Chris Fernando

Office Engineer (Airport Metro Connector) at KDG Construction Consulting
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Los Angeles, California, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Marcy Szarama

Chris has a great team player attitude and pays attention to necessary details to ensure success of the project.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Construction
    • 1 - 100 Employee
    • Office Engineer (Airport Metro Connector)
      • Sep 2019 - Present

      Assisted with design and constructability reviews of 30%, 60% and 100% design-bid-build packages in conjunction with solicitation of bids from general contractors for the Crenshaw/Green Line-LAWA Automated People Mover (APM) multi modal station. Assisted with design package review and comment resolution process between owner and designer-of-record. Received, distributed and responded to submittals and RFIs from various third-party agencies and designers-of-record coordinating design and construction of two adjacent projects (LAWA APM and Metro Crenshaw/LAX projects). Maintained current status/red-line drawings and associated tracking logs of project documentation. changes and updates. Show less

    • United States
    • Construction
    • 100 - 200 Employee
    • Office Engineer (Purple Line Extension Section 3)
      • Apr 2019 - Sep 2019

      Construction management and oversight, for Metro, of advanced utilities relocation for future Westwood/UCLA Station for the Purple Line Extension. Pre-construction and construction activities oversight and management for Westwood/UCLA and Westwood/VA stations including all stations and system elements for $1.3B stations and systems design-build contract for Westside Purple Line Extension- Section 3. Construction management and oversight, for Metro, of advanced utilities relocation for future Westwood/UCLA Station for the Purple Line Extension. Pre-construction and construction activities oversight and management for Westwood/UCLA and Westwood/VA stations including all stations and system elements for $1.3B stations and systems design-build contract for Westside Purple Line Extension- Section 3.

    • United States
    • Architecture and Planning
    • 1 - 100 Employee
    • Office Engineer (Southwestern Yard Operations & Maintenance Facility - Crenshaw/LAX Light Rail)
      • Jan 2016 - Apr 2019

      Project/contract documentation review for $172 Million design-build light rail maintenance facility being constructed under the Crenshaw/LAX Transit Corridor project for the LA County Metropolitan Transportation Authority. Review of design-builder submitted design packages and design RFIs, progressing design of the light rail maintenance facility. Review and response, based on technical and contractual merit, to Contractor Requests for Change in accordance with design-build contract, project definition documents and Metro Rail Design Criteria. Coordination with third party agencies including Los Angeles World Airports planned Automated People Mover project. Coordination with mainline design-builder of coordination activities related to construction of Crenshaw/LAX transit project. Show less

    • United States
    • Civil Engineering
    • 700 & Above Employee
    • Office Engineering Coordinator (Operations & Maintenance Facility-Expo 2 Light Rail Transit Project)
      • Apr 2013 - Jan 2016

      Performed preliminary over-the-shoulder reviews of contractor's submittals to ensure conformance to contract documents. Assisted with in-house and contractor document control procedure set-up including submittal, RFI and Change Notice transmittal procedure utilizing Primavera Contract Manager and Sharepoint software systems. Created required submittal tracking matrix as part of project design review and start-up. Performed preliminary over-the-shoulder reviews of contractor's submittals to ensure conformance to contract documents. Assisted with in-house and contractor document control procedure set-up including submittal, RFI and Change Notice transmittal procedure utilizing Primavera Contract Manager and Sharepoint software systems. Created required submittal tracking matrix as part of project design review and start-up.

    • United States
    • Business Consulting and Services
    • 700 & Above Employee
    • Project Coordinator/Office Engineer (Mid-City/Expo Light Rail Transit Project)
      • Jan 2008 - Apr 2013

      Established and maintained field office recording processes of RFI’s, submittals and project correspondence as related to project contract documents. Maintained field office current status design drawings, including temporary traffic control drawings, for all segments, work packages and phases of field construction activities. Maintained field office files and logs relating to daily inspection reports and time and material documentation. Performed periodic progress checks on contractor’s civil, structural, track work and train control & communication as-built drawings to ensure proper RFI, submittal and change order red-lines/mark-ups. Updated weekly construction progress report covering all construction related activities for Resident Engineer/Construction Manager. Provided quality oversight inspection and daily inspection reports covering various aspects of construction activities. Assisted with submittal and RFI review process to ensure compliance with project contract documents for Venice/Robertson aerial structure, Farmdale station traction power & communications, Culver City bike path and LAUSD Auxiliary Parking Facility. Managed project closeout process including submittal and review of as-built drawings, punch list updates, O&M data acceptance, warranty issues and final client acceptance. Show less

  • Bovis Lend Lease
    • Greater Los Angeles Area
    • Document Control Clerk
      • Oct 2004 - Dec 2007

      Ensured timely and accurate processing and archiving of plans, submittals, RFI’s, change orders and allowance orders relating to construction or renovation of Los Angeles City Fire Department fire stations under the City of Los Angeles Buerau of Engineering fire facilities bond program. Ensured timely and accurate processing and archiving of plans, submittals, RFI’s, change orders and allowance orders relating to construction or renovation of Los Angeles City Fire Department fire stations under the City of Los Angeles Buerau of Engineering fire facilities bond program.

Education

  • UCLA Extension
    Construction Management
    2015 - 2017
  • Los Angeles City College
    Technical Diploma/Certificate

Community

You need to have a working account to view this content. Click here to join now