Chris Wilkins

Superintendent at Cohn Construction Services
  • Claim this Profile
Contact Information
Location
Lexington County, South Carolina, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Superintendent
      • Aug 2017 - Present

    • United States
    • Construction
    • 700 & Above Employee
    • Mechanical Construction Field Engineer
      • Jan 2015 - Aug 2017

    • Mechanical Construction Field Engineer
      • Jan 2015 - Apr 2016

    • Business Consulting and Services
    • 1 - 100 Employee
    • Capstone Project
      • Jan 2014 - Dec 2014

      *Design and implement a prototype of a single point of connection for thermocouple and pressure line hookups*Reduced the amount of time to hook engine up to testing area by half, which will result in more production being tested on a daily basis *Design and implement a prototype of a single point of connection for thermocouple and pressure line hookups*Reduced the amount of time to hook engine up to testing area by half, which will result in more production being tested on a daily basis

    • Maintenance and Reliability Intern
      • May 2014 - Aug 2014

      Identified and resolved the cause of pump casing failures on water pumpsnecessary to run paper machine while saving company $7500 every six months* Designed and quoted a secondary containment area within EPA regulations that willbe used to store four three-phase transformers from possible environmentalcontainment and weather related damage* Created an Access database that will be implemented plant wide to record negativeevents associated with safety, delivery, environmental, equipment downtime* Assisted with performing Root Cause Analysis on failed bearings used on site* Interpreted Piping and Instrumentation Diagrams to gather inventory on instrumentsused on site to create backup inventory for critical parts; unexpected downtownwould cost plant $10,000 per hourCapstone Project

    • Germany
    • Think Tanks
    • 1 - 100 Employee
    • Manufacturing Intern
      • May 2011 - Aug 2011

      * Demonstrated critical thinking and problem solving skills to successfully complete projects within a designated budget and time frame* Studied the cooling time of post molded coils to give a consistent resistance measurement and accurate dimension; to pass inspection without cooling aids*Designed a FIFO rack design for the new closed loop Kanban pull system*Implemented a scoreboard in a certain production area that will be able to keep track of daily output performance * Demonstrated critical thinking and problem solving skills to successfully complete projects within a designated budget and time frame* Studied the cooling time of post molded coils to give a consistent resistance measurement and accurate dimension; to pass inspection without cooling aids*Designed a FIFO rack design for the new closed loop Kanban pull system*Implemented a scoreboard in a certain production area that will be able to keep track of daily output performance

Education

  • University of South Carolina-Columbia
    Bachelor of Engineering (BE), Mechanical Engineering
    2010 - 2014
  • University of South Carolina-Columbia
    Bachelor of Science, Mechanical Engineering
    2010 - 2014

Community

You need to have a working account to view this content. Click here to join now