Chenggang Wu
Ass Instrument Engineer-DCS at CNOOC and Shell Petrochemicals Company Limited- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
CNOOC & Shell
-
Chemical Manufacturing
-
200 - 300 Employee
-
Ass Instrument Engineer-DCS
-
Sep 2011 - Present
MOC draft and implementation Spurious trip analysis for key equipment to assist operationDaily checking in DCS System IPS System & Sub System. And trouble shooting for them.Attend 2010 TA instrument work in field instrument teamAttend 2015 TA and 2021 TA instrument work in DCS teamThe main works have been achieved as following1) Implement Loop check and function test during commissioning and start up.2) Do PM work with schedule and implement normal & emergency troubleshooting.3) MOC draft and implementation in accordance with CSPC HSE management System.4) Daily checking in DCS System IPS System & Sub System5) Spurious trip analysis for key equipment to assist operation.6) Spare parts available.CC2 2015 /2021TA Preparation.7) DCS CS3000 Upgraded successfully to CENTUM VP in 2015 TA.8) IPS/FGS Tristation1131 4.6.0 Upgraded successfully to Tristation1131 4.9.0 in 2015 TA.9) POD TDAS Upgraded from CIU880 Prime/Plus to CIU888 Successfully in 2016.10) Installed Micro Soft Critical patch KB4019624 successfully for IPS&FGS in 2017.11) Add a soft switch for switching MPG unit in Max-MPG MODE and Max DPG MODE.PC-MFPO-5500-3007 in 201812) Participate in DCS Factory Acceptance Testing (FAT) for POD2 in 2019.13) Write CC2 DCS internal training relevant course in 2020 (Recipe operation Guide).14) Participate in DCS site Acceptance Testing (SAT) For POD2 in 2020.15) Build Emulator of MAS Server to support process control off line order test for LCC in 2020.16) Write program code to optimize process control for POD project in 2021.17) Set up Emulator of ENGHIS to support process control off line Function test for POD in 2021.18) Attend C1 CSPC NanHai IACS Network Upgrade Project work in 2021 Show less
-
-
Ass Instrument Engineer- Field
-
Apr 2004 - Sep 2011
Implement Loop check & function test during commissioning and trouble shooting in start up period.Spare parts available. Plan layout and coordinate preventive maintenance in SAP system (P31).PM and calibration etc. .Instrument technical support for Turnaround and start up including management TA contractor.Supply instrument training support from vendor documents.Attend 2010 TA instrument work in SMPO plant.
-
-
-
Pan Jin Ethylene Company limited
-
Liao Ning PanJin
-
Instrument Engineer
-
Dec 1988 - Apr 2004
Maintenance for Conventional instrument TC. RTD .Valve positioners. transimitters .bagging system so on. Respond to management of DCS PLC work Including change configuration and draft MOC in accordance with process requirement. and implement system & application software backup in plant shutdown period. Maintenance for Conventional instrument TC. RTD .Valve positioners. transimitters .bagging system so on. Respond to management of DCS PLC work Including change configuration and draft MOC in accordance with process requirement. and implement system & application software backup in plant shutdown period.
-
-
Education
-
South China University of technology
Undergraduate Education Bachelor degree, Electrical Engineering and Automation -
Da Lian University of foreign languages
College degree, Major in English