Chaudhary Rajkumar

Project Engineer at Sterling oil and gas
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Raipur, Chhattisgarh, India, IN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • 1 - 100 Employee
    • Project Engineer
      • Jul 2023 - Present
    • India
    • Construction
    • 400 - 500 Employee
    • Engineer Hydrotesting
      • Aug 2021 - Present

      Responsible for the proper distribution of manpower and P&ID according to the work volumes to be carried out of all supervisors and workers under my supervision. Proper scheduling and coordinates all AG and UG piping of (HGU)hydrogen generation unit-(MPR)main pipe rack and train one and train two including compressor unit. For hydro testing, flushing and drying, currently pre. Commissioning activity going- on with our Clint DORC card-board blasting AG piping, and water flushing of UG fire fighting pipe lines. Prepare and implement required PTW (Permit to Work System) specifically the ISSOW (Integrated Safe System of Work) that includes toolbox meeting, TSTO (Total Safety Task Observation) and TSTI (Total Safety Task Instruction Show less

    • Kuwait
    • Motor Vehicle Manufacturing
    • 300 - 400 Employee
    • Mechanical Engineer
      • Oct 2018 - Jan 2021

      Review client project specifications and drawings prior to commencement of work from manifold (FM)No. 1 to 14 and gathering centre (GC) No: 09,(GC) No.10, (GC)No.11, (GC) No.12, (GC) No.13, (GC)No. 22, and(GC)No.23 total 108 kilometres connecting UG and AG network East-West Kuwait Pipeline Project. Responsible for the preparation of Mechanical, Commissioning, Cleaning Gauging, Hydro testing, Pneumatic test, Retesting and. Pre Commissioning Swabbing, Drying, Nitrogen Purging of the pipeline and integrity projects works. Study of the P&ID diagrams of the process stations for Commissioning. Preparing of Auto CAD Drawings of Piping and Hydro testing procuring all the inventory and materials required for the execution of project. Executing the project with available man power and resources within the stipulated time. Interacting with the client regarding the progress of the project. Preparing and submitting filled Hydro testing reports to the client. Responsible for safety of all personal involved in the operation. Responsible for the proper distribution of manpower and drawings according to the work volumes to be carried out of all workers under my supervision. Scope of work includes fabrication and installation of mechanical works to partial hydro-testing for priority lines final box up manifold of (GC) 09, 10, and 11. Checking of isometric, P&id related drawings that does not conform to mechanical general arrangement P&ID, PEFS (Process Engineering Flow Scheme) DEP (Design Engineering Practice), Specification and Project Standards. Carry out Mechanical final inspection, line checking, and prepare punch list based on isometric, mechanical general arrangements, & P&ID as per test packages/test system. Prepare & implement required PTW (permit to work. System) specifically the ISSOW (Integrated safe system of work) that I includes toolbox meeting, TSTO. (total safety task observation)TSTI (total. Safety task instruction) Show less

    • United Arab Emirates
    • Oil and Gas
    • 700 & Above Employee
    • Supervisor Piping
      • Nov 2015 - Mar 2018

      Review client project specifications and drawings prior to commencement of work from YANBU refinery KM: -06 to KM: 186 substation No-2 MADEENA 56’’ EWP-2 Loop-2. And 48’’pipeline KM 00 to KM 156 RABIGH petroleum and 30’’pipeline connecting (KAEC) King Abdullah Economic city Saudi Arabia. Responsible for the preparation of piping and structures materials as per drawing requirements Valves station YANBU to MADEENA corridor worked valves station no:02, 03, 05, 06, 09, 10, 11, and 14, 15, 18, 19. And KAEC Corridor YANBU to RABIGH Corridor total KM:156 valves stations No.01, 02, 03, 04, 07, 08 and substation rabigh and (KAEC) King Abdullah Economic city. proper planning and scheduling of work Key skills: Commissioning and precommissioning of pipelines, Hydro testing, Pneumatic testing, Leak testing, Drying, Swabbing, Dewatering, Cleaning, Flooding, Gauging, Intelligent pigging, Caliper survey, Nitrogen preservation, Decommissioning activities. Monitor and control of test activities. Prepare test reports of the activities performed and submit to the manager. Co-ordination with other teams such as QA/QC, Hertfordshire. laying of 56’’ 48’’ and 30’’ pipes field joint fit up and spools fabrication in the febshop rabigh camp:2 for valves station installation pipe spools valves and assembly structure for control panel and battery rooms. Responsible for the proper distribution of manpower and drawings according to the work volumes to be carried out of all workers under my supervision underground in born feet and installation burner. Carry out piping final inspection, line checking, and prepare punch list based on isometric, piping general arrangements and P&ID as per test packages /test system. Prepare & implement required permit to work. System. specifically the Integrated safe system of work. total safety task observation. total. Safety task instruction. I'm authorised PTW receiver by Saudi Aramco. Show less

    • Piping Supervisor
      • Jan 2013 - Oct 2014

      Review client project specifications and drawings prior to commencement of work pipe spools assembly and erection in unit No. 754, 753, 752. Responsible for the preparation of piping and structural materials as per drawing requirements as pipe support installation of 72’’, 74’’, 102’’, 108’’. Responsible for the proper planning and scheduling of work heavy(GOV) and (MOV) valves erection on the 60mtrs elevation valves weight 15tons to 36tons. Responsible for the proper distribution of manpower and drawings according to the work volumes to be carried out of all workers under my supervision. Supervision, proper scheduling and coordinates all piping and structural works. Checked the operability and accessibility of installed equipment a materials, Checked the actual constructed Mechanical in accordance with job Spec, Drawings, calculation result vendor’s instruction and P & ID etc. CO-ordination with other discipline Engineers in respect of engineering and designing. Problem solving and decision making. according to the construction schedule and reviewing quality of constructing work done, proper corrective action such as preparation of field changes shall be taken based on instruction of field Engineering Manager. Internal contacts with Field Engineering Manager, Discipline Field Engineer, schedule controller and Material Controller. External contacts are with the Client Engineer and Vendors. Safety and impose no lost time injury. I'm authorised PTW receiver by ADNOC. Show less

    • Supervisor Pre.commissionig
      • Apr 2011 - Jan 2013

      Duties And Responsibilities :-Acknowledged project specification and related procedures, implementation of contracts drawing and specification. Responsible for the pre-commissioning and start up of the LNG plant including all utilities inside the process unit. Supervise pre-commissioning group along.including clients operator to ensure clear understanding of pre-commissioning and commissioning requirements. Development pre-commissioning and commissioning procedures and marked up drawings. Coordinate final punch and clearance of punch list items as per TOSTR priorities. Coordinate instrumentation function test and loop testing. Conducted and coordinated mechanical running of equipment such as pump compressors and air fin fan coolers. I'm authorised PTW receiver by sonatrach. Show less

    • United States
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Piping Supervisor
      • Jul 2010 - Jan 2011

      my responsibility is execution of piping fabrication & erection at PTU and coustic storage unit. thorough my fild Engineer and staff directly coordinate. and supervise day to day constretion of the project. in accordance with project specification drawings. instructions in a proper and work manlike manner. and according to the planning and achieve maximum production. and I am carrying out correspondence on technical matters. with the client subject to constretion manages approval. among the constant review of the contractual programs and fortnightly planning sheets. regular daily meeting with my engineer to discuss progress and site problems. after completion of job. I have been carrying out the test pack system. punch list monitoring and sub systems clearance. Show less

    • Italy
    • Oil and Gas
    • 700 & Above Employee
    • Piping Supervisor
      • Aug 2008 - May 2010

      Acknowledge project specification and related procedures. implementation of contracts drawing and specification. supervision of sub-contractors. monitoring and coordinate the work through the course of installation. inspection of piping tolerance as set by the company standards. conforms latest drawings and specification are issues on schedule to monitor and expendite the availability of materials on a daily/ weekly basis. Pipe fabrication in Aksai fabshop yard. pipe assembly spools and shoe support's, saddle supports erection at pipe rack. valves and fire fighting equipment installation. karachaganak LNG project train 4th Connection with the battery limits.and pumps house etc. Show less

    • Canada
    • Research Services
    • Piping Supervisor
      • Nov 2007 - Apr 2008

      My duties and Responsibilities very good cooperation between workers and Engineers for general shut down Coordination, Fabrication, Erection and Alignment, Assembly of pipes having Dia 2" up to 24" CS And SS pipes spools. for gas and petrochemicals pipe Line in gulf petrochemical Bahrain. Fabrication and installation of cable trey from control room to instruments valves. My duties and Responsibilities very good cooperation between workers and Engineers for general shut down Coordination, Fabrication, Erection and Alignment, Assembly of pipes having Dia 2" up to 24" CS And SS pipes spools. for gas and petrochemicals pipe Line in gulf petrochemical Bahrain. Fabrication and installation of cable trey from control room to instruments valves.

Education

  • National Institute of Technology Jamshedpur
    Diploma in mechenical engeering, Oil and gas
    2004 - 2007

Community

You need to have a working account to view this content. Click here to join now