Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • United States
    • Architecture and Planning
    • 1 - 100 Employee
    • Architect
      • Oct 2018 - Present
    • Architecture and Planning
    • Sole Proprietor
      • Jan 2009 - Present

      Providing a helping hand to The Architectural Team, in Chelsea, Massachusetts on a variety of projects in AutoCAD & Revit. Construction Contract Representative for CO Architects, Los Angeles $93m Lab Building for BioMed Realty Trust Owner Representation, Construction Forensics and Envelope Design Consultation Services Providing a helping hand to The Architectural Team, in Chelsea, Massachusetts on a variety of projects in AutoCAD & Revit. Construction Contract Representative for CO Architects, Los Angeles $93m Lab Building for BioMed Realty Trust Owner Representation, Construction Forensics and Envelope Design Consultation Services

    • Architect
      • Mar 2011 - Sep 2018
    • United States
    • Architecture and Planning
    • 100 - 200 Employee
    • Senior Associate
      • Mar 2003 - Dec 2008

      AstraZenaca Hope Lodge Boston, Temporary housing for cancer patients receiving outpatient services at Boston area hospitals. Adaptive reuse/ new construction LEED Gold certified project. managed from project inception to construction completion. Sr Associate on The Clarendon mixed use development from project inception through 20% CD's Extensive involvement in community meetings, Boston Redevelopment Authority review process and Chapter 91 licensing. AstraZenaca Hope Lodge Boston, Temporary housing for cancer patients receiving outpatient services at Boston area hospitals. Adaptive reuse/ new construction LEED Gold certified project. managed from project inception to construction completion. Sr Associate on The Clarendon mixed use development from project inception through 20% CD's Extensive involvement in community meetings, Boston Redevelopment Authority review process and Chapter 91 licensing.

    • United Kingdom
    • Architecture and Planning
    • 1 - 100 Employee
    • Associate
      • May 2001 - Oct 2002

      Extensive client contact, project management & construction contract administration Construction Administration Brooksby Village Assisted Living Project, Extensive client contact, project management & construction contract administration Construction Administration Brooksby Village Assisted Living Project,

    • United States
    • Architecture and Planning
    • 1 - 100 Employee
    • Associate Principal
      • Sep 1999 - May 2001

      Extensive client contact, project management & construction contract administration Manage fast-track Construction Administration of $14m adaptive reuse residential development (117 units) Manage Design Development & CD’s for $5m private K-3 school renovation & expansion (60,000 sf) Extensive client contact, project management & construction contract administration Manage fast-track Construction Administration of $14m adaptive reuse residential development (117 units) Manage Design Development & CD’s for $5m private K-3 school renovation & expansion (60,000 sf)

    • Senior Project Manager
      • Nov 1989 - Aug 1999

      Manage fast-track design development of Rockport Shoes concept stores, Newbury Street & Santa Monica Design & manage flagship store developments for Talbots, San Francisco & Seattle Administer project development from design through close-out for major up- scale clothing retailer Coordinate CAD system development for efficient document delivery creating office wide standards Develop project management tools and document tracking system for Macintosh… Show more Manage fast-track design development of Rockport Shoes concept stores, Newbury Street & Santa Monica Design & manage flagship store developments for Talbots, San Francisco & Seattle Administer project development from design through close-out for major up- scale clothing retailer Coordinate CAD system development for efficient document delivery creating office wide standards Develop project management tools and document tracking system for Macintosh & NT Networks Mentor IDP program participants, seminars on Specifications and Field Surveying Direct staff of 12 designers & drafters Maintain most profitable client for 10 years Client contact & presentation to boards, departments & client’s representatives for most projects Show less Manage fast-track design development of Rockport Shoes concept stores, Newbury Street & Santa Monica Design & manage flagship store developments for Talbots, San Francisco & Seattle Administer project development from design through close-out for major up- scale clothing retailer Coordinate CAD system development for efficient document delivery creating office wide standards Develop project management tools and document tracking system for Macintosh… Show more Manage fast-track design development of Rockport Shoes concept stores, Newbury Street & Santa Monica Design & manage flagship store developments for Talbots, San Francisco & Seattle Administer project development from design through close-out for major up- scale clothing retailer Coordinate CAD system development for efficient document delivery creating office wide standards Develop project management tools and document tracking system for Macintosh & NT Networks Mentor IDP program participants, seminars on Specifications and Field Surveying Direct staff of 12 designers & drafters Maintain most profitable client for 10 years Client contact & presentation to boards, departments & client’s representatives for most projects Show less

    • Associate
      • Mar 1985 - Oct 1989

      Managed Office Reebok Distribution Center, Food Service & Outlet Store, Stoughton, MA Several Outlet Stores for Reebok Managed Office Reebok Distribution Center, Food Service & Outlet Store, Stoughton, MA Several Outlet Stores for Reebok

    • Project Manager
      • May 1980 - Feb 1985

      Crown & Eagle Mill Adaptive Reuse for Uxbridge Millville Housing Authority, 1985 NERC AIA Award winner Blackstone Falls Hydro Electric Project, Central Falls, RI Essex Street Housing, Lawrence, MA Marble Street Housing, Worcester, MA Crown & Eagle Mill Adaptive Reuse for Uxbridge Millville Housing Authority, 1985 NERC AIA Award winner Blackstone Falls Hydro Electric Project, Central Falls, RI Essex Street Housing, Lawrence, MA Marble Street Housing, Worcester, MA

    • Drafter/Designer
      • May 1979 - Apr 1980
    • Designer
      • Mar 1977 - Apr 1979

      Developed prefabricated light gage metal framing for residential projects in the USA and Saudi Arabia. Developed prefabricated light gage metal framing for residential projects in the USA and Saudi Arabia.

    • United States
    • Civil Engineering
    • 1 - 100 Employee
    • Designer
      • Oct 1977 - Nov 1978

      Architectural designer for structural engineering firm. Architectural designer for structural engineering firm.

    • Financial Services
    • 1 - 100 Employee
    • Drafter
      • Sep 1972 - Aug 1976

      Worked for various architects while attending UCT. Designed single family residences for several clients in the Cape Town area. Worked for various architects while attending UCT. Designed single family residences for several clients in the Cape Town area.

    • Shop drawings
      • Sep 1971 - Mar 1972

      Worked on laboratory buildings & Sears Tower Worked on laboratory buildings & Sears Tower

Education

  • University of Cape Town
    Architecture
    1973 - 1976
  • Boston Architectural Center
    Architecture
    1978 - 1982
  • Illinois Institute of Technology
    Architecture & Design
    1970 - 1971

Community

You need to have a working account to view this content. Click here to join now