Corey Farnsworth, PE, PMP
Project Engineer at Rulon International- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Spanish Elementary proficiency
-
English Native or bilingual proficiency
Topline Score
Bio
Credentials
-
Fundamentals of Engineering Exam
NCEESMay, 2015- Nov, 2024 -
Principles and Practice of Engineering Exam (FL)
NCEESOct, 2019- Nov, 2024 -
Project Management Professional (PMP)
Project Management InstituteApr, 2021- Nov, 2024
Experience
-
Rulon International
-
United States
-
Wholesale Building Materials
-
1 - 100 Employee
-
Project Engineer
-
Feb 2020 - Present
• Determines project requirements by reviewing quote, specifications, plans, and customer requirements • Creates, organizes, and submits product data and shop drawings for approval • Collaborates with design architect and installing contractor to facilitate feasible installation practices while also fulfilling design intent • Controls cost while satisfying design requirements and contractor installation needs • Drafts manufacturing drawings and bills of materials for production •… Show more • Determines project requirements by reviewing quote, specifications, plans, and customer requirements • Creates, organizes, and submits product data and shop drawings for approval • Collaborates with design architect and installing contractor to facilitate feasible installation practices while also fulfilling design intent • Controls cost while satisfying design requirements and contractor installation needs • Drafts manufacturing drawings and bills of materials for production • Collaborates with manufacturing team to provide all project specific information needed • Manages workload with up to 60 projects simultaneously through various stages of planning, execution, and monitoring Show less • Determines project requirements by reviewing quote, specifications, plans, and customer requirements • Creates, organizes, and submits product data and shop drawings for approval • Collaborates with design architect and installing contractor to facilitate feasible installation practices while also fulfilling design intent • Controls cost while satisfying design requirements and contractor installation needs • Drafts manufacturing drawings and bills of materials for production •… Show more • Determines project requirements by reviewing quote, specifications, plans, and customer requirements • Creates, organizes, and submits product data and shop drawings for approval • Collaborates with design architect and installing contractor to facilitate feasible installation practices while also fulfilling design intent • Controls cost while satisfying design requirements and contractor installation needs • Drafts manufacturing drawings and bills of materials for production • Collaborates with manufacturing team to provide all project specific information needed • Manages workload with up to 60 projects simultaneously through various stages of planning, execution, and monitoring Show less
-
-
-
Enercon Services, Inc.
-
United States
-
Utilities
-
700 & Above Employee
-
Engineering Team Lead
-
Feb 2018 - Feb 2020
Progressed into a leadership role as a Team Lead, reviewing and managing technical designs, directing task assignments, and maintaining productivity for 7-10 team members. In addition, my role as a project LRE (Lead Responsible Engineer) has involved managing up to 12 open projects simultaneously, and supporting up to 19 designers. • Manages work performance and performs technical reviews for a team designing overhead and underground 13 kV and 23 kV distribution circuits… Show more Progressed into a leadership role as a Team Lead, reviewing and managing technical designs, directing task assignments, and maintaining productivity for 7-10 team members. In addition, my role as a project LRE (Lead Responsible Engineer) has involved managing up to 12 open projects simultaneously, and supporting up to 19 designers. • Manages work performance and performs technical reviews for a team designing overhead and underground 13 kV and 23 kV distribution circuits, modifications, and system upgrades • Monitors and controls the cost, schedule, budget, quality, and scope of power distribution projects to ensure that all metrics remain on track • Trains new team members in the design and theory of power distribution networks In addition, I have supported our client by assisting with Storm Response efforts across the state of FL to restore power to customers in a time of crisis during Hurricanes Matthew (2016), Irma (2017), and Michael (2018).
-
-
Project Lead
-
Mar 2016 - Feb 2018
Relocated to West Palm Beach, FL to assist with new team development and continued to expand my skill set with a few design projects at local power plants, in addition to distribution design. Power Distribution Design: • Component selection based on client design standards • Electrical feeder design utilizing “Design Manager” and "Pole Foreman" software • Drafting of construction print packages that comply with requirements of permitting regulatory agencies • Development of… Show more Relocated to West Palm Beach, FL to assist with new team development and continued to expand my skill set with a few design projects at local power plants, in addition to distribution design. Power Distribution Design: • Component selection based on client design standards • Electrical feeder design utilizing “Design Manager” and "Pole Foreman" software • Drafting of construction print packages that comply with requirements of permitting regulatory agencies • Development of design process instruction manuals • Constructability walk downs with client personnel In addition, I have participated in field walk-downs at a combined cycle fossil power plant for the purpose of replacing various types of valves. I obtained field measurements of existing piping configurations, generated hand sketches of the layouts for as-built drawings, and determined new configurations for the positioning of the replacement valves. Additional analysis work has included performing stress analysis on a piping system associated with a fuel gas heater replacement, and performing a review for a compressible flow steady state fuel analysis using industry fluid analysis software.
-
-
Distribution Engineer
-
Dec 2014 - Feb 2016
During this time at ENERCON I worked on storm hardening for power distribution networks across the state of Florida. Distribution hardening involves design and analysis for the replacement of wooden power poles with concrete poles that utilize fiberglass cross members, the replacement of ceramic post insulators with more resilient polymer materials, and other system improvements including re-conductoring, where necessary, to improve the resiliency of the power distribution system during severe… Show more During this time at ENERCON I worked on storm hardening for power distribution networks across the state of Florida. Distribution hardening involves design and analysis for the replacement of wooden power poles with concrete poles that utilize fiberglass cross members, the replacement of ceramic post insulators with more resilient polymer materials, and other system improvements including re-conductoring, where necessary, to improve the resiliency of the power distribution system during severe weather and improve system reliability. Specific responsibilities have included the following: • Component selection based on client design standards • Electrical feeder design utilizing “Design Manager” and "Pole Foreman" software • Drafting of construction print packages that comply with requirements of permitting regulatory agencies • Development of design process instruction manuals • Constructability walk downs with client personnel To build employee collaboration, I also organized two ENERCON soccer teams in an indoor adult league as an opportunity for employees to build connections outside of the office.
-
-
-
First Quality
-
United States
-
Manufacturing
-
700 & Above Employee
-
Process Engineering Intern
-
May 2014 - Aug 2014
• Gained exposure to project management through participation in weekly project meetings • Interacted daily with project engineers and construction contractors during new machine installation • Designed a custom air filter quick-change device to reduce filter-replacement task time • Monitored upkeep of facility support equipment (supply air/water) to maintain plant operation • Developed engineering drawings in AutoCAD for plant use in fabricating parts & platforms to be installed on… Show more • Gained exposure to project management through participation in weekly project meetings • Interacted daily with project engineers and construction contractors during new machine installation • Designed a custom air filter quick-change device to reduce filter-replacement task time • Monitored upkeep of facility support equipment (supply air/water) to maintain plant operation • Developed engineering drawings in AutoCAD for plant use in fabricating parts & platforms to be installed on the blown film extrusion and ink printing lines Show less • Gained exposure to project management through participation in weekly project meetings • Interacted daily with project engineers and construction contractors during new machine installation • Designed a custom air filter quick-change device to reduce filter-replacement task time • Monitored upkeep of facility support equipment (supply air/water) to maintain plant operation • Developed engineering drawings in AutoCAD for plant use in fabricating parts & platforms to be installed on… Show more • Gained exposure to project management through participation in weekly project meetings • Interacted daily with project engineers and construction contractors during new machine installation • Designed a custom air filter quick-change device to reduce filter-replacement task time • Monitored upkeep of facility support equipment (supply air/water) to maintain plant operation • Developed engineering drawings in AutoCAD for plant use in fabricating parts & platforms to be installed on the blown film extrusion and ink printing lines Show less
-
-
-
Venture Measurement Co. (A Fortive Company)
-
United States
-
Automation Machinery Manufacturing
-
1 - 100 Employee
-
Design Engineering Intern
-
May 2013 - Aug 2013
• Patented significant work on a gearbox design involving modeling, prototyping, and validation testing • Performed analysis of gear train construction including a jaw coupling • Investigated interference-fit shaft testing for torque applications • Researched material choices and compared material properties for gasket seals • Modeled a nutating disk Flowmeter housing to validate manufacturing specifications • Generated significant solid modeling using Solidworks • Created… Show more • Patented significant work on a gearbox design involving modeling, prototyping, and validation testing • Performed analysis of gear train construction including a jaw coupling • Investigated interference-fit shaft testing for torque applications • Researched material choices and compared material properties for gasket seals • Modeled a nutating disk Flowmeter housing to validate manufacturing specifications • Generated significant solid modeling using Solidworks • Created extensive formula calculators using Microsoft Excel Show less • Patented significant work on a gearbox design involving modeling, prototyping, and validation testing • Performed analysis of gear train construction including a jaw coupling • Investigated interference-fit shaft testing for torque applications • Researched material choices and compared material properties for gasket seals • Modeled a nutating disk Flowmeter housing to validate manufacturing specifications • Generated significant solid modeling using Solidworks • Created… Show more • Patented significant work on a gearbox design involving modeling, prototyping, and validation testing • Performed analysis of gear train construction including a jaw coupling • Investigated interference-fit shaft testing for torque applications • Researched material choices and compared material properties for gasket seals • Modeled a nutating disk Flowmeter housing to validate manufacturing specifications • Generated significant solid modeling using Solidworks • Created extensive formula calculators using Microsoft Excel Show less
-
-
-
Tindall Corporation
-
United States
-
Construction
-
300 - 400 Employee
-
Document Control Intern
-
May 2012 - Aug 2012
• Operated the document control department at the headquarters in Spartanburg, SC • Serviced the engineering department by printing up to 600 pages of project drawings daily • Communicated closely with civil engineers, draftsmen, supervisors, and salesmen • Edited shop cards, steel cards, and "As Built" drawings in AutoCAD • Operated the document control department at the headquarters in Spartanburg, SC • Serviced the engineering department by printing up to 600 pages of project drawings daily • Communicated closely with civil engineers, draftsmen, supervisors, and salesmen • Edited shop cards, steel cards, and "As Built" drawings in AutoCAD
-
-
Education
-
Clemson University
Bachelor of Science (B.S.), Mechanical Engineering -
Spartanburg Methodist College
Associate of Science (A.S.), 4.00 GPA