Chin Ling
Senior Civil Engineer at Norton Gold Fields Pty Ltd- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Native or bilingual proficiency
-
Chinese -
Topline Score
Bio
Experience
-
Norton Gold Fields Pty Ltd
-
Australia
-
Mining
-
200 - 300 Employee
-
Senior Civil Engineer
-
Jul 2021 - Present
-
-
-
Mondium
-
Australia
-
Construction
-
1 - 100 Employee
-
Senior Project Engineer
-
Feb 2020 - Jun 2021
-
-
-
Georgiou
-
Australia
-
Construction
-
700 & Above Employee
-
Project Engineer
-
Apr 2019 - Feb 2020
-
-
-
Civmec
-
Australia
-
Construction
-
700 & Above Employee
-
Senior Project Engineer
-
Nov 2017 - Mar 2019
EPC Specify on detailed engineering design, procurement, construction, commissioning, completion of Process Plant Facility including: Crushing, Ore Storage, SAG & Ball Mill Grinding, Leach & Adsorption, Elution, Gold Room, Reagents, Tailings Disposal and Process Control System.
-
-
Project Engineer
-
Jun 2017 - Nov 2017
• Preparation for mobilisation, establish, maintain and operation of construction works.• Preparation of Documentation and Deliverable, Project Execution Plan (PEP), Schedule, Forecast Manning, Construction Safety Plan, Monthly Payment Claim submission, RFI, ITP, MDR’s• Undertaking task risk assessment including preparation of Safe Work Method Statement; Tilt Up Panel Installation.• Routine inspection of the site works to maintain safe working condition at all times.• Provision in planning, scheduling, cost control, business administration, employee management, Quality Assurance (QA), Quality Control (QC)
-
-
-
Catalpa Group
-
Australia
-
Construction
-
1 - 100 Employee
-
Site Civil Engineer
-
Jan 2017 - Jun 2017
• Managing parts of construction projects, overseeing construction work, undertaking surveys, setting out sites and organise facilities, managing sub-contractor and survey team, supervising contracted staff, ensuring projects meet agreed specifications, budgets or timescales, liaising with clients, subcontractors and other professional staff, preparing and submitting ITP’s, FIC’s, MDR’s and all document control duties, implementing and managing quality management system, checking and preparing site reports, designs and drawings, providing technical advice, identifying variations and presenting to be commercial team, assisting commercial team in quotation and tenders.
-
-
-
-
SURVEY ENGINEER/ REVIT MODELLER
-
Jun 2015 - Jan 2017
• Site set-out on concrete structures and non-structural elements such as: precast tilt-up panels, bubble decks formwork, in-situ columns, intertenancy wall and others where the critical dimension is essential to achieve.• Coordinate in between various disciplines such as structural engineering, MEP, fire services and contractor to minimise interface issues.• Identify the fire compartment types and use speed panel and other equivalent industrial products to achieve the fire rating requirements.• Acoustic design in between intertenancy wall, corridor wall and common wall in order to comply BCA spec.• Ceiling design at various zone such as fire escape area, residential area, common area and other special performance ceiling insulation where require.• Others non-structural elements design such as plenum design, substation wall, window sub frame, automatic door, cavity slider door, cabinets, stone top, splashbacks, mirror, feature wall cladding, skylight and others. • Always seeking alternative different construction methodology and using alternative industrial products to speed up construction progress and economic installation onsite.
-
-
-
NRW Civil & Mining
-
Australia
-
Mining
-
400 - 500 Employee
-
Project Engineer
-
Jun 2014 - Dec 2014
Contract Specification for concrete works and underground services; (50,000m3 concrete, 300,000m3 structural fill, 15KM Buried HDPE Pipe) $222MillionThe contract works includes the consContract Specification for concrete works and underground services; (50,000m3 concrete, 300,000m3 structural fill, 15KM Buried HDPE Pipe) $222MillionThe contract works includes the construction of concrete structures and underground services with following facility: Primary & Secondary Crushing 1, 2 & 3, Overland Conveyor & Transfer Station, Crushed Ore Stockpile Feed Conveyor, Crushed Ore Stockpile, Wet Scrubbing & Screening, Tertiary Crushing, Stockyard, Train Loadout, Plant Power Supply, Raw/Process/ Potable/Plant Water Systems, Tailings Storage & Distribution.
-
-
-
DTMT Construction - Australia
-
Australia
-
Construction
-
1 - 100 Employee
-
ASSISTANT AREA MANAGER
-
Mar 2012 - Feb 2014
Contract Specification for Civil and Earthworks, CD6/7 and 3 nos Stockyard Facility; (24,500m3 concrete, 3,500t steel) 242Million • Reporting to the managing Director, responsible for helping to achieve the company’s turnovers and profit targets by ensuring that jobs area manufactured correctly and cost effectively.• Capacity planning, scheduling of workload (Direct and Indirect), production control, monitor and review production progress against deadline targets to ensure on time delivery, adjust the production schedule as require and communication any change to delivery date with the client accordingly.• Ensure that all production related activity is time and cost efficient/ effective. • Ensure all plant and equipment is in well maintained, repaired and optimise the performance. • Monitoring production activity to ensure that appropriate manufacturing methods (incl subcontractor) are sufficient due care in order to meet the client quality specifications.• Monitor, review and address Engineers under performance, liaising with the Managing Director and maintaining appropriate records in accordance with company procedures as required.• Address any staff discipline or grievance issue, maintaining appropriate records in accordance with company procedures.• Monitor and manage production KPI’s to achieve the company’s target of 95%• Control all associated operational and manufacturing cost according to the prevailing annual budget forest/EOM Revenue Reporting
-
-
SNR PROJECT ENGINEER
-
Apr 2012 - Mar 2013
Contract Specification for Civil and Earthworks, 4 nos Stockyard Facility; (54,300m3 concrete, 8,300t steel) 78.24Million • As Snr Project Engineer is responsible to the Project Manager and shall oversee overall project cost & schedule control, contract management & administration, coordinate & reporting, construction & commissioning, material data collation in accordance to quality assurance controls. • Demonstrated a consistently approach to increased production levels and efficient work processes by identifying opportunities for improvement and submitting ideas to superiors. • Assist the areas manager with developing and maintaining overall project schedule, budges and target deliverable. Monitoring of earned value (EV) measure, total cost project, completion project forecast, participated in budgeting and preparation of cost control reports. • Prepared client/management analytically and narrative reports in accordance with project, company and client requirements highlighting overall achievement and areas of concerns.
-
-
PROJECT ENGINEER
-
Jun 2011 - Apr 2012
Contract Specification for Civil and Earthworks, Port Ore Handling - Finucane; (10,800m3 concrete, 1,350t steel) 50.7Million • Manage the weekly and monthly project reporting, and accommodation forecasting special working at the Port Hedland Region. • Resolve interface issue between areas manager and contractors. • Assist with the management of contract packages and claims assessments. • Monitor the quality of output, and ensuring that is aligned with the needs of the project, the company objectives and the requirements of the clients.
-
-
-
DTMT Construction - Australia
-
Australia
-
Construction
-
1 - 100 Employee
-
PROJECT ENGINEER – SCHEDULER/PLANNER
-
Oct 2009 - Mar 2011
Concrete Installation Work, Ball Mill Area; (Total 6 lines – 55,000m3 concrete, 3,000t steel) 109Million • As Program Scheduler shall provide an updated construction program where there has been a change in the date for practical completion or where there have occurred ant circumstances which had affected the progress of WUC. “Contractor’s Acceleration Proposal” is entitled by Engineer for detailing of additional labours, construction plant, estimate of hours of works required, additional supervision, extra costs and expenses and a draft revised construction programme showing the revised date for practical completion which shall be implemented to achieve the proposed acceleration.
-
-
SITE ENGINEER - CONTRACT
-
Feb 2009 - Oct 2009
Contract with Calibre Project scope in civil and concrete work; (20,000m3 concrete, 1,000t steel) 33Million • Granted responsibility for any rectification works, made necessary by the contractor. Such works shall be undertaken in such a manner as to minimise the disruption of further production or construction to the Engineer or the Company. • Report to Project Director/ Construction Manger and responsible for all construction activity including quality activities, weekly report, ensure subcontractor comply with Company and project requirements, review of purchasing documents, recommend and carry out disposition of Non Conformance, initiate action to prevent recurrence of Non Conformance, preparation and implementation of special work instructions where additional information is required, ensure the records required in the operation of the quality management system are properly maintained an responsible project and quality documentation.
-
-
SUPERVISING ENGINEER
-
Nov 2008 - Feb 2009
Contract with Fuel Tank & Pipe construction rail unloading facility; (700m3 concrete, 30t steel) 1.3 Million • Generally monitor construction works and assist workers in any technical design issues or construction constrain. • Reinforcing construction schedule and complete within the time frame according from contract tender.
-
-
Project Engineer
-
Jan 2007 - Nov 2008
Contract role with Construction Company constructing concrete structures for the mining industry; (33,000m3 concrete, 1,900t steel) 53Million• Granted responsibility on progress claim, variation claim, technical query, MDR, QMR, NCR, AS Built Drawings, three week look ahead, accommodation forecast, client corresponded, concrete pre-pour inspection, and site supervision in response to proposed many practical suggestions which were implemented by supervisor/management.
-
-
Education
-
Curtin University of Technology
Bachelor of Engineering (B.E.), Civil Engineering