Chris Peralez

Project Superintendent at Allegiant Industrial
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Brownsville, Texas, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Construction
    • 1 - 100 Employee
    • Project Superintendent
      • Apr 2022 - Present

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Structural Superintendent/Structural field support Engineer
      • Apr 2019 - Apr 2022

      Iron Superintendent for a large green field 980 MW combined cycle power project. Responsible for all structural steel and boiler maker activities required for the installation of two Nooter Ericson HRSGs, two Mitsubishi gas turbines, a Toshiba steam turbine, and interconnecting pipe racks. Additional responsibilities in the erection of the Mitsubishi filter houses and iso-phase buss duct. Instrumental in recruitment of competent craft workers and field supervision. Responsible for self-perform activities including safety, quality, engineering coordination, cost and schedule. Participated in front end planning, constructability and material sequencing meetings prior to mobilization. Show less

    • Structural Lead General Foreman
      • Dec 2017 - Apr 2019

      Lead Structural General Foreman for a large green field 980 MW combined cycle power project. Responsible for all structural steel and boiler maker activities required for the installation of two Mitsubishi gas turbines, a Toshiba steam turbine, interconnecting pipe racks, the recovery and completion of two Nooter Ericson HRSGs. Instrumental in recruitment of competent craft workers and supervision. Responsible for self-perform activities including safety, quality, engineering coordination, cost and schedule. Project included significant environmental aspects including scope within the Corp of Engineers jurisdiction of the Mississippi river and the existing operating Little Gypsy Power Station, and the emergency fast track demolition and rebuild of a filter house following a fire. Show less

    • United States
    • Construction
    • 700 & Above Employee
    • Structural Lead General Foreman
      • Mar 2015 - Dec 2017

      Oversee building and erecting 8 TECHNIP heaters. Erection of heaters, structural steel, crane and rigging operations and cross over piping installation. Responsibilities include scheduling, planning and executing strategies for maximum performance, efficient project management and organization, supervises construction teams in execution of work scope, order placement, receipt, and distribution of material. Enforces all safety, environmental and industry standards. Interprets plans, blueprints and sketches of proposed structures, prepares reports on project time, equipment, materials and progress. Reviews work of skilled tradesman and equipment operators to ensure quality of finished product. Show less

    • General Foreman
      • Feb 2014 - Feb 2015

      Overseeing, installation and erection of 4 BIH air heaters. Including erecting modules, heater boxes and platforms of steel and stacks. Furthermore, aided in fabrication, weld out, and installation of 304H large bore stainless piping system. Responsibilities include scheduling, planning and executing strategies for maximum performance, and safety.