Courtney King
Planning Specialist and Assistant Manager at Aerojet Rocketdyne- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Aerojet Rocketdyne
-
United States
-
Defense and Space Manufacturing
-
700 & Above Employee
-
Planning Specialist and Assistant Manager
-
Sep 2018 - Present
-
-
-
Lockheed Martin
-
United States
-
Defense and Space Manufacturing
-
700 & Above Employee
-
Assistant Plant Manager
-
Jun 2017 - Aug 2018
• Coverage for the plant manager during travel and absence from the site.• Manage 98 member workforce and all customer needs successfully.
-
-
Production Control, Planning, Inventory Control, Warehouse, Materials Operations Manager
-
Jun 2015 - Aug 2018
• Lead a 10 member union team • Responsible for personnel management and personnel development, employee training, work assignments, salary, recognition and disciplinary action of those employees. • Preparation and presentation of all executive level shortage, line of balance and inventory control reports.• Providing guidance on MRP systems, planning, organizing, shipping, receiving, and all other warehouse functions.
-
-
Assistant Production Operations Floor Supervisor
-
Sep 2011 - Aug 2018
• Ensure the delivery of all Production Assemblies to include, but not limited to; Barrel Assembly, Cargo Ramp, Main Landing Gear Doors, Wing Leading Edges for C-130 program and internal builds. • Cover for supervisors as required allowing for a seamless and consistent flow of management coverage.
-
-
Production Control, Material Controller/Scheduler/Coordinator/Supervisor
-
Nov 2009 - Jun 2015
• Coordination of all assembly deliveries to Marietta, Meridian and Johnstown to support customer needs• Give recommendations and help resolve any potential scheduling/delivery conflicts• Cover duties and act as production control/warehouse supervisor as required.
-
-
Sell-off/ROA Process Management Coordinator
-
Jun 2009 - Nov 2009
• Direct interface with the onsite and offsite DCMA customer • Coordination of all delivery schedules involving the sell-off of our product to our customers. • Interfaced with the install teams • Oversee all processes affecting the sell-off of product to our customer.
-
-
Production Control Planner Senior/Coordinator
-
Nov 2008 - Jun 2009
• Load all hardware requirements through the Supportability Integrated Logistics Capability system (SILC)• Interface with all areas of manufacturing, test, procurement, DCMA, materials distribution center and program office organizations to ensure program needs are being met. • Lead presenter and meeting officiate of the weekly USQ-78X GFE/Retrofit status meetings.
-
-
Lead Production Control Senior Top Level Analyzer
-
Jan 2007 - Nov 2008
• Load all hardware requirements through the MRP system and generate program status. • Supervise release of kits and work in process. • Department mentor to all new support analyzers entering the department.
-
-
Senior Engineering Change Analyzer
-
Nov 1997 - Jan 2007
• The coordination of engineering change activity to include; participation in design change board, the negotiation of production break-in-points, and implementation into the production line. • Implemented ECN’s into all product effected by the change. • Ensured that all products on site are at the correct revision levels. • Proficient in reading and interpreting drawings and prints. • Created a cost effective by making changes the “engineering change” process by inducting all ECN’s on line (via a network) and eliminating the storage & space it took to save ECN’s. This generated savings of over $17k and over 350 man hours yearly. Show less
-
-
Education
-
Fairmont State University
Master's degree, Business Administration and Management, General -
Fairmont State University
Bachelor's degree, Business Administration and Management, General