Chee Teck Leong

Senior LEW Engineer at Barghest Building Performance Pte Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Singapore, SG

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Building Construction Safety Supervisor
    Ministry of Manpower
  • Certificate of Merit - ITE
    -
  • Confined Space Assessor
    NTUC LearningHub
  • Construction Safety Course for Project Manager
    EVERSAFE CONSULTANTS PRIVATE LIMITED
  • Licence Electrical Worker-Grade 8
    Energy Market Authority (EMA)
  • Supervise Tunnelling Work for WSH
    EVERSAFE CONSULTANTS PRIVATE LIMITED
  • Work At Height Assessor
    Scal Academy

Experience

    • Singapore
    • Environmental Services
    • 1 - 100 Employee
    • Senior LEW Engineer
      • Apr 2020 - Present

    • China
    • Civil Engineering
    • 100 - 200 Employee
    • LEW
      • Feb 2019 - Mar 2020

      Involve in Utilities Diversion planning Perform Monthly Electrical Tools Inspection Involve in Utilities Diversion planning Perform Monthly Electrical Tools Inspection

    • LEW and Electrical Engineer
      • Aug 2015 - Jan 2019

      Working Cable Tunnel and building construction. 1. Inspection of Electrical tools 2. Switching of LV Switchboard. 3. Project management. 4. Drafting of drawings 5. Calculation of cable size 6. Preparation of IO list, BOQ, installation planning. 7. Reviewing of electrical and control drawings. 8. Troubleshooting of controls. Working Cable Tunnel and building construction. 1. Inspection of Electrical tools 2. Switching of LV Switchboard. 3. Project management. 4. Drafting of drawings 5. Calculation of cable size 6. Preparation of IO list, BOQ, installation planning. 7. Reviewing of electrical and control drawings. 8. Troubleshooting of controls.

    • Senior Project Engineer
      • Feb 2007 - Aug 2015

      Provide Environmental solution to Wafer Fab 1. Design Power and Control circuit for Environmental system. 2. Project Management 3. Troubleshooting of control. 4. Project planning, purchasing, installation schedule. 5. Provide training. 6. Have good knowledge on various VFD make (ABB, schneider, Danfoss). 7. Have knowledge on ANALYTICAL instruments, flow, level and pressure instruments(E&H and Emerson) 8. Work on High DC power equipment. 9. Work on different PLCs (Mitsubishi, Allen Bradley contrologix, Siemens, Schneider). 10. Work in Chemical plant, Pharmaceutical plant, Wafer plant. Show less

    • Project Engineer
      • 2005 - 2007

      Upgrading work on HV and LV system at Ulu Pandan Water Reclamation Plant. Work on Changi Water Reclamatiom plant and Drop shafts. Work on Sea-cooling system for Singapore Changi Naval Base. Upgrading work on HV and LV system at Ulu Pandan Water Reclamation Plant. Work on Changi Water Reclamatiom plant and Drop shafts. Work on Sea-cooling system for Singapore Changi Naval Base.

    • Assistant Project Engineer
      • 2003 - 2005

      Upgrading works on HV and LV system of Seletar Water Reclamation Plant. Upgrading works on HV and LV system of Seletar Water Reclamation Plant.

    • Project Supervisor
      • 1996 - 2001

      Upgrading work on Sewerage Pumping Station in Singapore. Upgrading work on Senoko power HV Fan. Upgrading work on Bedok Water Reclamation Plant. Upgrading work on Sewerage Pumping Station in Singapore. Upgrading work on Senoko power HV Fan. Upgrading work on Bedok Water Reclamation Plant.

Education

  • Singapore Polytechnic
    Diploma, Electrical Engineering
    1994 - 1996

Community

You need to have a working account to view this content. Click here to join now