Ching-Ting Liu

Senior Engineer at CECI ENGINEERING CONSULTANTS, INC. TAIWAN
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Taipei City, Taipei City, Taiwan, TW

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • 水利工程技師
    行政院公共工程委員會
    Apr, 2015
    - Oct, 2024
  •  營造業甲種職業安全衛生業務主管結業證書
    台北市政府
    Apr, 2015
    - Oct, 2024
  •  採購專業人員基礎訓練證書
    行政院公共工程委員會
    Aug, 2014
    - Oct, 2024

Experience

    • Taiwan
    • Civil Engineering
    • 1 - 100 Employee
    • Senior Engineer
      • Aug 2013 - Present

      As a senior engineer specializing in offshore wind farms, subsea cables and subsea pipelines related to project management, planning, design, certificate and supervision services. Project Management (1) Coastal utilization management report for offshore wind farm projects. (2) Feasibility Studies for offshore wind farm projects, including fixed and floating. (3) Site Applications for offshore wind farm projects, including fixed and floating. Planning (1) Infrastructure programs related to floating foundation and underwater survey for offshore wind farm strategy phase 3 (Zonal Development). (2) Coastal utilization management reports, electrical enterprise report and construction permit report. (3) Selection screen reports related to project schedule, T&I, O&M planning, AEP assistance and developing planning. (4) Feasibility study reports related to project schedule, site investigation, AEP assistance, T&I, O&M planning and risk assessment. (5) EPC Proposal related to T&I, O&M planning and risk assessment for TPC's First Phase Offshore Wind Farm Project. (6) Assessment of appropriate sites for offshore wind farm development in Taiwan. Design (1) Detailed design work related to transition joint bay for TPC’s First Phase Offshore Wind Farm Project. (2) Subsea cable basic design, Invitation to Tender (ITT) documents preparation and clarification assistance related to engineering requirements for Formosa I Offshore Wind Farm (Phase I & II). (3) Technical review related to site investigation reports, method statement of met mast and subsea cables. Certificate (1) Review and check related to environmental conditions of design basis, GIR, geotechnical design and pile driveability for offshore wind farm PE stamp project. (2) A hydraulic PE stamp for TPC's 161kV electrical power cable project. Supervision (1) Geophysical survey supervision. (2) Construction supervision of met mast. (3) Subsea cable burial for the TPC's 161kV electrical power cable Project. Show less

    • Engineer
      • Feb 2011 - Aug 2013

Education

  • 英國伯明罕大學
    MSc, Construction Management
    2009 - 2010
  • National Cheng Kung University
    Bachelor's degree, Hydraulic and Ocean Engineering
    2003 - 2007

Community

You need to have a working account to view this content. Click here to join now