year apprenticeship here, worked on the production of the hawk training aircraft. I then worked on system installation before finally getting into the flight line hanger, working on the complete and live aircraft. Fiction test, engine ground runs and prep for flight.

Education

  • Hull college
    NVQ 3 engineering, Engineering
    2002 - 2005
  • Snaith high
    1997 - 2002

Community

You need to have a working account to view this content. Click here to join now