Chris Austin

Rope Access Plater at Altitude Select
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Leeds, England, United Kingdom, GB

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Chris Adamson

Chris is a very pleasant person and nothing is to much trouble. He will always help if he can. He approaches work in a very positive and safe manner. He is very competent at his job and is always punctual and well presented. The standard of Chris's work is always of a very high standard. I am sure Chris will be an asset to any company for some time to come.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Staffing and Recruiting
    • 1 - 100 Employee
    • Rope Access Plater
      • Nov 2021 - Present

      Various scopes on Southern North Sea Platforms Various scopes on Southern North Sea Platforms

    • United Kingdom
    • Oil and Gas
    • 1 - 100 Employee
    • Rope Access Plater
      • Jun 2021 - Jul 2021

      ~ Conductor guide repairs on Ninian Central platform ~ Conductor guide repairs on Ninian Central platform

    • Rope Access Plater
      • Nov 2020 - May 2021

      Sean P platform~ Caison + sea water pump repairsRavenspurn North~Installation of gas wall Sean P platform~ Caison + sea water pump repairsRavenspurn North~Installation of gas wall

    • Netherlands
    • Mechanical Or Industrial Engineering
    • 700 & Above Employee
    • Rope Access Plater
      • Aug 2020 - Sep 2020

      Rough Field Platform~Deluge system maintenance/refit

    • Rope Access Plater
      • Jul 2020 - Jul 2020

      Scott Platform ~Dropped object campaign

    • Real Estate
    • 1 - 100 Employee
    • Furloughed due to Covid 19
      • Apr 2020 - Jun 2020

    • United Kingdom
    • Oil & Energy
    • 1 - 100 Employee
    • Rope Acces Plater
      • Aug 2019 - Mar 2020

      ~Cups campaign

    • Rope Acces Plater
      • Jul 2019 - Aug 2019

      Audrey Alpha (decomission)~Removal of pipe work under deck~Fitting of scaffold starter brackets~Diamond core drilling of jacket legs for lifting pins~Detachment of caisons

    • Rope Access Plater
      • Jun 2019 - Jun 2019

      Ravenspurn North Platform~Removal and reinstatement of pipesupports Ravenspurn North Platform~Removal and reinstatement of pipesupports

    • Rope Access Plater
      • Mar 2019 - May 2019

      Brent Charlie Platform~Potential Dropped Object campaign

    • Rope Access Plater
      • Feb 2019 - Mar 2019

      Scott Platform ~Gratings campaign

    • Norway
    • Oil and Gas
    • 700 & Above Employee
    • Structural Foreman
      • Mar 2018 - Dec 2018

      ~ Plan and manage work scopes~ assign jobs to workforce~ complete time sheets~ ordering of materials

    • Chargehand Plater
      • Jul 2017 - Mar 2018

      ~ Mariner Project.Assist formen in supervision and planning of work scopes. Assist Platers in performing their duties. Assist in preparing work schedules and determining materials and equipment required. Ensures Platers are working in a safe and productive manner

    • United Kingdom
    • Oil and Gas
    • 1 - 100 Employee
    • Plater
      • Feb 2017 - Jun 2017

      ~Various shutdown scopes ~Various shutdown scopes

    • Offshore Plater
      • Jun 2014 - Feb 2017

      Flyndre/Cawdor field development project on the Clyde platform.~ Fitting structural trusses to support new gas reception module.~ Installation of pipe supports and tie ins.~ Fitting of slump oil, HP/LP flare and hazardous drains pipe work to specifications. ~ various deck and bulk head penetrations.~ Performing authority and level 1 authorised gas tester. Flyndre/Cawdor field development project on the Clyde platform.~ Fitting structural trusses to support new gas reception module.~ Installation of pipe supports and tie ins.~ Fitting of slump oil, HP/LP flare and hazardous drains pipe work to specifications. ~ various deck and bulk head penetrations.~ Performing authority and level 1 authorised gas tester.

    • United Kingdom
    • Travel Arrangements
    • 1 - 100 Employee
    • Backpacking
      • Jan 2014 - Jun 2014

      During this time I took a career break to fulfil travel goals. During this time I took a career break to fulfil travel goals.

    • France
    • Recreational Facilities and Services
    • Offshore Plater
      • Aug 2013 - Jan 2014

      Kinnoull Hookup Project/Andrew area development on the Andrew platform.~Instalation and fabrication of structural steel, pipe supports and various tie ins.~Valve replacement campaign Kinnoull Hookup Project/Andrew area development on the Andrew platform.~Instalation and fabrication of structural steel, pipe supports and various tie ins.~Valve replacement campaign

    • Plater
      • Dec 2011 - Jul 2013

      ~Fabrication and installation of structural steel and gantries for the renewal of unit 2 precipitators at Lynemouth power station. ~Repairs and re-plating of benzene tower and primary heater at Valero Oil refinery, Pembroke.~Construction and commissioning of bio ethanol plant at Vivergo Fuels, Salt End.~Repair work to A5 reformer and re-plating of acetic acid drums on BP-Salt End. ~Fabrication and installation of structural steel and gantries for the renewal of unit 2 precipitators at Lynemouth power station. ~Repairs and re-plating of benzene tower and primary heater at Valero Oil refinery, Pembroke.~Construction and commissioning of bio ethanol plant at Vivergo Fuels, Salt End.~Repair work to A5 reformer and re-plating of acetic acid drums on BP-Salt End.

    • Australia
    • Construction
    • 700 & Above Employee
    • Boilermaker
      • Jun 2011 - Nov 2011

      ~Site Maintenance and Shutdown work at BP Bulwer Island. ~Fabrication and Installation of structural steel for a waste incinerator plant on Mclay Island.~Site maintenance and conveyor fabrication/installation at Incitec Pivot.~ Fabrication of stainless steel inlet/outlet doors for a hydro power dam-workshop based. Various heavy fabrications (work shop based) ~Site Maintenance and Shutdown work at BP Bulwer Island. ~Fabrication and Installation of structural steel for a waste incinerator plant on Mclay Island.~Site maintenance and conveyor fabrication/installation at Incitec Pivot.~ Fabrication of stainless steel inlet/outlet doors for a hydro power dam-workshop based. Various heavy fabrications (work shop based)

Education

  • St Wilfrids High School
    10 GCSE's @ A-B and 4 A levels, Physics, Chemistry, Biology, Sports science
    1997 - 2004
  • Pheonix Training
    IOSH-SMTD level 4, SMTD level1, management
    -

Community

You need to have a working account to view this content. Click here to join now