Credentials
-
PCC Air Field Paving (Transportation Systems Center)
US Army Corps of Engineers -
USACE Construction Quality Management for Contractors
US Army Corps of Engineers
Experience
-
Sauer Construction
-
United States
-
Construction
-
1 - 100 Employee
-
Quality Control Manager
-
Oct 2021 - Present
$33.5M / (NGIS) Navy Gateway Inns & Suites $33.5M / (NGIS) Navy Gateway Inns & Suites
-
-
-
The Korte Company
-
United States
-
Construction
-
100 - 200 Employee
-
Quality Control Manager
-
Apr 2021 - Nov 2021
$72.7M / KC46A Fuels Maintenance Hangar; Tinker AFB, OK; Quality Control Manager
-
-
Quality Control Manager
-
Dec 2020 - Mar 2021
$31.2M / 85,510 SF F-35 Integrated Training Center, Eglin AFB, FL; Quality Control Manager
-
-
Quality Control Manager
-
Feb 2020 - Dec 2020
$10.4M / (NSST) Navigation, Seamanship & Ship-handling Trainer; Mayport Naval Station, Jacksonville FL; Quality Control Manager
-
-
Quality Control Manager
-
Aug 2016 - Feb 2020
$45.5M / 55,808 SF PMXG Plating Shop Renovation; Tinker AFB, OK; Quality Control Manager
-
-
-
Amec Foster Wheeler
-
United Kingdom
-
Oil and Gas
-
700 & Above Employee
-
Senior Construction Manager
-
Oct 2015 - Aug 2016
AMEC Foster Wheeler Senior Construction Manager, (Title-2 QA) services for the entire construction phase of the DLA-DDOO, Fire Suppression Multi Building project, Tinker AFB OK, Quality Assurance Services included the inspections of civil work, concrete, structural, architectural, electrical, fire alarm, etc. Project consisted of removal of the existing fire suppression systems in the buildings and install new systems per the approved contract documents. Project also consisted of installing a… Show more AMEC Foster Wheeler Senior Construction Manager, (Title-2 QA) services for the entire construction phase of the DLA-DDOO, Fire Suppression Multi Building project, Tinker AFB OK, Quality Assurance Services included the inspections of civil work, concrete, structural, architectural, electrical, fire alarm, etc. Project consisted of removal of the existing fire suppression systems in the buildings and install new systems per the approved contract documents. Project also consisted of installing a new underground fire loop and concrete water storage tank for feeding these facilities. Show less AMEC Foster Wheeler Senior Construction Manager, (Title-2 QA) services for the entire construction phase of the DLA-DDOO, Fire Suppression Multi Building project, Tinker AFB OK, Quality Assurance Services included the inspections of civil work, concrete, structural, architectural, electrical, fire alarm, etc. Project consisted of removal of the existing fire suppression systems in the buildings and install new systems per the approved contract documents. Project also consisted of installing a… Show more AMEC Foster Wheeler Senior Construction Manager, (Title-2 QA) services for the entire construction phase of the DLA-DDOO, Fire Suppression Multi Building project, Tinker AFB OK, Quality Assurance Services included the inspections of civil work, concrete, structural, architectural, electrical, fire alarm, etc. Project consisted of removal of the existing fire suppression systems in the buildings and install new systems per the approved contract documents. Project also consisted of installing a new underground fire loop and concrete water storage tank for feeding these facilities. Show less
-
-
-
Southwind Construction Ltd.
-
Canada
-
Construction
-
Quality Control Manager
-
Sep 2012 - Oct 2015
As Quality Control Manager, I was responsible for the overall management of the Quality Control Management Program to ensure compliance with the contract requirements. Responsible for quality of the work, ensuring the 3-phase inspection process is implemented and maintained, responsible for submittals, testing, inspections and close-out as required by the contract documents. I also performed daily site inspections and assisted with weekly safety talks. As Quality Control Manager, I was responsible for the overall management of the Quality Control Management Program to ensure compliance with the contract requirements. Responsible for quality of the work, ensuring the 3-phase inspection process is implemented and maintained, responsible for submittals, testing, inspections and close-out as required by the contract documents. I also performed daily site inspections and assisted with weekly safety talks.
-
-
-
CS Solutions Inc.
-
Tinker Air Force Base, OK
-
Quality Assurance (Owner)
-
Sep 2007 - Sep 2012
Owner of CS Solutions Inc. Government Contractor for the US Army Corps of Engineers at Tinker Air Force Base, OK. Quality Assurance Inspector for various Government projects to include: 1.7M, B2121 HVAC, 2nd Floor Remodel, Tinker AFB OK, Quality Assurance Representative, (September 2007-September 2009). $50.6M, 171,000 SF Medical Dental Clinic Replacement, Tinker AFB OK; Quality Assurance Representative (September 2009 – September 2012) Owner of CS Solutions Inc. Government Contractor for the US Army Corps of Engineers at Tinker Air Force Base, OK. Quality Assurance Inspector for various Government projects to include: 1.7M, B2121 HVAC, 2nd Floor Remodel, Tinker AFB OK, Quality Assurance Representative, (September 2007-September 2009). $50.6M, 171,000 SF Medical Dental Clinic Replacement, Tinker AFB OK; Quality Assurance Representative (September 2009 – September 2012)
-
-
-
McMaster Construction Inc.
-
Tinker Air Force Base, OK
-
Quality Control Systems Manager
-
Jun 2005 - Sep 2007
As Quality Control Manager, I was responsible for the overall management of the Quality Control Management Program to ensure compliance with the contract requirements. Responsible for quality of the work, ensuring the 3-phase inspection process is implemented and maintained, responsible for submittals, testing, inspections and close-out as required by the contract documents. I also performed daily site inspections and assisted with weekly safety talks. As Quality Control Manager, I was responsible for the overall management of the Quality Control Management Program to ensure compliance with the contract requirements. Responsible for quality of the work, ensuring the 3-phase inspection process is implemented and maintained, responsible for submittals, testing, inspections and close-out as required by the contract documents. I also performed daily site inspections and assisted with weekly safety talks.
-
-
-
Gray
-
United States
-
Professional Services
-
700 & Above Employee
-
Quality Control Systems Manager
-
May 2000 - Jun 2005
As Quality Control Manager, I was responsible for the overall management of the Quality Control Management Program to ensure compliance with the contract requirements. Responsible for quality of the work, ensuring the 3-phase inspection process is implemented and maintained, responsible for submittals, testing, inspections and close-out as required by the contract documents. I also performed daily site inspections and assisted with weekly safety talks. As Quality Control Manager, I was responsible for the overall management of the Quality Control Management Program to ensure compliance with the contract requirements. Responsible for quality of the work, ensuring the 3-phase inspection process is implemented and maintained, responsible for submittals, testing, inspections and close-out as required by the contract documents. I also performed daily site inspections and assisted with weekly safety talks.
-
-
-
McMaster Construction Inc.
-
Tinker Air Force Base, OK
-
Quality Control Systems Manager
-
Sep 1996 - May 2000
Multiple Projects as a Quality Control Manager, I was responsible for the overall management of the Quality Control Management Program to ensure compliance with the contract requirements. Responsible for quality of the work, ensuring the 3-phase inspection process is implemented and maintained, responsible for submittals, testing, inspections and close-out as required by the contract documents. I also performed daily site inspections and assisted with weekly safety talks. Multiple Projects as a Quality Control Manager, I was responsible for the overall management of the Quality Control Management Program to ensure compliance with the contract requirements. Responsible for quality of the work, ensuring the 3-phase inspection process is implemented and maintained, responsible for submittals, testing, inspections and close-out as required by the contract documents. I also performed daily site inspections and assisted with weekly safety talks.
-
-
Education
-
Oklahoma State University