Chris Wilkins
Superintendent at Cohn Construction Services- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
-
Superintendent
-
Aug 2017 - Present
-
-
-
Fluor Corporation
-
United States
-
Construction
-
700 & Above Employee
-
Mechanical Construction Field Engineer
-
Jan 2015 - Aug 2017
-
-
-
-
Mechanical Construction Field Engineer
-
Jan 2015 - Apr 2016
-
-
-
MTU
-
Business Consulting and Services
-
1 - 100 Employee
-
Capstone Project
-
Jan 2014 - Dec 2014
*Design and implement a prototype of a single point of connection for thermocouple and pressure line hookups*Reduced the amount of time to hook engine up to testing area by half, which will result in more production being tested on a daily basis *Design and implement a prototype of a single point of connection for thermocouple and pressure line hookups*Reduced the amount of time to hook engine up to testing area by half, which will result in more production being tested on a daily basis
-
-
-
-
Maintenance and Reliability Intern
-
May 2014 - Aug 2014
Identified and resolved the cause of pump casing failures on water pumpsnecessary to run paper machine while saving company $7500 every six months* Designed and quoted a secondary containment area within EPA regulations that willbe used to store four three-phase transformers from possible environmentalcontainment and weather related damage* Created an Access database that will be implemented plant wide to record negativeevents associated with safety, delivery, environmental, equipment downtime* Assisted with performing Root Cause Analysis on failed bearings used on site* Interpreted Piping and Instrumentation Diagrams to gather inventory on instrumentsused on site to create backup inventory for critical parts; unexpected downtownwould cost plant $10,000 per hourCapstone Project
-
-
-
Bosch
-
Germany
-
Think Tanks
-
1 - 100 Employee
-
Manufacturing Intern
-
May 2011 - Aug 2011
* Demonstrated critical thinking and problem solving skills to successfully complete projects within a designated budget and time frame* Studied the cooling time of post molded coils to give a consistent resistance measurement and accurate dimension; to pass inspection without cooling aids*Designed a FIFO rack design for the new closed loop Kanban pull system*Implemented a scoreboard in a certain production area that will be able to keep track of daily output performance * Demonstrated critical thinking and problem solving skills to successfully complete projects within a designated budget and time frame* Studied the cooling time of post molded coils to give a consistent resistance measurement and accurate dimension; to pass inspection without cooling aids*Designed a FIFO rack design for the new closed loop Kanban pull system*Implemented a scoreboard in a certain production area that will be able to keep track of daily output performance
-
-
Education
-
University of South Carolina-Columbia
Bachelor of Engineering (BE), Mechanical Engineering -
University of South Carolina-Columbia
Bachelor of Science, Mechanical Engineering