Chelladurai Boopathy

Aviation Fuel Consultant at AvEn Consultants Private Limited
  • Claim this Profile
Contact Information
Location
Dubai, AE
Languages
  • English Full professional proficiency
  • Tamil Native or bilingual proficiency
  • Hindi Professional working proficiency
  • Telugu Limited working proficiency

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Associate Member
    Energy Institute
    May, 2019
    - Sep, 2024
  • Inspect to JIG Standards
    JIG (Joint Inspection Group)
    Nov, 2017
    - Sep, 2024
  • Trained in Aviation Fuel Quality Control
    Energy Institute
    Oct, 2016
    - Sep, 2024
  • Associate Member
    Institution of Mechanical Engineers
    Jan, 2008
    - Sep, 2024
  • ISO 9001 Lead Auditor - Quality Certification
    Bureau Veritas Group

Experience

    • India
    • Aviation and Aerospace Component Manufacturing
    • 1 - 100 Employee
    • Aviation Fuel Consultant
      • Aug 2018 - Present

      Technical Consultant to Larsen & Toubro Limited for Delhi International Airport Limited Terminal 1 Expansion Technical Consultant to Larsen & Toubro Limited for Hyderabad International Airport Fuel Hydrant System (South Remote Apron, East and West Pier expansion) Technical Consultant representing eJet International Limited / Turner in turn representing BIAL (Bangalore International Airport Limited) for SP1, SP2 & SP3 Fuel Hydrant System Technical Consultant representing… Show more Technical Consultant to Larsen & Toubro Limited for Delhi International Airport Limited Terminal 1 Expansion Technical Consultant to Larsen & Toubro Limited for Hyderabad International Airport Fuel Hydrant System (South Remote Apron, East and West Pier expansion) Technical Consultant representing eJet International Limited / Turner in turn representing BIAL (Bangalore International Airport Limited) for SP1, SP2 & SP3 Fuel Hydrant System Technical Consultant representing eJet International Limited for Luxembourg Finder Airport Fuel Farm Expansion Technical Consultant to Delhi Aviation Fuel Facility Pvt Limited (DAFFPL) for Cargo Expansion Technical Consultant representing eJet International Limited for Hamad International Airport - Qatar (Western Fuel Farm and Mid-field Fuel Farm) Show less Technical Consultant to Larsen & Toubro Limited for Delhi International Airport Limited Terminal 1 Expansion Technical Consultant to Larsen & Toubro Limited for Hyderabad International Airport Fuel Hydrant System (South Remote Apron, East and West Pier expansion) Technical Consultant representing eJet International Limited / Turner in turn representing BIAL (Bangalore International Airport Limited) for SP1, SP2 & SP3 Fuel Hydrant System Technical Consultant representing… Show more Technical Consultant to Larsen & Toubro Limited for Delhi International Airport Limited Terminal 1 Expansion Technical Consultant to Larsen & Toubro Limited for Hyderabad International Airport Fuel Hydrant System (South Remote Apron, East and West Pier expansion) Technical Consultant representing eJet International Limited / Turner in turn representing BIAL (Bangalore International Airport Limited) for SP1, SP2 & SP3 Fuel Hydrant System Technical Consultant representing eJet International Limited for Luxembourg Finder Airport Fuel Farm Expansion Technical Consultant to Delhi Aviation Fuel Facility Pvt Limited (DAFFPL) for Cargo Expansion Technical Consultant representing eJet International Limited for Hamad International Airport - Qatar (Western Fuel Farm and Mid-field Fuel Farm) Show less

    • United Kingdom
    • Oil and Gas
    • 1 - 100 Employee
    • Design Engineering Manager
      • Apr 2014 - Jan 2018

      Project Lead for Dublin Airport Fuel Farm DFBOT design Review and approve design for the Construction of three new tanks within the fuel farm and the Hydrant system Onsite construction review to check compliance with Design requirements Project Lead for Luxembourg airport P7 Hydrant system design Design the overall hydrant system with provisions made to connect to DFBOT Fuel Farm for future tie-in. Design includes - Refuelling Study, Hydraulic Analysis, General arrangement, and… Show more Project Lead for Dublin Airport Fuel Farm DFBOT design Review and approve design for the Construction of three new tanks within the fuel farm and the Hydrant system Onsite construction review to check compliance with Design requirements Project Lead for Luxembourg airport P7 Hydrant system design Design the overall hydrant system with provisions made to connect to DFBOT Fuel Farm for future tie-in. Design includes - Refuelling Study, Hydraulic Analysis, General arrangement, and Longitudinal section drawings. MTO extract and Procurement assistance for the long lead items. Other Major projects involved Learnt principles of DFBOT (Design Finance Build Operate & Transfer) in Fuel Farm Planning Assistance for the Fuel System at New International Airport for Mexico City (NAICM) Q8 Petroleum – Chonburi Terminal Thailand. Instrumental in tendering for the Changi East Airport, Singapore project in JV with AECOM. Design Lead for 3 projects at Singapore Changi Airport: (i) Extension of Fuel Hydrant System for New Aircraft Parking Stands for 500 Series (8 New Bays) and 600 Series (2 New Bays); (ii) Extension of Fuel Hydrant System for Three New Code C Aircraft Parking Stands at the Former Budget Terminal; (iii) Extension of Fuel Hydrant System for 26 New Aircraft Parking Stands at South End Reservoir for Terminal 4 All of which required the optimisation of aircraft parking on stopbars in order to safeguard hydrant fuelling; this was achieved by CAD modelling of aircraft being fuelled on each stopbar of each stand. From this, aviation fuel hydrant pit positions were defined, and then the risers/spurs and main lines were designed including high point vents, low point drains and valve chambers. Valve chambers were strategically located and configured for isolation and leak detection / tightness monitoring purposes) Materials management (specifications and MTO) followed. Was also responsible for review of contractor submissions (e.g. method statements, procedures etc.). Show less Project Lead for Dublin Airport Fuel Farm DFBOT design Review and approve design for the Construction of three new tanks within the fuel farm and the Hydrant system Onsite construction review to check compliance with Design requirements Project Lead for Luxembourg airport P7 Hydrant system design Design the overall hydrant system with provisions made to connect to DFBOT Fuel Farm for future tie-in. Design includes - Refuelling Study, Hydraulic Analysis, General arrangement, and… Show more Project Lead for Dublin Airport Fuel Farm DFBOT design Review and approve design for the Construction of three new tanks within the fuel farm and the Hydrant system Onsite construction review to check compliance with Design requirements Project Lead for Luxembourg airport P7 Hydrant system design Design the overall hydrant system with provisions made to connect to DFBOT Fuel Farm for future tie-in. Design includes - Refuelling Study, Hydraulic Analysis, General arrangement, and Longitudinal section drawings. MTO extract and Procurement assistance for the long lead items. Other Major projects involved Learnt principles of DFBOT (Design Finance Build Operate & Transfer) in Fuel Farm Planning Assistance for the Fuel System at New International Airport for Mexico City (NAICM) Q8 Petroleum – Chonburi Terminal Thailand. Instrumental in tendering for the Changi East Airport, Singapore project in JV with AECOM. Design Lead for 3 projects at Singapore Changi Airport: (i) Extension of Fuel Hydrant System for New Aircraft Parking Stands for 500 Series (8 New Bays) and 600 Series (2 New Bays); (ii) Extension of Fuel Hydrant System for Three New Code C Aircraft Parking Stands at the Former Budget Terminal; (iii) Extension of Fuel Hydrant System for 26 New Aircraft Parking Stands at South End Reservoir for Terminal 4 All of which required the optimisation of aircraft parking on stopbars in order to safeguard hydrant fuelling; this was achieved by CAD modelling of aircraft being fuelled on each stopbar of each stand. From this, aviation fuel hydrant pit positions were defined, and then the risers/spurs and main lines were designed including high point vents, low point drains and valve chambers. Valve chambers were strategically located and configured for isolation and leak detection / tightness monitoring purposes) Materials management (specifications and MTO) followed. Was also responsible for review of contractor submissions (e.g. method statements, procedures etc.). Show less

    • India
    • Construction
    • 700 & Above Employee
    • Aviation Fuel Consultant
      • Sep 2013 - Mar 2015

      Abu Dhabi International Airport (ADAC) UAE Represented the Employer as an Expat and Lead the Fuel Hydrant System Team MTO extract, MR Preparation (Material Requisition), Techno-commercial evaluation of vendor submissions SAT (Site Acceptance Test) and FAT (Factory Acceptance Test) of vendor supplied components Viz Valves, Filters etc Managed Sub-Contractors for Construction, ESB, Leak Detection System (LDS) and CP system Developed Testing & Commissioning Procedure which… Show more Abu Dhabi International Airport (ADAC) UAE Represented the Employer as an Expat and Lead the Fuel Hydrant System Team MTO extract, MR Preparation (Material Requisition), Techno-commercial evaluation of vendor submissions SAT (Site Acceptance Test) and FAT (Factory Acceptance Test) of vendor supplied components Viz Valves, Filters etc Managed Sub-Contractors for Construction, ESB, Leak Detection System (LDS) and CP system Developed Testing & Commissioning Procedure which includes Soak Testing, Hydrotesting & Flushing Designed the Hydrant System in compliance with ASME B31.4 Served as the single point of contact for client, inter-department team, construction team and vendors for design activity Show less Abu Dhabi International Airport (ADAC) UAE Represented the Employer as an Expat and Lead the Fuel Hydrant System Team MTO extract, MR Preparation (Material Requisition), Techno-commercial evaluation of vendor submissions SAT (Site Acceptance Test) and FAT (Factory Acceptance Test) of vendor supplied components Viz Valves, Filters etc Managed Sub-Contractors for Construction, ESB, Leak Detection System (LDS) and CP system Developed Testing & Commissioning Procedure which… Show more Abu Dhabi International Airport (ADAC) UAE Represented the Employer as an Expat and Lead the Fuel Hydrant System Team MTO extract, MR Preparation (Material Requisition), Techno-commercial evaluation of vendor submissions SAT (Site Acceptance Test) and FAT (Factory Acceptance Test) of vendor supplied components Viz Valves, Filters etc Managed Sub-Contractors for Construction, ESB, Leak Detection System (LDS) and CP system Developed Testing & Commissioning Procedure which includes Soak Testing, Hydrotesting & Flushing Designed the Hydrant System in compliance with ASME B31.4 Served as the single point of contact for client, inter-department team, construction team and vendors for design activity Show less

    • Automation Machinery Manufacturing
    • 700 & Above Employee
    • Senior Mechanical Engineer
      • Sep 2010 - Sep 2013

      Managed piping design drawings, calculation (thickness/schedule selection, reinforcement pad calculations pertaining to ASME B 31.3, Pressure drop and surge analysis), documents and equipment datasheets Handed responsibilities pertaining to ASME B 31.3 & ASME B 31.8 Supervised a team of 12 people and administering the contract document review and datasheet preparation in compliance with Shell DEP and respective client requirement Developed Design Deliverable as DIS (Document Index… Show more Managed piping design drawings, calculation (thickness/schedule selection, reinforcement pad calculations pertaining to ASME B 31.3, Pressure drop and surge analysis), documents and equipment datasheets Handed responsibilities pertaining to ASME B 31.3 & ASME B 31.8 Supervised a team of 12 people and administering the contract document review and datasheet preparation in compliance with Shell DEP and respective client requirement Developed Design Deliverable as DIS (Document Index Schedule) with scheduled dates Oversaw the preparation of piping design drawings such as piping layout, general arrangement drawings, pipe support detail drawing & construction Isometrics, pressure drop analysis and stress analysis reports Responsible for MTO (Material Take Off) extraction and supported procurement, material requisition review and datasheet approval Developing Process & Instrumentation Diagram (P&ID) for the overall Metering System Organised and handled Project Kick-Off Meeting, Design Review and Design Freeze Meeting for technical scope. Active part in initiating project HAZOP and final project HAZOP to address recommendations and initiated action plan to rectify repetitive errors after project completion Successfully pursued Nozzle Reinforcement Pad Calculation pertaining to ASME B 31.3 and substantiated the same with pressure vessel design code ASME Sec VIII Supervised and prepared PMS (Piping Material Specification) to suit process requirement Initiated frequent site visits and conducted fabricator yard visit to ensure systematic instruction flow Served as the single point of contact for client, inter-department team, construction team and vendors for design activity Proven track record in synchronising design teams across countries (India & Singapore) based on assignment Show less Managed piping design drawings, calculation (thickness/schedule selection, reinforcement pad calculations pertaining to ASME B 31.3, Pressure drop and surge analysis), documents and equipment datasheets Handed responsibilities pertaining to ASME B 31.3 & ASME B 31.8 Supervised a team of 12 people and administering the contract document review and datasheet preparation in compliance with Shell DEP and respective client requirement Developed Design Deliverable as DIS (Document Index… Show more Managed piping design drawings, calculation (thickness/schedule selection, reinforcement pad calculations pertaining to ASME B 31.3, Pressure drop and surge analysis), documents and equipment datasheets Handed responsibilities pertaining to ASME B 31.3 & ASME B 31.8 Supervised a team of 12 people and administering the contract document review and datasheet preparation in compliance with Shell DEP and respective client requirement Developed Design Deliverable as DIS (Document Index Schedule) with scheduled dates Oversaw the preparation of piping design drawings such as piping layout, general arrangement drawings, pipe support detail drawing & construction Isometrics, pressure drop analysis and stress analysis reports Responsible for MTO (Material Take Off) extraction and supported procurement, material requisition review and datasheet approval Developing Process & Instrumentation Diagram (P&ID) for the overall Metering System Organised and handled Project Kick-Off Meeting, Design Review and Design Freeze Meeting for technical scope. Active part in initiating project HAZOP and final project HAZOP to address recommendations and initiated action plan to rectify repetitive errors after project completion Successfully pursued Nozzle Reinforcement Pad Calculation pertaining to ASME B 31.3 and substantiated the same with pressure vessel design code ASME Sec VIII Supervised and prepared PMS (Piping Material Specification) to suit process requirement Initiated frequent site visits and conducted fabricator yard visit to ensure systematic instruction flow Served as the single point of contact for client, inter-department team, construction team and vendors for design activity Proven track record in synchronising design teams across countries (India & Singapore) based on assignment Show less

    • Assistant Engineering Manager
      • Mar 2007 - Aug 2010

      Handled technically challenging client and Received recognition for managing Aviation Fuel Hydrant system including multidisciplinary responsibility Received recognition for designing India’s longest 13 km Aviation Fuel Hydrant System in compliance with ASME B31.4 Published a technical database of pipe sizing, pressure drop analysis & surge analysis for developing in-house software and AS 2885.5 compliant database for field pressure testing Developing Process & Instrumentation Diagram… Show more Handled technically challenging client and Received recognition for managing Aviation Fuel Hydrant system including multidisciplinary responsibility Received recognition for designing India’s longest 13 km Aviation Fuel Hydrant System in compliance with ASME B31.4 Published a technical database of pipe sizing, pressure drop analysis & surge analysis for developing in-house software and AS 2885.5 compliant database for field pressure testing Developing Process & Instrumentation Diagram (P&ID) for the overall Fuel Farm and Hydrant System Developed Testing & Commissioning Procedure which includes Soak Testing, Hydrotesting & Flushing Tank Vent adequacy check in compliance with API 2000 Designed Piping System within the fuel farm in compliance with ASME B31.3 Supervised the design team to represent organisation for HAZOP Managed Sub-Contractors to deliver Cathodic Protection System, Emergency Shutdown System (ESB) Show less Handled technically challenging client and Received recognition for managing Aviation Fuel Hydrant system including multidisciplinary responsibility Received recognition for designing India’s longest 13 km Aviation Fuel Hydrant System in compliance with ASME B31.4 Published a technical database of pipe sizing, pressure drop analysis & surge analysis for developing in-house software and AS 2885.5 compliant database for field pressure testing Developing Process & Instrumentation Diagram… Show more Handled technically challenging client and Received recognition for managing Aviation Fuel Hydrant system including multidisciplinary responsibility Received recognition for designing India’s longest 13 km Aviation Fuel Hydrant System in compliance with ASME B31.4 Published a technical database of pipe sizing, pressure drop analysis & surge analysis for developing in-house software and AS 2885.5 compliant database for field pressure testing Developing Process & Instrumentation Diagram (P&ID) for the overall Fuel Farm and Hydrant System Developed Testing & Commissioning Procedure which includes Soak Testing, Hydrotesting & Flushing Tank Vent adequacy check in compliance with API 2000 Designed Piping System within the fuel farm in compliance with ASME B31.3 Supervised the design team to represent organisation for HAZOP Managed Sub-Contractors to deliver Cathodic Protection System, Emergency Shutdown System (ESB) Show less

    • Mechanical Maintenance Engineer
      • Jan 2004 - Feb 2007

      Designing and analysis of mechanical components Testing the Firefighting Pumps and Compressor at regular Intervals to Ensure Safety Operation & Maintenance of Mechanical Components Ensuring the Efficiencies of Boiler Feed Water Pump, Condensate Extraction Pump, Drain Extraction Pump, Dry Vacuum Pump & Air Compressors Deputation: Air Conditioning Plant Design at Sri Ramachandra Medical College. Chennai (Duration – 2 Months) Includes: Coordinating with vendors… Show more Designing and analysis of mechanical components Testing the Firefighting Pumps and Compressor at regular Intervals to Ensure Safety Operation & Maintenance of Mechanical Components Ensuring the Efficiencies of Boiler Feed Water Pump, Condensate Extraction Pump, Drain Extraction Pump, Dry Vacuum Pump & Air Compressors Deputation: Air Conditioning Plant Design at Sri Ramachandra Medical College. Chennai (Duration – 2 Months) Includes: Coordinating with vendors and subcontractors. Coordinating the design aspects with the consultant Project planning, MTO preparation and material follow up. Pipe Routing Show less Designing and analysis of mechanical components Testing the Firefighting Pumps and Compressor at regular Intervals to Ensure Safety Operation & Maintenance of Mechanical Components Ensuring the Efficiencies of Boiler Feed Water Pump, Condensate Extraction Pump, Drain Extraction Pump, Dry Vacuum Pump & Air Compressors Deputation: Air Conditioning Plant Design at Sri Ramachandra Medical College. Chennai (Duration – 2 Months) Includes: Coordinating with vendors… Show more Designing and analysis of mechanical components Testing the Firefighting Pumps and Compressor at regular Intervals to Ensure Safety Operation & Maintenance of Mechanical Components Ensuring the Efficiencies of Boiler Feed Water Pump, Condensate Extraction Pump, Drain Extraction Pump, Dry Vacuum Pump & Air Compressors Deputation: Air Conditioning Plant Design at Sri Ramachandra Medical College. Chennai (Duration – 2 Months) Includes: Coordinating with vendors and subcontractors. Coordinating the design aspects with the consultant Project planning, MTO preparation and material follow up. Pipe Routing Show less

Education

  • Indian Institute of Technology, Bombay
    Piping Engineering, Piping Engineering
    2007 - 2007
  • Anna University
    Master of Engineering - MEng, Engineering/Industrial Management
    2002 - 2004
  • Annamalai University
    Bachelor of Engineering - BE, Mechanical Engineering
    1998 - 2002

Community

You need to have a working account to view this content. Click here to join now