Corey Beck, Assoc AIA, CDT
Construction Services IV / Cost Estimator at FOS of CannonDesign- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
FOS of CannonDesign
-
United States
-
Facilities Services
-
1 - 100 Employee
-
Construction Services IV / Cost Estimator
-
May 2022 - Present
-
-
Construction Services III / Cost Estimator
-
Jan 2021 - May 2022
-
-
-
CannonDesign
-
United States
-
Design Services
-
700 & Above Employee
-
Construction Services III / Cost Estimator
-
Aug 2018 - Jan 2021
-
-
Construction Services II / Cost Estimator
-
Apr 2016 - Aug 2018
-
-
-
Birdair, Inc.
-
United States
-
Construction
-
1 - 100 Employee
-
Cost Estimator
-
Apr 2015 - Apr 2016
As a Cost Estimator at Birdair I was responsible for coordinating the efforts of the Sales Engineering, Construction, Purchasing, Shipping & Receiving, Service, Finance, and the Fabrication Department. This effort allowed me to work with Business Development Managers to produce accurate detailed Timberline estimates and market competitive proposal prices for tensile membrane structures in a timely manner. My prior technical and design experience also allowed me to support the BDMs in ways above and beyond of the typical responsibilities of the Cost Estimator position. This includes providing conceptual design assist consulting to clients. Designing connection details and other unique elements to fit the form and function of the project. Value engineering proposed designs to achieve the most efficient and cost effective approach. As well as performing up front structural engineering analysis resulting in the production of material takeoffs and bills of quantity.
-
-
-
Eberl Iron Works, Inc.
-
United States
-
Wholesale Building Materials
-
1 - 100 Employee
-
Estimator / Project Manager
-
Apr 2012 - Apr 2015
As an Estimator / Project Manager at Eberl Iron Works I was responsible for multiple phases of a project including design, drafting, estimating and project management. This allowed me to diversify my skills in the construction industry and grow as a professional by working with a team of experienced colleagues. My technical knowledge coupled with the estimating/project management skills learned at Eberl Iron Works has allowed me to be essential in successfully designing, drafting, estimating and managing the largest project in the 90+ year history of Eberl Iron Works.
-
-
-
Cambria Contracting
-
Construction
-
Architectural Drafter
-
Mar 2011 - Apr 2012
As an Architectural Drafter for Cambria Contracting I was responsible for the design and presentation of drawing documents for commercial construction. AutoCAD was used to draft various documents ranging from conceptual site/floor plans to detailed architectural sections and elevations. Google Sketchup was also used to create three dimensional models resulting in conceptual views and photo-realistic renderings. As an Architectural Drafter for Cambria Contracting I was responsible for the design and presentation of drawing documents for commercial construction. AutoCAD was used to draft various documents ranging from conceptual site/floor plans to detailed architectural sections and elevations. Google Sketchup was also used to create three dimensional models resulting in conceptual views and photo-realistic renderings.
-
-
Education
-
University at Buffalo
Bachelor of Science (BS), Architecture