Christian Rombawa

Project Quantity Surveyor at Environmental Technology Company
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Analyze Data to Answer Questions
    Google
    Jun, 2023
    - Nov, 2024
  • Ask Questions to Make Data-Driven Decisions
    Google
    Jun, 2023
    - Nov, 2024
  • Data Analysis with R Programming
    Google
    Jun, 2023
    - Nov, 2024
  • Prepare Data for Exploration
    Google
    Jun, 2023
    - Nov, 2024
  • Process Data from Dirty to Clean
    Google
    Jun, 2023
    - Nov, 2024
  • Share Data Through the Art of Visualization
    Google
    Jun, 2023
    - Nov, 2024
  • Foundations: Data, Data, Everywhere
    Google
    May, 2023
    - Nov, 2024

Experience

    • Saudi Arabia
    • Environmental Services
    • 1 - 100 Employee
    • Project Quantity Surveyor
      • Nov 2021 - Present

      Project: Environment Rehabilitation Program Under UN Legislation for Indemnification - North Kuwait Excavation, Transportation and Remediation (NKETR Zone-2) Project Overview: 1. Excavate contaminated material and comply with Remediation Target Criteria (RTC) within excavations. 2. Identify and quantify as per site soil characterization the volumes of soil for Total Petroleum Hydrocarbon (TPH) n-hexane extractable material (HEM, analyzed by USEPA 9071B) ranges (from >1% to ≤ 5%, from >5% to ≤7%, and >7%) for review and approval by the Company. 3. Segregate soil based on level of contamination. 4. Carry out all necessary pre-treatment processes (including for water) as necessary based on the remediation method (physical and/or chemical treatment technologies and bioremediation). 5. Design and construct expansion to the existing NK landfill (as directed and approved by the Company). Landfill volume will depend on the volumes of tarry and burnt untreatable materials and the results of the bioremediation and treatment technologies Treatment Optimization Studies. 6. Non-treatable soil/material as deemed necessary (if designated and approved by the Company), shall be temporarily stockpiled, transported, and disposed of at the NK landfill expansion (waste disposal), or placed in a holding area for final disposal by Company. 7. Placement of treated soil in designated locations, excavated areas, or re-use as backfilling or cover material at the potential NK landfill expansion facility, at existing gatch pits, or other areas as directed by the Company. Show less

    • Project Quantity Surveyor
      • Feb 2017 - Nov 2021

      February 2017 to Present Project 1: Excavation and Transportation of Heavily Oil Contaminated Soil to Landfill in South East Kuwait Area and Site Preparation Works for The Remediation Technologies for Demonstration Project. Duties & Responsibilities:  Perform the tasks of a Civil Engineer cum Quantity Surveyor by studying all the drawings analytically, able to discern mistakes in layouts, markings, check overall construction plan of the project thoroughly.  Track changes to the design and or construction work and adjusting budget projections accordingly. Managing costs to make sure that the initial budget isn’t exceeded.  Study and prepare cost proposal and variation orders that are not available on the contract.  Makes regular visits to the construction site. These visits serve many purposes such as getting an actual feel for the progress of the project. Constant coordination with construction team at site for further changes of drawings or any obstruction that might result as additional works.  Prepare and arrange monthly payments and, at the end of a job, settling the final accounts.  Tracks and analyzes the project costs including budgets, commitments, actuals, accruals, and forecasts. Analysis includes forecast to budget and estimate, forecast to actuals, and contingency analysis. Project 2: Kuwait National Petroleum Company - ALZOUR New Refinery Project (Civil Works and Underground Piping) Duties & Responsibilities: • I perform the tasks of a Civil Engineer Quantity Surveyor by studying all the drawings analytically, I am able to discern mistakes in layouts, markings, check the plans’ discrepancies by comparing both structural and architectural plans and review the overall plan of the project thoroughly. • Prepare and monitor project cash flow forecasts. • Prepare Cost Summary Sheet of Budget to be approve by the Company. • Take site visits to establish nature of works, progress, updates and verify additional works. Show less

  • Sarh Attaqnia Construction
    • Riyadh, Saudi Arabia
    • Civil Engineer
      • Apr 2013 - Apr 2015

      Project: Al Jouf Elementary School & Dawadmi Mall Duties & Responsibilities:  Perform design calculations for structural steel, reinforced concrete, reinforced masonry, wood, light gage-metal, foundation structures using the latest Codes and Standards.  Assist the Lead Structural Engineer in developing project scopes, engineering estimates, capital cost estimates and developing repair methodologies.  Aid in the verification of structures by performing compliance inspections and tests. Resolve construction problems related to structural design.  Prepare shop drawings in accordance with the design that are inclusive with quotation. Show less

    • Civil Engineer
      • Apr 2010 - Apr 2012

      Project: One & Only Reethi Rah Resort Duties & Responsibilities:  Maintains project schedule by monitoring project progress, coordinating activities and resolving problems.  Explores methods to ensure that the project is carried out in the most economical and profitable way.  Confirms adherence to construction specifications and safety standards by monitoring project progress, inspecting construction site, verifying calculations and placements.  Coordinates the requisition, issuances and the timely delivery of required materials on site.  Cooperate and communicate effectively with resort director and project manager to provide assistance and technical support.  Prepare and disseminate all required documentation records such as status reports, punch lists describing work items to be done, sketches or work already completed and material requirement calculations.  Comply and health, safety & environmental rules and procedures to perform work in a manner that enhances the safety of the work environment.  Perform other responsibilities associated with this position as may be appropriate. Show less

    • Real Estate
    • 1 - 100 Employee
    • Civil Engineer
      • Apr 2007 - Mar 2010

      Project: Metro Gate San Jose Del Monte & Villa Caseres Estate Sta Rosa Duties & Responsibilities:  Conduct inspection and review on the quality of work to ensure conformity required in the specification and takes effective action to correct the differences.  Schedule of daily manpower activities, allocate works by giving priority to critical jobs and ensure what systematic procedures are allowed to assure completion of work on schedule.  Attend and participate coordination meeting to discuss and resolve work related activities, problems and conduct periodic meeting among subordinates with their works.  Analyse architectural and structural to determine the extent of work to done the proper sequence of operation and estimate manpower and materials.  Supervision during concreting works and to ensure that all contract specification standards were attained.  Evaluate the billings of all sub-contractors, quantify the structures what they have accomplished in site prior to their invoices. Show less

Education

  • Saint Louis College -City of San Fernando
    Bachelor of Science in Civil Engineering, Construction Engineering
    2000 - 2005

Community

You need to have a working account to view this content. Click here to join now