Charlie B.

Contract’s Manager at HS RoofClad
  • Claim this Profile
Contact Information
Location
United Kingdom, GB
Languages
  • English Native or bilingual proficiency
  • Thai Limited working proficiency

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Contract’s Manager
      • Apr 2022 - Present

    • Ireland
    • Construction
    • 1 - 100 Employee
    • Construction Site Manager
      • Nov 2020 - Sep 2021

    • United Arab Emirates
    • Executive Offices
    • 1 - 100 Employee
    • Construction Site Manager
      • Jul 2019 - Apr 2020

    • Qatar
    • Civil Engineering
    • 1 - 100 Employee
    • Construction Superintendent
      • Sep 2018 - Jun 2019

    • Qatar
    • Construction
    • 300 - 400 Employee
    • Construction Manager
      • Feb 2018 - Aug 2018

      Facades Construction Manager - Doha Metro Redline Facades Construction Manager - Doha Metro Redline

    • Construction Site Manager
      • Jun 2015 - Dec 2017

      Completed 350,000 m2 of Kalzip standing seam roof finishing works on the KAIA Airport in Jeddah KSA Completed 350,000 m2 of Kalzip standing seam roof finishing works on the KAIA Airport in Jeddah KSA

    • Construction Coordinator
      • Jan 2013 - Jan 2015

      Construction Coordinator January 2013 – January 2015 FLUOR/SEPAMConstruction Coordinator MA’ADEN Aluminium Smelting Plant RAS AL KHAIR (Saudi Arabia) MA ‘Aden aluminium smelting plant project scope consisted of steel structure, composite cladding panel, composite roof panel with specialist TPO membrane, Facades, Flashing and gutters to finish off to design specification. My roll consisted of: • Overseeing the day to day running of the full Roofing and Cladding package. • Liaise with the client team and main contractor to insure the installation of roofing panel, wall cladding panel, flashing’s and all finishing work is to the correct design specification. • Advising client and contractor on best practice methods • Approve any changes to design specifications within my scope of works. • Planning and coordination of schedules of work for main contractor and sub-contractors while collecting all progress information for work programs and where necessary taking corrective action to meet, and exceed the clients expectations. • Ensuring the quality of installation is to the highest standard while adhering to the schedule and budget whilst maintaining OSHA health and safety standards • Attend monthly, weekly and daily meetings with main contractor and the client to actively come up with progressive plans to not only meet but beat deadlines. • The changing and signing off on design changes where I felt it would benefit the schedule and budget.

    • Site Manager
      • Nov 2008 - Nov 2012

      November 2008 – December 2012 ​​ G/N/LSite supervisor / coordinator​​ at New Doha International Airport (NDIA) • Coordinating and supervising all areas of the roofing and cladding using products from Rigidal aluminium standing seam roofing system and flashing build up, promplan cladding system, skylights and louvers.• Advising sub-contractors on advanced installation techniques and methods to increase productivity and quality of work produced.• Offering solutions and technical back up on several key design issues, using vast experience gained within the industry to allow for sensible and achievable resolutions to design issues. • Ensuring quality control was adhered too.• Liaising with the product suppliers to ensure all material is available and correct to the project specifications.• Adhering to the project specifications to ensure all works undertaking are within the allotted perimeters accepted by the client.• Implementing and enforcing health and safety measures to ensure safe working areas and practises were followed.• Completing risk assessments.

    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Site Supervisor
      • Jan 2006 - May 2008

      January 2006- May 2008 ​​SD Samuels Cladding/roofing UKSite Supervisor Assigned to various projects across Britain working on large scale commercial buildings ranging from 5,000 m2 to 50,000 m2 comprising of industrial warehouses and large multi-storey multifunction shopping malls. Responsible for the supervision and instillation of various roofing systems, cladding, skylight and facades. • Workforce supervision of team up to 30 staff including effective planning and distribution of resources leading to significant cost savings.• Setting out to ensure correct dimensions / measurements for installation.• Installation of complex roofing systems and cladding.• Liaise with main contractor to resolve site issues.• Adherence to stringent Health and Safety policies and procedures.• Ensure on-time delivery of essential material.

Education

  • Isle colledge
    1992 - 1994
  • Queens school wisbech
    1987 - 1992

Community

You need to have a working account to view this content. Click here to join now