Cheah Weng Yew

Project Manager at Kyudenko Malaysia Sdn Bhd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia, MY

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Malaysia
    • Construction
    • 1 - 100 Employee
    • Project Manager
      • Dec 2017 - Present

      Involve tender BQ preparation, client specification meeting, cost comparison & prepare project budget, site arrangement & monitoring, supervision subordinates and testing & commissioning for electrical work, electrical design, datasheet preparation, BQ for power cables and instrument cable and Fiber optic cable and etc. Also strategically looking for new potential clients.Project involved / Clients on hand:1-Canon Machinery (M) Sdn Bhd2-Mitsui Copper Foil (M) Sdn Bhd3-GS Paperboard & Packing Sdn Bhd4-Denso (Malaysia) Sdn Bhd5-Kayaku Safety Systems Malaysia Sdn Bhd6-Mitsui-Soko (M) Sdn Bhd7-British American Tobacca Malaysia 8-Takenaka (Malaysia) Sdn BhdAdditional, involved in authority application such as application of power supply with TNB for 11kV substation and dealing with consultants.

    • Iran
    • Oil and Gas
    • 1 - 100 Employee
    • Senior Electrical Planner
      • Dec 2016 - Nov 2017

      Involved RAPID (Refinery and Petrochemical Integrated Development) Project for Package 2 in Pengerang, Johor.Job Functions:1-Internal coordination works for electrical and instrumentation activity by chair the meeting with client (Petronas team) and Sinopec’s subcontractors, suppliers and procurement team. 2-Update project planning & status with P6 Primavera software, project progress S-curve and preparation of weekly and monthly plan for work out the available work front such as earthing works, cable ladder works, cable laying works, electrical equipment such as transformer, switchgear, MSB and DB.3-Prepare non-process and process pre-commissioning plan level 4 schedule with P6 Primavera software.

    • Australia
    • Industrial Machinery Manufacturing
    • 300 - 400 Employee
    • Senior Electrical and Instrumentation Engineer
      • May 2014 - Dec 2016

    • Malaysia
    • Building Materials
    • 100 - 200 Employee
    • Senior Electrical Engineer
      • May 2008 - Apr 2014

      Implement and oversee improvement projects at various cements plant in Perak Hanjoong Cement, Pahang Cement, Pasir Gudang Grinding Plant, West Port Grinding Plant and Batu Caves Packing Plant.Job scope involved:Installation of electrical, PLC, DCS and instrumentation works. Familiar with LV & HV equipment, P&ID, communication bus such as Profibus, TCP/IC Modbus, LAN cable and Fiber optic cables to tie in existing system. Design for MCC single line diagram, calculation of cable Voltage drop and tabulate table for all cable thickness. Selection of PLC I/O card and signals and SCADA works.Projects:1-Cement mill separator project2-Cement transport from cement mill to cement silo3-Upgrading of 4 numbers of cement silo4-Railway cement bulk loading extraction5-Plant raw material online analyser 6-Alternative fuel for tyre chips feed in to Kiln7-Railway weighbridge8-New palletising plant9-PFA dosing system10-Carbon raw silo system11-6.6kV MV switchgear extension12-Roller press system

Education

  • University of Malaya
    Master of Business Administration - MBA, Business Administration and Management, General
    2013 - 2017
  • Liverpool John Moores University
    Bachelor of Engineering - BE, Electrical and Power Transmission Installation/Installer, General
    2004 - 2004
  • Tunku Abdul Rahman University College
    Advanced Diploma in Engineering, Electrical and Electronics Engineering
    1999 - 2003

Community

You need to have a working account to view this content. Click here to join now