Chris Graham

ToolRoom Manager at Burgaflex North America, LLC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Truck Transportation
    • 1 - 100 Employee
    • ToolRoom Manager
      • Jun 2018 - Present

      Responsible for all tooling, for all machines in all 4 plants Responsible for all tooling, for all machines in all 4 plants

  • Burgaflex
    • Fenton, Michigan
    • Quality/Bending Supervisor
      • Jun 2014 - Present

      Responsible for prototype and production of cnc and universal bending departments, and Quality supervisor for all of plant 2 Responsible for prototype and production of cnc and universal bending departments, and Quality supervisor for all of plant 2

    • Prototype Engineer
      • Jun 2011 - May 2014

      Prototype Engineer responsible for prototype, PPAP and production launch for a variety of automotive tube and hose assemblies. Prototype Engineer responsible for prototype, PPAP and production launch for a variety of automotive tube and hose assemblies.

    • OUT OF A JOB
      • Apr 2011 - Jun 2011

      Company relocating to Indiana and I choose not to relocate Company relocating to Indiana and I choose not to relocate

    • Prototype Supervisor
      • Nov 1994 - Apr 2011

      Interpretation of internal an external blueprints,R&D, jounce studies, fabrication of fully functional 1 off prototypes for development and design verification.Fabrication consisting of developing tube data from xyz coordinates,reverse engineering,cutoff and bandsaws,endforming and endrolling,cnc and handbending,hand brazing aluminum and steel valves,blocks,welding, radial and split die crimping,bridgeport,lathe, surface grinder,drill presses,cmm,micrometers,calipers,optical comparator,fork lift driver,car hoist,on site routings Show less

    • Plant Superintendant
      • Nov 1983 - Nov 1994

      general production,setup,prototype,tool control,quality control,braze technician,production supervisor,shift superintendent,plant relocated to Ohio in 1991, accepted a relocation package to train and continue aluminum operations as a supervisor in a steel plant with a unionized work force,worked through a strike.In 1994 I accepted a job offer with relocation back to Mich. to setup and run the prototype shop for Preferred Technical Group general production,setup,prototype,tool control,quality control,braze technician,production supervisor,shift superintendent,plant relocated to Ohio in 1991, accepted a relocation package to train and continue aluminum operations as a supervisor in a steel plant with a unionized work force,worked through a strike.In 1994 I accepted a job offer with relocation back to Mich. to setup and run the prototype shop for Preferred Technical Group

Education

  • Lakeville Memorial High School
    graduate
    1980 - 1983

Community

You need to have a working account to view this content. Click here to join now