Clint Moxham

General Manager Operations at Element 25 Limited
  • Claim this Profile
Contact Information
Location
Greater Perth Area, AU
Languages
  • English Native or bilingual proficiency
  • Indonesian Bahasa Elementary proficiency
  • Chinese Mandarin Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Western Australian Quarry Managers Certificate
    Department of Mines and Petroleum, Western Australia
    Jan, 2005
    - Oct, 2024
  • Dangerous Goods Security
    Department of Mines and Petroleum, Western Australia
    Aug, 2015
    - Oct, 2024

Experience

    • Australia
    • Mining
    • 1 - 100 Employee
    • General Manager Operations
      • Jun 2023 - Present

      The Butcherbird Manganese project is located in the southern Pilbara region of Western Australia, approximately 1,050km north of Perth and 130km south of Newman. E25 produces manganese concentrate from our 100% owned Butcherbird Project in WA, which hosts a large manganese resource of more than 260 million tonnes of resources. Australia’s largest onshore manganese resource (>260 million tonnes) The Butcherbird Manganese project is located in the southern Pilbara region of Western Australia, approximately 1,050km north of Perth and 130km south of Newman. E25 produces manganese concentrate from our 100% owned Butcherbird Project in WA, which hosts a large manganese resource of more than 260 million tonnes of resources. Australia’s largest onshore manganese resource (>260 million tonnes)

    • Executive Director
      • Aug 2022 - Jul 2023

      Site Senior Executive, Quarry Manager, Mining Engineering, Project Incubation, Mine Design and Scheduling, Quarry Manager, Pit Design Mineral Exploration, Drilling Down the Hole Hammer RAB rig capable to drill depths of 30m ,Health and Safety, Exploration Field Work, Geophysics, Mineral Prospecting, Tenement Applications, Auger, Soil Sampling, Mine Scheduling, Studies, Drone Imagery, Mine Permitting, On Site Engineering www.mox.company Site Senior Executive, Quarry Manager, Mining Engineering, Project Incubation, Mine Design and Scheduling, Quarry Manager, Pit Design Mineral Exploration, Drilling Down the Hole Hammer RAB rig capable to drill depths of 30m ,Health and Safety, Exploration Field Work, Geophysics, Mineral Prospecting, Tenement Applications, Auger, Soil Sampling, Mine Scheduling, Studies, Drone Imagery, Mine Permitting, On Site Engineering www.mox.company

    • United States
    • Mining
    • Non Executive Director
      • Aug 2022 - Sep 2022

      High Purity Magnetite www.athenaresources.com.au ASX:AHN High Purity Magnetite www.athenaresources.com.au ASX:AHN

    • Australia
    • Mining
    • 1 - 100 Employee
    • General Manager
      • Aug 2021 - Jul 2022

      The Nifty Copper Mine is located on the western edge of the Great Sandy Desert in the north-eastern Pilbara region of Western Australia, approximately 350 km southeast of Port Hedland.Cyprium is currently completing studies with an aim of establishing a long-term producing copper mine. Cyprium intends to re-start operations utilising a heap leach SX-EW to retreat the current heap leach pads, open pit oxide and transitional material. Concurrently, comprehensive metallurgical test work is expected to determine the optimal pathway to unlock value from the open pit sulphide material. Show less

    • Mining Manager
      • Aug 2021 - Nov 2021

    • Australia
    • Mining
    • 1 - 100 Employee
    • General Manager
      • Aug 2020 - Aug 2021

      Nathan River Resources (NRR) has been issued an authorisation to recommence mining activities as part of the Nathan River Project mine, in the Roper Gulf region. The mine, an established open-cut iron ore mine located 55km southeast of Ngukurr, had been in care and maintenance until 2015. In 2018, Nathan River Resources was approved to reopen the mine and ship existing stockpiled minerals and process low-grade ore at the site with proposed establishment of a DMS and benefaction plant. The current plan sees high-grade iron ore mined and exported from the existing open pits and transported via the established haul road to the Bing Bong load-out facility. Show less

    • Australia
    • Mining
    • 400 - 500 Employee
    • Project Manager
      • Mar 2019 - Aug 2020

      NRW takeover of BGC Contracting The project’s value is approximately $95 million and expected to run for 78 weeks with site works commencing in November 2019. The project scope includes the development of initial mining pre-strip and earthworks infrastructure to enable the commencement of mining operations. Senior Project Manager Company Name BGC Contracting Dates Employed Mar 2019 – Jan 2020 Employment Duration 11 mos Senior Project Manager In August 2019 BGC Contracting has again been awarded an extension to the contract through to June 2022. This will be a Life Of Mine contract extension which will see BGC Contracting providing services up to the end of operations at the Mt Webber mine site. Manage a Ore Handling Plant production rate of 1,000T per hour in a 3-stage crushing and screening circuit, sampling station and 2 radial stackers that can stockpile up to 180,000 tonnes of final product. The open pit mining operation involves conventional drill, blast, load and haul techniques in 3 pits. Reserves are in the order of 50mt. The operation will mine approximately 3.9 million bcm of material per annum. BGC taken over by NRW Show less

    • Australia
    • Mining & Metals
    • 1 - 100 Employee
    • Mine Manager - Registered Manager, Quarry Manager
      • Dec 2017 - Mar 2019

      Manage daily aspects of the mine to produce 2Mtpa gold ore, 12Mbcm material movement. Manage daily aspects of the Open Pit and Underground operations. Mentor and guide the technical services team, to produce high quality mine plans and schedules. Reinvigorate safe working procedures for the mining operations. Show and develop the mining team “what good looks like”, implementing best practice. Achieve a 88% reduction in Total Recorded Frequency Injury Rate (TRIFA) and a better than budget quarter for first time in 18 months during first quarter managing the site, as well as achieving second highest mining production recorded. The mining rate at Nullagine rose from an average of approximately 400,000 Bank Cubic Metres (BCM) for the first six months, to over 600,000 BCM. This increase has been achieved employing more efficient mining strategies in our open pits, delivering a strong boost to productivity by employing extra staff and operators to effectively and productively utilise our existing equipment. Planned, developed and put into production the Bartons underground operations. The underground development increased to over 400m with one Jumbo. • Registered Manager and Quarry Manager • Open pit and underground operations • Establish underground operations • Management of daily mining operations at Nullagine Gold Operations (250 personnel) • Breathe new life into systems, inductions, processes and procedures for mining operations • Ensure that assets “sweat”, to produce more with less. • Owner miner and contract mining • Manage Mining, Drill and Blast, Haulage Show less

    • Australia
    • Government Administration
    • 1 - 100 Employee
    • Deputy Director - Board of Examiners, Quarry Manager
      • Feb 2015 - Feb 2019

      The functions of the Board of Examiners is— (a) to examine in accordance with the regulations the qualifications, experience and character of applicants for certificates of competency and issue such certificates where appropriate; and (b) to receive, consider and inquire into complaints concerning holders of certificates of competency and to suspend or cancel such certificates where appropriate; and (c) to perform such other functions as may be conferred in the regulations. Show less

    • Chairman
      • Jan 2017 - Jan 2018

      Optin is a new NFP promoting connection for Mothers and Volunteers within your local community. Help us pioneer Optin in Perth during 2017. http://www.optin.org.au/ Optin is a new NFP promoting connection for Mothers and Volunteers within your local community. Help us pioneer Optin in Perth during 2017. http://www.optin.org.au/

    • Mining Consultant
      • Jun 2016 - Dec 2017

      Casual Consultant Mining, Geology, Project Economics, Management Iron ore, Gold, Nickel, Uranium, Molybdenum, Copper Casual Consultant Mining, Geology, Project Economics, Management Iron ore, Gold, Nickel, Uranium, Molybdenum, Copper

    • Executive Director
      • Apr 2015 - Jan 2017

      FDA Mining Solutions is a company comprised of experts in the fields of forensics, drug testing and mining. As such our team is able to provide the mining industry with a complete suite of products and services that can not only detect drug and alcohol use in the workplace, but prevent and deter employees from engaging in such illegal activity in the first instance. http://www.fdaminingsolutions.com FDA Mining Solutions is a company comprised of experts in the fields of forensics, drug testing and mining. As such our team is able to provide the mining industry with a complete suite of products and services that can not only detect drug and alcohol use in the workplace, but prevent and deter employees from engaging in such illegal activity in the first instance. http://www.fdaminingsolutions.com

    • Project Manager
      • Aug 2015 - Jun 2016

      Manage $140M contract with Rio Tinto Iron Ore Manage subcontractors Action Drill and Blast, Cape Crushing - 5mtpa operation Responsible for Drill, Blast, Mining, Road Haulage and Crushing Quarry Manager Appointment NRW was awarded a contract from Rio Tinto for contract mining and ore haulage, which will increase the production at the Nammuldi mine. The scope of the contract is for the development of the Greenfield site including; •Construction of mine haul roads, ore stockpiles, waste dumps and other mine infrastructure •Production mining (including drill & blast) •Haulage of high grade ore from mine area to the existing Nammuldi Plant site (12km’s) •Supply, installation and operation of two 5 Mtpa crushing plants The NRW fleet that is being utilised on the project includes two 250T excavators, one 190T excavator, five 992 loaders, fourteen 140T dumptrucks, three 90T dumptrucks, four 200T roadtrains, seven D10 dozers, two 16 graders, one 14 grader and five watertrucks. The contract is anticipated to have a peak of 140 personnel on site, including local indigenous participation through significant Pilbara Aboriginal Business involvement. Show less

    • Australia
    • Mining
    • 700 & Above Employee
    • Underground Miner Extraordinaire
      • Apr 2015 - Aug 2015

      Operating time to qualify for 1st Class Mine Managers Ticket Underground Truck Driving Service Crew Charge up Operating time to qualify for 1st Class Mine Managers Ticket Underground Truck Driving Service Crew Charge up

    • Australia
    • Mining
    • 700 & Above Employee
    • Mining Manager
      • Jun 2014 - Apr 2015

      • Alternate Registered Manager / Quarry Manager• Management of daily mining operations at Iron Valley Operations (130+ personnel)• Develop systems, inductions, processes and procedures for new mining operations• Ramp up of production to 5 Mtpa• Owner/Miner setup• Manage Mining, Crushing, Haulage, Village and Laboratory

    • General Manager
      • Jul 2013 - Jun 2014

      •Hold statutory position of Registered Mine Manager, Quarry Manager•Management of daily mining operations at Spinifex Ridge Iron Ore Operations (116 personnel)•Ramp up of production to 1.8Mtpa, expansion of camp, extension of Air Strip•Manage contractors for Mining (3.6Mbcm), Crushing(1.8Mt), Haulage(1.8Mt & 190km)•Transition during the sale of operations from Moly Mines to Mineral Resources Limited•Lead on site team through Category 3 (200km/hr winds) Cyclone Christine

    • Mining
    • 1 - 100 Employee
    • Registered Mine Manager
      • Sep 2012 - Jun 2013

      •Management of daily mining operations at Spinifex Ridge Iron Ore Operations (100 personnel) •Manage contractors for Mining (1.8Mbcm), Crushing(1.2Mt), Haulage(1.2Mt & 190km), Stevedoring (Port Hedland, Utah Point) and Government Authorities •Drive refinement in Scheduling (Strategic, Life of Mine, Long Term, Medium & Short Term Planning) •Due Diligence for projects and investment •Hold statutory position of Registed Manager, Quarry Manager •Support for sale of Spinifex Ridge operations •Lead the onsite team through Category 5 (290km/hr winds) Cyclones, Flooding, Bushfires, Show less

    • United States
    • Oil and Gas
    • 1 - 100 Employee
    • Mine Manager
      • May 2012 - Sep 2012

      •Management of daily mining operations at Pine Creek Iron Ore Operations (320 personnel) •Mining (10Mbcm), Crushing(4Mt) , Maintenance and Haulage Contractors •Scheduling (Strategic, Life of Mine) •Drive refinement in Medium & Short Term Planning •Manage pit optimization review with consultant input •Develop mine rehabilitation plan to limit impact of Black Shale, both current and legacy issues. •Management of daily mining operations at Pine Creek Iron Ore Operations (320 personnel) •Mining (10Mbcm), Crushing(4Mt) , Maintenance and Haulage Contractors •Scheduling (Strategic, Life of Mine) •Drive refinement in Medium & Short Term Planning •Manage pit optimization review with consultant input •Develop mine rehabilitation plan to limit impact of Black Shale, both current and legacy issues.

    • Principal Mining Engineer
      • Mar 2010 - May 2012

      •Mining Engineering for the Pre –Feasibility and Feasibility Study completed for Iron Ore operations 1Mtpa •Revision of Feasibility Study and Bankable Study for 10Mtpa Molybdenum Project •Scheduling (Strategic, Life of Mine, Long Term, Medium & Short Term Planning) •Mining and Haulage tender issue and review for Spinifex Ridge:1Mtpa Iron Ore Project and 10Mtpa Molybdenum Project •Pit & waste dump design, ROM & skyway and ridge access •Early pioneering contour works program to develop open pits •Due Diligence for projects and investment •Alternate Register Manager for Greenfields start-up and construction of operations •Held statutory positions of Quarry Manager and DeputyRegistered Manager •Lead the onsite team through Category 5 (290km/hr winds) Cyclone Lua, Flooding, Bushfires Show less

    • United Kingdom
    • Oil and Gas
    • Senior Mining Engineer
      • 2008 - 2010

      •Produce business model case for the whole of BHP Iron ore(Whaleback, Mining Area C, Yandi, Yarrie and Satellite Ore bodies) Life of Asset Plan to then be feed into the business cost model (5 -30+ years) •Generation of costed strategic mine plans for Rapid Growth Planning 5 (RGP 5) Selection Phase Study +55Mtpa, ore body selection, initiation, ramp up, sustaining load and ramp down •Generation of costed strategic mine plans for Rapid Growth Planning 4 (RGP4) Definition Phase Study +26Mtpa, ore body selection, initiation, ramp up, sustaining load and ramp down •Open Pit & waste dump designs for several satellite ore bodies including Jimblebar,W5,W6, Hashimoto 1-4 •Life of Mine scheduling using Blasor (BHP in house software) •Mine cost modelling •Engagement with Investment Evaluation, Environmental and Project Management teams Show less

    • Australia
    • Mining
    • 1 - 100 Employee
    • Strategic Planner
      • 2007 - 2008

      •Scoping for Ranger pit expansion (Underground, Cutback, Heap Leach, Ore Sorting) including scale of operations dependent upon the 8 year lease extension to give the optimum financial output. •Generate plans to illustrate ROM, stockpiles and plant optimized schedules to make use of all stockpiles before mining lease expires •Mine fleet selection study •Stockpile design meeting heritage, safety and environmental criteria •Option analysis of design criteria •Relief Mine Superintendent at Ranger Mine Show less

    • Senior Mining Engineer
      • 2005 - 2007

      •Greenfields start-up of operations start-up of Nammuldi •Drill and Blast design •Implementation of project to reduced oversize in blasts •Implement streamlined reports and data processing •Improved blast block reconciliation •Investigation into PDA devices for drill and blast technicians •Held statutory positions Quarry Manager, Deputy Registered Manager •Mine and Train scheduling •Pit & waste dump design •Management of contractors •Greenfields start-up of operations start-up of Nammuldi •Drill and Blast design •Implementation of project to reduced oversize in blasts •Implement streamlined reports and data processing •Improved blast block reconciliation •Investigation into PDA devices for drill and blast technicians •Held statutory positions Quarry Manager, Deputy Registered Manager •Mine and Train scheduling •Pit & waste dump design •Management of contractors

    • Mining Engineer
      • 2003 - 2005

      •Daily production planning •Short & medium term planning •Blast crew •Truck operator •Mine design •Drill and blast design •Mine scheduling •Completion of WA Quarry Managers Certificate •Six sigma yellow belt •Daily production planning •Short & medium term planning •Blast crew •Truck operator •Mine design •Drill and blast design •Mine scheduling •Completion of WA Quarry Managers Certificate •Six sigma yellow belt

    • Mining
    • 1 - 100 Employee
    • Mining Engineer
      • 2001 - 2001

      •Fixed Plant Maintenance Supervisor •Plant rate generation •Tender document input •Fixed Plant Maintenance Supervisor •Plant rate generation •Tender document input

    • Assistant Void Technical Officer
      • 1999 - 2001

      • Detection of in pit voids and old underground workings ensuring that the mine operated in a safe manner • Detection of in pit voids and old underground workings ensuring that the mine operated in a safe manner

Education

  • Curtin Graduate School of Business
    Master of Business Administration (MBA), Business Administration
    2008 - 2011
  • Curtin University
    Master of Science (M.Sc.), Mineral Economics
    2006 - 2011
  • Curtin University
    Graduate Diploma, Mining
    1999 - 2001
  • Curtin University
    Bachelor of Applied Science (BASc), Mineral Exploration and Mining Geology
    1996 - 1998

Community

You need to have a working account to view this content. Click here to join now