Nov 2022 - Present
PROJECT: CONSTRUCTION OF OPUAMA WELL – 15 FLOWLINE AND WELL HEAD PLATFORM (WHP) • Conduction and documentation of Welders Performance Qualification Test (WPQT) • Checking of pipe spool and structural materials fabrication based on approved spool isometric drawing & bill of materials. • Piping spools and structural daily Fit-up & welding inspection reports and documentation for NDE activities. • Weld mapping of isometric drawing and weld summary documentation • Review of Material Test Certificates for Raw Materials like Pipes, Fittings, Flanges & Welding Consumables. • Quality check of construction materials based on clients standard. • Punch listing of installed process and instrument lines for hydrotest and pneumatic test using approved P&ID prior to commissioning. • Preparation of Test Packs individual system wise, which includes material certificates, welding history records, NDT reports, hydro test reports etc., and getting client’s approval. • Day to day follow up and Co-ordination with planning, Production & third-party Inspection Agency. • Carrying out the Welding inspection before, during and after welding operation as per approved WPS, test plan, relevant engineering drawing, international standard and project specification. Show less
-
-
-
Nalds Engineering Company Limited
-
Seplat Energy Gas Plant, Oben, Edo State
-
Quality Assurance Quality Control Engineer
-
Sep 2022 - Nov 2022
PROJECT: INSTALLATION OF NEW INLET MANIFOLD LIGAMENTS FOR OBEN GAS PLANT • Conduction and documentation of Welders Performance Qualification Test (WPQT) • Checking of pipe spool fabrication based on approved spool isometric drawing & bill of materials. • Piping spools daily Fit-up & welding inspection reports and documentation for NDE activities. • Weld mapping of isometric drawing and weld summary documentation • Review of Material Test Certificates for Raw Materials like Pipes, Fittings, Flanges & Welding Consumables. • Punch listing of installed process and instrument lines for hydrotest and pneumatic test using approved P&ID prior to commissioning. • Preparation of Test Packs individual system wise, which includes material certificates, welding history records, NDT reports, hydro test reports etc., and getting client’s approval. • Day to day follow up and Co-ordination with planning, Production & third-party Inspection Agency. • Carrying out the Welding inspection before, during and after welding operation as per approved WPS, test plan, relevant engineering drawing, international standard and project specification. • Preparation and documentation of welding QAQC procedures Show less
-
-
-
-
-
Mar 2021 - Apr 2022
PROJECT: FIRE WATER PIPING FABRICATION AND INSTALLATION FOR THE 10,000 BPD NIGER DELTA (ND) REFINERIES, OGBELE FIELD• Conduction and documentation of Welders Performance Qualification Test (WPQT)• Checking of pipe spool fabrication based on approved spool isometric drawing & bill of materials. Piping spools daily Fit-up & welding inspection reports and documentation for NDE activities.• Weld mapping of isometric drawing and weld summary documentation• Review of Material Test Certificates for Raw Materials like Pipes, Fittings, Flanges & Welding Consumables.• Punch listing of installed process and instrument lines for hydrotest and pneumatic test using approved P&ID prior to commissioning.• Preparation of Test Packs individual system wise, which includes material certificates, welding history records, NDT reports, hydro test reports etc., and getting client’s approval.• Day to day follow up and Co-ordination with planning, Production & third-party Inspection Agency.• Carrying out the Welding inspection before, during and after welding operation as per approved WPS, test plan, relevant engineering drawing, international standard and project specification.• Preparation and documentation of welding QAQC procedures Show less
-
-
-
Jan 2020 - Mar 2021
PROJECT: OSBL FACILITY PIPING FABRICATION AND INSTALLATION FOR THE10,000 BPD NIGER DELTA (ND) REFINERIES, OGBELE FIELD• Conduction and documentation of Welders Performance Qualification Test (WPQT)• Checking of pipe spool fabrication based on approved spool isometric drawing & bill of materials. Piping spools daily Fit-up & welding inspection reports and documentation for NDE activities.• Weld mapping of isometric drawing and weld summary documentation• Review of Material Test Certificates for Raw Materials like Pipes, Fittings, Flanges & Welding Consumables.• Punch listing of installed process and instrument lines for hydrotest and pneumatic test using approved P&ID prior to commissioning.• Preparation of Test Packs individual system wise, which includes material certificates, welding history records, NDT reports, hydro test reports etc., and getting client’s approval.• Day to day follow up and Co-ordination with planning, Production & third-party Inspection Agency.• Carrying out the Welding inspection before, during and after welding operation as per approved WPS, test plan, relevant engineering drawing, international standard and project specification.• Preparation and documentation of welding QAQC procedures Show less
-
-
-
Mar 2019 - Jan 2020
PROJECT: OSBL FACILITY PIPING FABRICATION AND INSTALLATION OF FOR THE 10,000 BPD NIGER DELTA (ND) REFINERY EXPANSION AT THE NDPR OGBELE FIELD• Maintained tactical control of project timelines to keep teams on task and achieve schedule targets.• Materials and Equipment (stock) management before, during and after project• Project cost control and financial reporting to stakeholders • Labour relations and general HR administration• Coordinated document exchange between departments, contractors, suppliers and customers.• Liaised with client representative on documentation flow, handover and project close-out.• Maintained document archive and file server of approved documents and drawings to provide easy traceability and retrievability.• Generation of pipe general assembly drawing from Navisworks• Generation and development of bills of materials from ISO documents.• Supervision and Monitoring of process line insulation works• Development of compensation and benefits for workers to meet preset requirements. Show less
-
-
-
Jun 2018 - Mar 2019
PROJECT: CONSTRUCTION OF HDPE FIRE WATER UNDERGROUND PIPING FOR THE 10,000 BPD NIGER DELTA (ND) REFINERY EXPANSION AT THE NDPR OGBELE FIELD• Maintained tactical control of project timelines to keep teams on task and achieve schedule targets.• Materials and Equipment (stock) management before, during and after project• Project cost control and financial reporting to stakeholders • Labour relations and general HR administration• Coordinated document exchange between departments, contractors, suppliers and customers.• Liaised with client representative on documentation flow, handover and project close-out.• Maintained document archive and file server of approved documents and drawings to provide easy traceability and retrievability.• Generation of pipe general assembly drawing from Navisworks• Generation and development of bills of materials from ISO documents.• Supervision and Monitoring of process line insulation works• Development of compensation and benefits for workers to meet preset requirements. Show less
-
-
-
Kimuto Nigeria Limited
-
Nigeria
-
Construction
-
1 - 100 Employee
-
Project Engineer
-
Aug 2015 - Oct 2017
PROJECT: CHEVRON ESCRAVOS GAS PLANT (EGP) TRAIN #1 EAST-WEST PIPE RACKS FIREPROOFING • Assist the construction manager in establishing project objectives, procedures, data collection methods, and performance requirements within the constraints of company policy. • Prepare schedule-based and as-needed updates of construction activities, as well as an appraisal of the required people and equipment. • Develop and implement appropriate testing methodologies to track project performance. • Notify immediately all supervisors and subcontractors of any changes to the construction schedule, and collaborate closely with stakeholders to ensure that all requirements are met. • Maintain control of the project's budget, schedule, and database, and report to the project manager on a frequent basis to keep him or her abreast of job progress, plans, and issues that could severely impact costs or timetables. • Manage standards and specifications for compliance, quality control, and quality assurance Show less
-
-
-
Design Simulation Automation and Services Nigeria Limited
-
Suite 28 Irewole Street Opebi Ikeja Lagos.
-
Process Engineer
-
Sep 2013 - Dec 2014
• Developed process flow diagram (PFD) and process instrumentation diagram (P&ID) documentation and specifications for process modification works in accordance to clients’ project requirements and regulatory standards • Process separators (2phase and 3phase), compressor, pumps, shell & tube exchangers, process columns, control valves and process lines resizing to meet clients’ process plant debottlenecking specifications. • Developed process simulation report and dynamic simulation plan and study in proffering optimized solutions to clients’ process control issues • Performed material and energy balance calculation for optimization of clients’ materials and energy needs • Training and mentoring of Junior Process Engineers in the use of process simulation and design software Show less
-
-
-
Pabio Stone Limited
-
Lagos, Nigeria
-
Process Engineer
-
Jun 2014 - Sep 2014
• Developed process flow diagram (PFD) and process instrumentation diagram (P&ID) documentation and specifications for process modification works in accordance to clients’ project requirements and regulatory standards • Involved in the production and documentation of process equipment and piping data sheets • Performed material and energy balance calculation for optimization of clients’ materials and energy needs • Carried out process simulation of production pipelines predicting Hydrate formation in them as well as providing the needed solutions and control. Show less
-
-
-
Warri Refining and Petrochemical Company Limited (WRPC),
-
Ekpan-Warri, Delta State, Nigeria
-
Operations Intern
-
Dec 2009 - May 2010
• Assisted the operations team in equipment turn around maintenance (TAM) prior to plant startup • Assisted the operations team in equipment turn around maintenance (TAM) prior to plant startup
-
-
-
Delta Steel Company Nigeria Limited (DSC)
-
Aladja, Delta State, Nigeria.
-
Operations Intern
-
Sep 2009 - Dec 2009
• Assisted the operations team in equipment turn around maintenance (TAM) prior to plant startup • Assisted the operations team in equipment turn around maintenance (TAM) prior to plant startup
-
-