Chris DeWall, P.E.

Associate Director at Ulteig
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Engineering Services
    • 700 & Above Employee
    • Associate Director
      • Jan 2020 - Present

    • Technical Manager
      • Sep 2014 - Dec 2019

    • Substation Engineer
      • Jun 2014 - Aug 2014

    • Utilities
    • 700 & Above Employee
    • Substation Engineer
      • Dec 2011 - May 2014

      Create scope documents and cost estimates for proposed substation construction projects  Develop electrical and physical designs from the project scope and develop construction drawings  Responsible for reserving stock material and specifying and ordering non-stock material for construction projects  Provide engineering support to substation construction and substation maintenance personnel Create scope documents and cost estimates for proposed substation construction projects  Develop electrical and physical designs from the project scope and develop construction drawings  Responsible for reserving stock material and specifying and ordering non-stock material for construction projects  Provide engineering support to substation construction and substation maintenance personnel

    • United States
    • Utilities
    • 700 & Above Employee
    • Operating Engineer
      • May 2010 - Nov 2011

      Provided engineering support and training for the control center and distribution equipment operators Developed solutions to voltage and equipment overload issues during extreme weather events and abnormal system configurations Approved switching procedures for isolation of energized equipment and commissioning of new distribution equipment

    • Distribution Capacity Planner
      • May 2008 - Apr 2010

      Created annual load forecasts and identified system overloads and contingency risks from the forecasted load Developed mitigations to resolve identified system risks Worked with substation construction, distribution design, and transmission planning to design and prepare projects for constructionPerformed long range capacity planning studies to determine the weakest areas of the system and then developed plans to strengthen these areas

Education

  • The University of North Dakota
    Bachelor of Science (BS), Electrical Engineering
    2003 - 2008

Community

You need to have a working account to view this content. Click here to join now