Christian Sheaffer

Project Manager / Task Order Manager at KDG Construction Consulting
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Los Angeles Metropolitan Area, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Construction
    • 1 - 100 Employee
    • Project Manager / Task Order Manager
      • Jul 2017 - Present

      Los Angeles World Airports (LAWA)/(LAX) Landside Access Modernization Program (LAMP). LAMP is the largest capital improvement project in Los Angeles history. The program consist of 4 major projects; a two mile aerial Automated People Mover (APM), a mega Consolidated Rent-A-Car facility with direct access to the automatic people mover (ConRAC), an Inter-modal Transportation Facility (ITF), and various Roadway-Utility-Enabling projects (RUE). https://www.lawa.org/connectingLAX

    • Risk Mitigation and Claims Resolution
      • May 2017 - Jul 2017

      -Project: Los Angeles World Airports (LAWA)/(LAX)-Reviewed and evaluated Contractor potential claims and time impact analysis for merit. Developed response letters with corresponding back-up data.

    • Construction Manager
      • Apr 2016 - May 2017

      -Project Name: I-215 and Newport Interchange-Contract Type: Low Bid (Quantity)-Owner: Caltrans/Riverside County Transportation Department-Description: Reconstruction of an Existing Diamond Interchange into a Partial Cloverleaf Interchange Configuration. 3 Box Girder Bridges, Box Culvert, JPCP Roadway, Ground Anchor Wall, Retaining Walls, Power, Fiber Optics, Gas, Water, Storm Drain, Asphalt Roads, Concrete Flatwork, Lighting, Metering System, Traffic Signals, Overhead Sign Structures, Landscaping.

    • Assistant Project Manager
      • Oct 2012 - Apr 2016

      -Project Name: San Gabriel Trench, Heavy Rail Grade Separation-Contract Type: Low Bid (Lump Sum)-Owner: ACE, Alameda Corridor East Construction Authority-Description: 2.2 Mile Grade Separation Project, 5 Concrete Girder and Steel Girder Bridges, 2 Box Culverts, Water Channel Wash Reconstruction, Retaining Walls, DSM Soil Improvement, Over 5000 CIDH Piles, 675,000 CY of Mass Excavation, Soil Nails, 2700 Tie Backs, Power, Fiber Optics, Gas, Water, Sewer Siphon, Pump Station, Storm Drain, Road Improvements, Concrete Flatwork, Lighting, Traffic Signals, Landscaping, and Ballasted Track.

    • United States
    • Construction
    • 200 - 300 Employee
    • Quality Assurance
      • Feb 2012 - Aug 2012

      -Project Name: Orange Line Irving 3, Airport Light Rail Transit-Contract Type: Design Build-Owner: Dart, Dallas Area Rapid Transit-Description: 5.2 Miles Double Track Light Rail Transit, Overhead Catenary System, RailStations, Bridges, Airport Infrastructure, Power, Fiber Optics, Gas, Water, Sewer, StormDrain, Road Improvements, Concrete Flatwork, Lighting, Traffic Signals, Landscaping, Ballasted Track.http://www.dart.org/newsroom/imagelibrary.asp#orange

    • Utility Coordinator & Field Engineer
      • Sep 2010 - Feb 2012

      -Project Name: Salt Lake City Airport TRAX, Airport Light Rail Transit-Contract Type: Construction Manager/General Contractor (CMGC)-Owner: UTA, Utah Transit Authority-Description: 6 Mile Double Track Light Rail Transit, 6 Stations, Light Rail to Commuter Rail Transfer Station, Bridge Demolition, 3 Bridges with Expanded Polystyrene Abutments, Airport Welcome Center, Airport Infrastructure, Wetland Mitigation, Major Overhead to Under-Ground Utility Initiative, Power, Fiber Optics, Gas, Water, Sewer, Storm Drain, Roads, Flatwork, Lighting, Traffic Signals, Landscaping, Overhead Catenary System, Ballasted Track, Embedded Track, Direct Fixation Track.

    • Field Engineer
      • Jan 2010 - Sep 2010

      -Project Name: Jordan River Service Center, Light Rail Transit (Maintenance Facility for Light Rail)-Contract Type: Construction Manager/General Contractor (CMGC)-Owner: UTA, Utah Transit Authority-Description: Catenary System, Power, Fiber Optics, Gas, Water, Sewer, Storm Drain, Road Improvements, Building Retro-fit, Concrete Flatwork, Lighting, Traffic Signals, Landscaping, Ballasted Track, Maintenance Bays with Elevated Direct Fixation Track.

    • Field Engineer
      • Jan 2009 - Jan 2010

      -Project Name: West Valley TRAX, Light Rail Transit-Contract Type: Construction Manager/General Contractor (CMGC)-Owner: UTA, Utah Transit Authority-Description: 5 Mile Double Track Light Rail Transit, 4 Stations, 4 Steel Girder Bridges with Expanded Polystyrene, Abutments, Power, Fiber Optics, Gas, Water, Sewer, Storm Drain, Road Improvements, Concrete Flatwork, Lighting, Traffic Signals, Landscaping, Ballasted Track, Embedded Track, and Direct Fixation Track.Track.

    • United States
    • Construction
    • 300 - 400 Employee
    • Office Engineer (Intern)
      • Jun 2008 - Sep 2008

      -Project Name: Los Angeles Medical Center-Owner: Kaiser Permanente-Description: 800,000 Square Feet Hospital

Education

  • California State University, Chico
    Bachelor of Science - BS, Construction Management
    2003 - 2008

Community

You need to have a working account to view this content. Click here to join now