Cliff Pugh

Township Electrician at Radnor Township
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
US
Languages
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

  • Radnor Township
    • Radnor township
    • Township Electrician
      • 1998 - Present

      The (3) Main Responsibilities are Installation, Trouble Shooting, and Maintenance of Traffic Signals, Supplying Temporary Power to the Intersections when they lose PECO Power, Trouble Shooting, and Maintenance of (5) Sewer Pumping Stations. Then you have everything Electrical through out the Township, along with ordering all Equipment and Parts necessary for all Electrical Repairs and Updates. During the Fall through out Leaf Season I will be Called out to an area to help Flag for a Leaf Crew. I also am called in during the Winter Months for Snow Plowing either in a Dump Truck, Pick Up Truck, or Trash Truck.

  • Dunn Electric
    • Upper Darby
    • Journeymen Electrician
      • 1983 - 1997

      I worked with a Master Electrician and we Designed and Installed everything Low Voltage Landscape Lighting, New Electrical Services, Recessed Lighting, Dedicated Circuits, Intercom Systems, Automatic Door Openers, Swimming Pool Wiring, Whole House Rewiring (old work), Whole House Wiring (new work), if it had a wire going to it or coming from it we did it. I worked with a Master Electrician and we Designed and Installed everything Low Voltage Landscape Lighting, New Electrical Services, Recessed Lighting, Dedicated Circuits, Intercom Systems, Automatic Door Openers, Swimming Pool Wiring, Whole House Rewiring (old work), Whole House Wiring (new work), if it had a wire going to it or coming from it we did it.

    • Installation & Service Foreman
      • 1978 - 1983

      I was Responsible for Setting up the Installation, Ordering all Material for the Installation, and making sure the Installation was Completed on Time and on Budget. I was Responsible for (3) Men in my Crew. I was Responsible for Setting up the Installation, Ordering all Material for the Installation, and making sure the Installation was Completed on Time and on Budget. I was Responsible for (3) Men in my Crew.

Education

  • IMSA Certification
    2001 - 2001
  • Haverford High School
    High School, Applied Mathematics
    1975 - 1979

Community

You need to have a working account to view this content. Click here to join now