Christian Kellner

Vice President Operations at MiddleGround Capital
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Netherlands, NL
Languages
  • German Native or bilingual proficiency
  • English Full professional proficiency
  • Japanese Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Venture Capital and Private Equity Principals
    • 100 - 200 Employee
    • Vice President Operations
      • Jan 2023 - Present

    • Germany
    • Motor Vehicle Manufacturing
    • 700 & Above Employee
    • Senior manager supplier management
      • Aug 2020 - Jan 2023

      - Head of preventive supplier management and responsibility for methods/systems of the worldwide production sites for the powertrain - Securing parts supply to suppliers at risk of insolvency - Operating the data infrastructure to suppliers regarding order quantity and timing - Regular supplier evaluation and development - Securing product ramp-ups according to IATF16949 Successes: - Initiation of Corona special measures to ensure high part availability while globally disturbed supply chains Show less

    • Japan
    • Motor Vehicle Manufacturing
    • 500 - 600 Employee
    • Head of supplier management
      • May 2019 - Jul 2020

      - Responsibility for operational parts supply and quality from external suppliers- Securing material supply from more than 500 suppliers for the production plants in Japan- Focus: on-time delivery, high quality and low capital commitment- Annual material value several billion eurosSuccesses:- Reduction of import engine variance and therefore reduced working capital by 20 mio. euro

    • Head of international operations
      • Jan 2017 - Apr 2019

      - Head of ramp-up management, production, logistics for worldwide KD activities (Knock-Down)- Coordination of 13 KD production sites- Responsibility for worldwide production ramp-ups- Order management/central material supply with operational logistics handling - Operation of consolidation center for 4 PbP customer plants (Part-by-Part)Successes: - Capacity expansion of material supply -> Production increased by 30 % - Savings in rental costs of 3 million euros/a.- Reduction of logistics costs by 25 % Show less

    • Senior manager facility management
      • Apr 2015 - Dec 2016

      - Responsibility for planning/operation of technical building equipment- Repair and maintenance of infrastructure systems to ensure high system availability- Reduction of energy costs and planning of new systems Successes: - Reduction of CO2 pollution / energy costs by 3 million euros/a. through radical renewal of cooling and heating supply and construction of a 6MW combined heat and power plant- Outsourcing of services at a 20 % lower cost level

    • India
    • Motor Vehicle Manufacturing
    • 700 & Above Employee
    • Senior manager cabin production
      • May 2012 - Mar 2015

      - Management of cab production, including body shop, painting and assembly- Ensuring quality, production costs and on-time delivery of cabs- Establishing stable work processes for production - Rapid adjustment of output to changing customer requirements Successes: - Exceeding output by 20% compared with planned production capacity- Improving quality by 34% - Increasing productivity by 23% - Halving energy consumption and consumables

    • Manager transmission production
      • Mar 2010 - Apr 2012

      - Head of transmission production - Planning and realization of production facilities- Production of transmissions as part of product development - Recruitment and training of employees - Project leader for processes to found a new production plant Successes: - Establishment of "standardized work" as the basis for continuous improvement

    • Germany
    • Motor Vehicle Manufacturing
    • 700 & Above Employee
    • Manager lean production consulting
      • Jan 2006 - Feb 2010

      Consultant, trainer and coach for lean production Successes: - To eliminate costs at the Oye production site in Japan (small buses), space requirements at the Toyama site (large buses) were reduced by 25% and small buses were integrated in Toyama - Introduction of store floor management at the Wörth plant for cascaded management by means of KPIs down to the employee level as part of the policy deployment process - Productivity increase by 18 % at the Sindelfingen plant Consultant, trainer and coach for lean production Successes: - To eliminate costs at the Oye production site in Japan (small buses), space requirements at the Toyama site (large buses) were reduced by 25% and small buses were integrated in Toyama - Introduction of store floor management at the Wörth plant for cascaded management by means of KPIs down to the employee level as part of the policy deployment process - Productivity increase by 18 % at the Sindelfingen plant

    • Germany
    • Appliances, Electrical, and Electronics Manufacturing
    • 700 & Above Employee
    • Junior manager maintenance
      • Nov 1998 - Sep 2001

      - Head of the electrical workshop of a production plant for electronic components - 3-shift operation of all infrastructure systems within complex clean rooms environment for high system availability - Responsible electrical specialist - Electrical planning/implementation of new systems - Calibration of all measuring instruments for quality assurance Successes: - Certification according to DIN EN ISO 9001 - Head of the electrical workshop of a production plant for electronic components - 3-shift operation of all infrastructure systems within complex clean rooms environment for high system availability - Responsible electrical specialist - Electrical planning/implementation of new systems - Calibration of all measuring instruments for quality assurance Successes: - Certification according to DIN EN ISO 9001

    • Germany
    • Automation Machinery Manufacturing
    • 700 & Above Employee
    • Plant electrician in maintenance
      • Feb 1994 - Sep 1996

Education

  • Daimler, Stuttgart
    Certified Lean Production Expert
    2004 - 2005
  • Rosenheim Technical University of Applied Sciences
    Graduate in Business Administration - Tax, Auditing and Controlling, Business Administration and Management, General
    2001 - 2004
  • University of Adelaide
    2003 - 2003
  • Handwerkskammer and Innung Elektro- & Informationstechnik, Munich
    Master electrician
    1997 - 1998
  • German Armed Forces
    Higher education entrance qualification, Compulsory military service
    1997 - 1998
  • Technikerschule München
    State-certified electrical engineer, Energy & automation technology
    1995 - 1997
  • Siemens Professional Education
    Energy electronics technician
    1990 - 1994

Community

You need to have a working account to view this content. Click here to join now