Christopher Foulks

Industrial Engineer at Greenfield Products, LLC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Jackson, Tennessee, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Bubba Manley

Mr Foulks is a pleasure to work with and has a vast knowledge of Pipe manufacturing process and the enter most workings of the machinery that produces the product.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • OHSA 30 hour Construction
    Marie Athey, OHST
    Feb, 2015
    - Nov, 2024

Experience

    • United States
    • Machinery Manufacturing
    • 1 - 100 Employee
    • Industrial Engineer
      • Apr 2020 - Present

      Working with GM on Continuous Improvements of the plant. Helping with 5S and Kaizens throughout the facility. Creating One Point Lessons on issues found and solved. Working with assembly lines on issues that arise. Helping departments address their needs whether it is working with Engineering to design fixtures needed or making sure they have all tools needed to complete their job.

    • Product Support Manager
      • Nov 2015 - Apr 2020

      With my current position I handle all warranty claims, making sure the claims are repaired, processed and paid in a timely manner. I work with third party vendors to troubleshoot, repair and install equipment. I work in the field helping troubleshoot issues. I help with installation of new equipment in the field. I work with quality and engineering departments on issues found with our equipment to help correct any issues that are found.

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Engineering Analyst II
      • Oct 2012 - Nov 2015

      I worked with Engineering Management to develop new projects, personally preparing specifications for each project assigned. I followed the project in its entirety, dealing with all aspects of communication with contractors including, project scheduling, daily field management, invoice tracking and payments. I also assist other project managers with large projects. I wrote specifications for the Engineering Manpower Contracts. Projects managed range from $1MUSD to $5 MUSD (construction of new buildings, purchasing and installation of new equipment)

    • Engineering Analyst
      • Mar 2010 - Oct 2012

      I worked with Engineering Management to develop new projects, personally preparing specifications for each project assigned. I followed the project in its entirety, dealing with all aspects of communication with contractors including, project scheduling, daily field management, invoice tracking and payments. I also assist other project managers with large projects. I also wrote specifications for the Engineering Manpower Contracts. Projects managed range from $30k to $1MUSD (Purchase and Installation of new equipment).

    • Engineering Planner
      • Nov 2006 - Mar 2010

      I worked with Engineering Management, Engineers, and Project Managers to develop schedules for all Engineering Projects and Installations. This included contractors and other Plant Departments. I also helped write specifications for equipment and manpower contracts. I also worked with the Project Managers during installations as a field supervisor.Tenaris bought Maverick Tube in October of 2006.

    • Oil and Gas
    • 1 - 100 Employee
    • Maintenance Planner
      • Nov 2004 - Nov 2006

      I worked with Maintenance Management and all other Plant Departments to plan PM’s and all other maintenance interventions. I helped implement Avantis (CMMS) in to the Plant. Once Avantis was implemented I created a Preventive Maintenance program for the Maintenance Department.

    • Maintenance
      • Jun 1995 - Nov 2004

      General Mill Maintenance – Rebuild gear boxes, changed out motors, rebuilt mill stands, etc. I also help with all Maintenance Projects including installations of new equipment (mechanical and electrical). I did PM’s on all mill equipment and cranes in the building. I operated forklifts, JLG’s overhead cranes, etc.

    • Oiler
      • Feb 1995 - Jun 1995

      I greased all plant equipment, maintained all hydraulic units. Helped maintenance with PM’s and general mill maintenance.

    • Shipper
      • Jul 1994 - Feb 1995

      I worked in shipping, loading trucks and rail cars with pipe. I also tallied pipe as it was being loaded onto trucks and rail cars and operated pipe loaders in the yard.

Education

  • Kennett High School
    Diploma
    1989 - 1993

Community

You need to have a working account to view this content. Click here to join now