Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Renewable Energy Semiconductor Manufacturing
    • 1 - 100 Employee
    • Director
      • Nov 2016 - Present

      Altura Group Pty Ltd is an Australian project development company formed in 2016 to meet the growing need for experienced pumped hydro project development. Our first project, 242MW Goat Hill Pumped Hydro in South Australia is in advanced stages of development and preparing for an investment decision in 1H 2020 We are advancing a 1GW / 10GWh portfolio of projects at strategic locations in Victoria, NSW and Queensland at the right scale (300-400MW) in locations with strong MLF & access to renewable resources & load Up to 22GW of new utility storage is forecast to 2036 (AEMO 2018 ISP) and pumped hydro is most mature and lowest cost form of utility storage. Pumped hydro requires strong expertise in development and Altura’s projects offer confidence in new supply to meet the forecast demand.

    • Australia
    • Utilities
    • 700 & Above Employee
    • Project Director - Hydro, Solar & Gas Power
      • Feb 2014 - Aug 2016

      Responsible for project origination, concept definition, FEED study and contract procurement of a 2,000MW green-field utility-scale solar, pumped storage hydro & gas power projects within the Chilean Energy Market for Origin Energy. - Site identification & technical management acquisition of new and existing project developments strategic to the organizations market entry strategy in Chile. - Management of strategic supply relationships including key equipment packages, technology providers, civil contractors and infrastructure associates - Business development of demand opportunities such as alliances with with mining customers. - Leading a multi-disciplinary team in the management of economic optimizations, project definition and FEED studies, site campaigns, contracts & technical specifications. - Owners Representative for Joint Venture investments in utility solar projects

    • Development Manager
      • Feb 2012 - Feb 2014

      Secondment from Origin Energia Austral Joint Venture in Chile (Origin / Xstrata Copper, Glencore), responsible for the transformation of a 950MW hydro complex in Aysen, Chile. The 950MW Energia Austral complex is located 500km south of the Central Interconnected System. During the time as development manager, the project was transformed from a 800km overhead transmission line through Chilean Patagonia subsea HVDC transmission corridor which significantly reduced the social and environmental footprint of the project and resulted in a project with improved economics with lower risk and resource intensity. Significant redesign of the projects core scheme through optimisation of headworks, tunnelling and overall configuration produced a project of significantly lower risk profile and environmental footprint while improving project economics.

    • Development Executive
      • 2008 - 2011

      Development Executive in Origin´s Major Projects Development (MDP) Group responsible for: - strategy and development for project development relating to Origin´s Australian energy portfolio - technical & project due diligence for Origin´s New South Wales asset acquisition in 2010 - project development manager for 5 OCGT development projects across Australia between 2008-2012 - solar & windpower site selection & infrastructure management - feasibility studies for biomass power generation from mallee crops in Australia´s wheatbelt - technical due diligence for Origin´s acquisition of Energy Austral, Xstrata Copper hydropower complex in Chile

    • Australia
    • Oil and Gas
    • 1 - 100 Employee
    • Strategy and Development
      • 2005 - 2008

      - Owner´s Representative for 68MW biomass Cogeneration projects construction at Condong and Broadwater sugar mills in Northern NSW with Sunshine Sugar, NSW Sugar Milling Cooperative - Feasibility Study Manager for Mt Piper Coal Rail Unloader project - Feasibility Study Manager for 2,000MW Mt Piper Super-Critical Coal Power Station Expansion - Mallee Biomass co-firing trials at Wallerawang Power Station - Strategic Planning for Delta Electricity energy portfolio - Owner´s Representative for 68MW biomass Cogeneration projects construction at Condong and Broadwater sugar mills in Northern NSW with Sunshine Sugar, NSW Sugar Milling Cooperative - Feasibility Study Manager for Mt Piper Coal Rail Unloader project - Feasibility Study Manager for 2,000MW Mt Piper Super-Critical Coal Power Station Expansion - Mallee Biomass co-firing trials at Wallerawang Power Station - Strategic Planning for Delta Electricity energy portfolio

    • Utilities
    • 1 - 100 Employee
    • Operations Manager
      • 2005 - 2005

    • Australia
    • Construction
    • Project manager
      • 1998 - 2003

Education

  • University of Adelaide
    BE, Civil Engineering
    1993 - 1998
  • Melbourne Business School
    -

Community

You need to have a working account to view this content. Click here to join now