Corey Gill

Vice President - Director of Construction at Way Engineering, Ltd.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Houston

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Texas Master Plumbing License
    Texas State Board of Plumbing Examiners

Experience

    • United States
    • Construction
    • 1 - 100 Employee
    • Vice President - Director of Construction
      • Nov 2021 - Present

    • Vice President - Director of Production
      • Aug 2020 - Dec 2021

    • Director of Production
      • Jan 2018 - Aug 2020

      Director of all production operations including product design, manufacturing and supply chain management. -Supervise 60+ members of design and manufacturing employees.-Oversee implementation of processes and installation for 200+ craft workers in 5 different offices across the country.

    • Executive Field Superintendent
      • Aug 2013 - Aug 2020

      Manage and supervise 100+ craft workers including mid-level supervisors, plumbers, pipefitters and fabrication shop workers. Duties Include:-Manage day to day activities of 100+ skilled workers including 15 Supervisors.-Manage a team of CAD Draftsman who Draw, Coordinate and Design Plumbing and HVAC piping systems and their components -Research and Implement labor saving procedures and technology-Oversee a Team of QAQC inspectors to ensure the quality of our work-Track, trend and log labor and productivity data including Manpower projections, Shop and Field Productivity studies and job cost analyses-Assist in the estimation of new projects, renovations and tenant build out jobs. Show less

    • QAQC Manager
      • Mar 2012 - Aug 2013

      Directed Way Engineering's inspection and testing program, as well as its proactive quality assurance procedures designed to prevent defects and improve performance on a 40 million dollar cancer research facility in the Houston Medical Center. Duties included:-Track and log all inspections and testing-Review product submittals and equipment for compliance with job specifications. -Conduct job site audits of field installation procedures (I.e. Welding, pipe fit up etc.)-Oversee the 3D computer aided coordination building services with other trades. Show less

    • Field Supervisor
      • Feb 2010 - Feb 2012

      Supervised 20+ workers on projects including commercial, medical, food service and light industrial applications. These projects included:---MD Anderson Heat Recovery Chiller Project A 1.5 million dollar infrastructure upgrade at MD Anderson Cancer Center. The project involved moving into place, installing and commissioning a heat recovery chiller in the basement of the facility adding 500+ tons of green cooling capacity without any interruption in service to the 24 story hospital.---2CC1 & 2CC2 Air Handler UpgradeA project that included the demolition, reinstallation and commissioning of 2 Air Handling Units on the roof of an existing hospital. This work was phased and coordinated to take place while patients were being treated below and was completed on time without any interruption to service.---FlexSteel Pipe Manufacturing FacilityA 5 acre industrial pipe manufacturing facility, to serve the needs of the growing petroleum industry, built in an industrial park outside of Houston, TX. The project included the coordination and installation of over 1000 ft. of large diameter Process Water Piping that was completed while the structure was being erected over-head. Show less

    • Plumber/Pipefitter
      • Aug 2007 - Feb 2010

    • United States
    • Construction
    • 1 - 100 Employee
    • Vice President - Director of Production
      • Aug 2020 - Present

    • Director of Production
      • Oct 2019 - Aug 2020

    • United States
    • Construction
    • 1 - 100 Employee
    • Vice President - Director of Production
      • Aug 2020 - Present

    • Director of Production
      • Jan 2018 - Aug 2020

Education

  • Plumber Local 68 Apprenticeship - Houston Community College
    Vocational Certification, Construction
    2007 - 2011
  • Pasadena High School
    High School
    2003 - 2007

Community

You need to have a working account to view this content. Click here to join now